RoofUnder Construction3p · 2 filings · 20 docs
GeneralMechanical
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. TEMPORARY PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this job
2 documents · 2 drawing sheets
SPRINKLER MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
27 documents · 1 drawing sheet
Floor 2610p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the (26th Floor- Tepper Foundation (TTF)) as per plans. No change to use, egress or occupancy.
On file for this job
2 documents · 4 drawing sheets
Modifications to the existing HVAC system on the (26th Floor- Tepper Foundation (TTF) as per plans. No change to use, egress or occupancy.
On file for this job
10 documents · 3 drawing sheets
Modifications to the existing sprinkler system on the (26th Floor- Tepper Foundation (TTF) as per plans. No change to use, egress or occupancy.
On file for this job
6 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 2511p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Filing herewith mechanical work in existing 25th floor space. No change in use, egress or occupancy.
On file for this job
7 documents · 4 drawing sheets
Filing herewith plumbing work to existing 25th floor space. No change in use, egress or occupancy.
On file for this job
4 documents · 1 drawing sheet
Filing herewith sprinkler work in existing 25th floor space. No change in use egress or occupancy.
On file for this job
6 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 2410p · 4 filings · 11 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbing
Filing herewith interior renovation, pre built suites, of existing 24th floor space. No change in use, egress, or occupancy.
On file for this job
4 documents · 6 drawing sheets
Filing herewith mechanical work in existing 24th floor space. No change in use, egress, or occupancy.
On file for this job
2 documents · 2 drawing sheets
Filing herewith plumbing work to existing on the 24th floor. No change in use, egress, or occupancy.
On file for this job
2 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 238p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Filing herewith mechanical work in existing 23rd floor space. No change in use, egress, or occupancy.
On file for this job
4 documents · 2 drawing sheets
Filing herewith interior renovation, pre built suites, of existing 23rd floor space. No change in use, egress, or occupancy.
On file for this job
8 documents · 3 drawing sheets
Filing herewith plumbing work to existing on the 24th floor. No change in use, egress, or occupancy.
On file for this job
2 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 229p · 4 filings · 14 docs
ArchitectureFire ProtectionMechanicalPlumbing
Filing herewith plumbing work to existing on the 22nd floor. No change in use, egress, or occupancy.
On file for this job
2 documents · 1 drawing sheet
Filing herewith mirror work on the existing sprinkler system on the 22nd floor. No change in use egress or occupancy.
On file for this job
6 documents · 1 drawing sheet
Filing herewith interior renovation of existing 22nd floor space. No change in use, egress, or occupancy.
On file for this job
2 documents · 5 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 2110p · 3 filings · 9 docs
ArchitectureGeneralMechanicalPlumbing
Filing herewith plumbing work on the 21st FL. as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
4 documents · 1 drawing sheet
Filing herewith interior renovation to the 21st Fl. as per plans filed herewith. No change to use,egress or occupancy.
On file for this job
2 documents · 7 drawing sheets
Filing herewith mechanical work on the 21st FL. as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
3 documents · 2 drawing sheets
Floor 202p · 1 filing · 17 docs
Fire ProtectionPlumbing
Modification to existing Plumbing fixtures as per plans filed herewith. Modification to existing Sprinkler system as per plans filed herewith. Please note that the address on this project is 107 Greenwich Street. The building is new and there is no BIN.
On file for this job
17 documents · 2 drawing sheets
Floor 199p · 3 filings · 14 docs
ArchitectureFire ProtectionGeneralPlumbing
Filing herewith modification of the existing sprinkler system on the 19th FL. as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
6 documents · 2 drawing sheets
Filing herewith Plumbing work for the 19th FL. as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
4 documents · 1 drawing sheet
Filing herewith interior renovation of the 19th FL. as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
4 documents · 6 drawing sheets
Floor 189p · 4 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Modification to mechanical systems as per plans filed herewith. No change in use, occupancy or egress.
On file for this job
17 documents · 2 drawing sheets
Interior renovation as per plans filed herewith. No change in use, occupancy or egress.
On file for this job
3 documents · 3 drawing sheets
Modification to sprinkler and plumbing systems as per plans filed herewith. No change in use, occupancy or egress.
On file for this job
6 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 1711p · 6 filings · 20 docs
ArchitectureCivilDMElectricalFire ProtectionGeneralMechanicalPlumbing
Filing herewith interior renovation of existing 17th floor space. No change in use, egress, or occupancy.
On file for this job
4 documents · 5 drawing sheets
Filing herewith mechanical work in existing 17th floor space. No change in use, egress, or occupancy.
On file for this job
20 documents · 4 drawing sheets
Filing herewith sprinkler work on the existing sprinkler system on the 17th floor. No change in use egress or occupancy.
On file for this job
4 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 162p · 1 filing · 17 docs
Fire ProtectionPlumbing
Modification to existing Plumbing fixtures as per plans filed herewith. Modification to existing Sprinkler system as per plans filed herewith. Please note that the address on this project is 107 Greenwich Street. The building is new and there is no BIN.
On file for this job
17 documents · 2 drawing sheets
Floor 15Under Construction23p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Filing herewith interior renovation of existing 15th floor space as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
2 documents · 6 drawing sheets
Filing herewith mechanical work in existing 15th floor space as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
5 documents · 2 drawing sheets
Filing herewith modification to the existing sprinkler system on the 15th FL. floor as per plans filed herewith. No change in use egress or occupancy.
On file for this job
1 document · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 144p · 1 filing · 20 docs
Fire ProtectionMechanical
SPRINKLER MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
27 documents · 4 drawing sheets
Floor 134p · 1 filing · 20 docs
Fire ProtectionMechanical
SPRINKLER MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
27 documents · 4 drawing sheets
Floor 124p · 2 filings · 13 docs
Fire ProtectionMechanicalPlumbing
PLUMBING AND SPRINKLER WORK FOR INTERIOR FIT-OUT OF THE 12TH FLOOR OFFICE SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY..
On file for this job
3 documents · 2 drawing sheets
INSTALLATION OF AC UNIT ON THE 9TH FLOOR AND INSTALLATION OF MECHANICAL EQUIPMENT ON THE 12TH FLOOR OFFICE SPACE INCLUDING DUCTWORK AND PIPING.
On file for this job
10 documents · 2 drawing sheets
Floor 11
Floor 10
Floor 91p · 1 filing · 10 docs
General
Filing herewith mechanical work on the 9th FL. as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
10 documents · 1 drawing sheet
Floor 8
Floor 74p · 3 filings · 20 docs
ArchitectureMechanical
Provide slab penetrations at the 7th Floor southeast terrace to facilitate HVAC piping and electrical connections to the HVAC unit as per plans filed herewith. No change to use, egress and occupancy.
On file for this job
3 documents · 1 drawing sheet
Filing herewith mechanical work in existing 17th floor space. No change in use, egress, or occupancy.
On file for this job
20 documents · 2 drawing sheets
INTERIOR RENOVATION AT THE 4TH FLOOR EXISTING LOCKER ROOMS, AT THE EXISTINGT 6TTH FLOOR SECURITY SUITE AND PROVIDE ADDITIONAL WORKSTATIONS AT EXISTING OFFICE SPACE ON THE 7TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents · 1 drawing sheet
Floor 69p · 3 filings · 7 docs
ArchitectureDMMechanicalPlumbing
Filing herewith mechanical work as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
2 documents · 2 drawing sheets
INTERIOR RENOVATION AT THE 4TH FLOOR EXISTING LOCKER ROOMS, AT THE EXISTINGT 6TTH FLOOR SECURITY SUITE AND PROVIDE ADDITIONAL WORKSTATIONS AT EXISTING OFFICE SPACE ON THE 7TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents · 6 drawing sheets
MECHANICAL DUCTWORK FOR INTERIOR RENOVATION OF THE 4TH FLOOR LOCKER ROOMS AND 6TH FLOOR SECURITY SUITE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this job
2 documents · 1 drawing sheet
Floor 5
Floor 418p · 6 filings · 17 docs
ArchitectureDMGeneralMechanicalPlumbing
Issued Permit Scope
Plumbing
Plumbing work for interior renovation at the 4th floor locker room. No change to use, egress or occupancy.
On file for this job
4 documents
INTERIOR RENOVATION AT THE 4TH FLOOR EXISTING LOCKER ROOMS, AT THE EXISTINGT 6TTH FLOOR SECURITY SUITE AND PROVIDE ADDITIONAL WORKSTATIONS AT EXISTING OFFICE SPACE ON THE 7TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents · 8 drawing sheets
MECHANICAL DUCTWORK FOR INTERIOR RENOVATION OF THE 4TH FLOOR LOCKER ROOMS AND 6TH FLOOR SECURITY SUITE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this job
2 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 38p · 2 filings · 7 docs
ArchitecturePlumbing
Issued Permit Scope
Plumbing
Plumbing work for interior renovation at the 4th floor locker room. No change to use, egress or occupancy.
On file for this job
4 documents · 1 drawing sheet
INTERIOR RENOVATION AT THE 4TH FLOOR EXISTING LOCKER ROOMS, AT THE EXISTINGT 6TTH FLOOR SECURITY SUITE AND PROVIDE ADDITIONAL WORKSTATIONS AT EXISTING OFFICE SPACE ON THE 7TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents · 1 drawing sheet
Floor 21p · 1 filing · 2 docs
General
No filed description on record for this job.
On file for this job
2 documents · 1 drawing sheet
Floor 1
Basement1p · 1 filing · 3 docs
General
No filed description on record for this job.
On file for this job
3 documents · 1 drawing sheet