← Back
STATEN ISLAND
76 HEMPSTEAD AVENUE
STATEN ISLAND · New Dorp-Midland Beach · BIN 5177659
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open Violations
Locations of Work
StructuralPlumbing
Attic3 filings · 18 docs
Floor 33 filings · 18 docs
Floor 23 filings · 18 docs
Floor 12 filings · 6 docs
Site & exterior4 filings · 19 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A TECH ENGINEERING NYC, PLLC.302/18/2025
THINK DESIGN ARCHITECTURE501/13/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738401/13/2025
Building Lifecycle
All (48)Filed (8)Permit Issued (8)Signed Off (5)Violation (1)Inspection (10)Special Inspection (16)
04/04/2025
Signed off — Alteration
Installation of new fire sprinkler system with valves and meters for same.
S00345044-I1
04/02/2025
Signed off — Alteration
APPLICATION FILED FOR PLUMBING AND GAS WORK ASSOCIATED TO NEW BUILDING #520453606.
S00317578-I1
03/26/2025
Signed off — Alteration
S00667647-I1
03/24/2025
Signed off — Alteration
APPLICATION FILED FOR 10'-0" CURB CUT ALONG HEMPSTEAD AVENUE. FILED IN CONJUNCTION WITH NEW BUILDING #520453606.
S00317514-I1
03/21/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/10/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
03/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/06/2025
Permit issued — Foundation
S00667647-I1-FO
03/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/18/2025
Filed — Alteration
Installation of new fire sprinkler system with valves and meters for same.
S00345044-P1
02/05/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/04/2025
Permit issued — Plumbing
S40430188-I1-PL
01/13/2025
Filed — Alteration
APPLICATION FILED FOR PLUMBING AND GAS WORK ASSOCIATED TO NEW BUILDING #520453606.
S00317578-P2
01/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
01/13/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
01/13/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
01/13/2025
Special inspection requirement — HVAC and service water heating equipment
anthony santoro
01/13/2025
Special inspection requirement — Maintenance information
anthony santoro
01/13/2025
Special inspection requirement — HVAC and service water heating system controls
anthony santoro
01/13/2025
Special inspection requirement — HVAC insulation and sealing
anthony santoro
01/13/2025
Special inspection requirement — Electrical energy consumption
anthony santoro
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
01/10/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
01/10/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
01/10/2025
Special inspection requirement — Electrical energy consumption
anthony santoro
01/10/2025
Special inspection requirement — HVAC insulation and sealing
anthony santoro
01/10/2025
Special inspection requirement — HVAC and service water heating equipment
anthony santoro
01/10/2025
Special inspection requirement — Maintenance information
anthony santoro
01/10/2025
Special inspection requirement — HVAC and service water heating system controls
anthony santoro
01/02/2025
Signed off — Alteration
APPLICATION FILED FOR THE INSTALLATION OF 8'-0" HIGH TEMPORARY CONSTRUCTION FENCE. FILED IN CONJUNCTION WITH NEW BUILDING #520453606.
S00317490-I1
01/02/2025
Permit issued — Curb Cut
S00317514-I1-CC
12/20/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
12/18/2024
Filed — Alteration
APPLICATION FILED FOR PLUMBING AND GAS WORK ASSOCIATED TO NEW BUILDING #520453606.
S00317578-P1
03/28/2024
Permit issued — Construction Fence
S00317490-I1-FN
03/22/2024
Permit issued — Plumbing
S00345044-I1-PL
03/07/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/03/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/25/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/21/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/12/2023
Permit issued — Plumbing
S40430188-I1-PL
05/12/2023
Permit issued — Plumbing
S00317578-I1-PL
04/12/2023
Permit issued — Construction Fence
S00317490-I1-FN
01/31/2022
Filed — Alteration
S00667647-I1
10/01/2021
Filed — Alteration
Installation of new fire sprinkler system with valves and meters for same.
S00345044-I1
08/24/2021
Filed — Alteration
APPLICATION FILED FOR PLUMBING AND GAS WORK ASSOCIATED TO NEW BUILDING #520453606.
S00317578-I1
11/04/2020
Filed — Alteration
APPLICATION FILED FOR 10'-0" CURB CUT ALONG HEMPSTEAD AVENUE. FILED IN CONJUNCTION WITH NEW BUILDING #520453606.
S00317514-I1
11/04/2020
Filed — Alteration
APPLICATION FILED FOR THE INSTALLATION OF 8'-0" HIGH TEMPORARY CONSTRUCTION FENCE. FILED IN CONJUNCTION WITH NEW BUILDING #520453606.
S00317490-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offKDC OF STATEN ISLAND INC03/06/2025
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR02/04/2025
DOB NOWCurb CutSigned-offKDC OF STATEN ISLAND INC01/02/2025
DOB NOWConstruction FenceSigned-offKDC OF STATEN ISLAND INC03/28/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR03/22/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR07/12/2023
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC05/12/2023
DOB NOWConstruction FenceSigned-offKDC OF STATEN ISLAND INC04/12/2023
1 project · most recent 01/10/2025
General Wiring
FiledStatusContractorScope
01/10/2025CompleteB & R ELEC'L CONTR'G, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
03/21/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
03/10/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
03/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/20/2024Pass-Final PL - UndergroundPassView ↗
11/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/03/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/25/2023Pass-Final PL - UndergroundPassView ↗
07/21/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
01/13/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
01/13/2025Energy Code Compliance Inspectionsanthony santoroprogress
01/13/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
01/13/2025HVAC and service water heating equipment anthony santoroenergy_progress
01/13/2025Maintenance informationanthony santoroenergy_progress
01/13/2025HVAC and service water heating system controls anthony santoroenergy_progress
01/13/2025HVAC insulation and sealing anthony santoroenergy_progress
01/13/2025Electrical energy consumptionanthony santoroenergy_progress
01/10/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
01/10/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
01/10/2025Energy Code Compliance Inspectionsanthony santoroprogress
01/10/2025Electrical energy consumptionanthony santoroenergy_progress
01/10/2025HVAC insulation and sealing anthony santoroenergy_progress
01/10/2025HVAC and service water heating equipment anthony santoroenergy_progress
01/10/2025Maintenance informationanthony santoroenergy_progress
01/10/2025HVAC and service water heating system controls anthony santoroenergy_progress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch - Plumbing5
08/25/2026S00317578-P1Request digital key ↗
08/25/2026S00317578-I1Request digital key ↗
08/25/2026S00317578-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut1
08/25/2026S00317514-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/25/2026S00317490-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/24/2026S00667647-I1Request digital key ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026S00317490-I1Open ↗
08/25/2026S00317578-I1Open ↗
08/25/2026S00317578-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026S00317578-I1Open ↗
09/01/2026S00317578-I1Open ↗
08/22/2026S00317578-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S00317578-I1Open ↗
08/22/2026S00317578-P2Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00317578-I1Open ↗
▸Other Documents1
▸DOB NOWTR5H Test Report1
08/13/2026S00667647-I1Open ↗