← Back
Two family brick
76 UNION STREET
BROOKLYN · BIN 3004376
💬 Discuss this project
1899Year Built
3Stories
B1Building Class
M1-1Zoning
1,760 sfGross Floor Area
2Units
Two family brick · 2,200 sf lot · 0.8 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STEEL CONSTRUCTION608/25/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROHAN ENGINEERING, PC108/04/2026
JON PAUL DESIGN & CONSULTING105/28/2026
MJE PROFESSIONAL SERVICES108/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEEL CONSTRUCTION LLCGeneral Contractor208/25/2026
RICHARD NEUElectrical103/22/2026
DINEEN CONSTRUCTION CORPGeneral Contractor109/30/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONSULTING ENGINEER5093108/04/2026
Building Lifecycle
All (18)Filed (3)Permit Issued (3)Objection (6)Special Inspection (6)
09/29/2026
Permit issued — General Construction
B01359347-I1-GC
08/24/2026
Permit issued — Sidewalk Shed
B01276850-I1-SH
08/04/2026
Filed — Alteration
GC WORK TYPE TO ERECT NEW STEEL DECK AT THE REAR OF THE EXISTING 2-FAMILY RESIDENCE. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
B01438970-I1
07/30/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
John Natoli
07/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Natoli
07/30/2026
Special inspection requirement — Structural Steel - Details
John Natoli
07/30/2026
Special inspection requirement — Structural Cold-Formed Steel
John Natoli
07/30/2026
Special inspection requirement — Energy Code Compliance Inspections
John Natoli
07/30/2026
Special inspection requirement — Final
John Natoli
06/22/2026
Objection raised — Fire_Protection
06/22/2026
Objection resolved — Addressed
06/22/2026
Objection raised — Fire_Protection
06/22/2026
Objection resolved — Addressed
06/22/2026
Objection resolved — Addressed
06/09/2026
Objection raised — Scope
05/28/2026
Filed — Alteration
GC WORK TYPE TO REMOVE FIRE ESCAPES FROM FRONT & REAR OF EX. 2-FAMILY DWELLING. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
B01359347-I1
08/25/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01276850-I1
08/25/2025
Permit issued — Sidewalk Shed
B01276850-I1-SH
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDINEEN CONSTRUCTION CORP09/29/2026
DOB NOWSidewalk ShedPermit IssuedSTEEL CONSTRUCTION LLC08/24/2026
DOB NOWSidewalk ShedPermit IssuedSTEEL CONSTRUCTION LLC08/25/2025
1 project · most recent 08/26/2025
FiledStatusContractorScope
08/26/2025Permit IssuedRICHARD NEU—
1 project · most recent 08/04/2026
Steel Concrete
FiledStatusContractorScope
08/04/2026——Steel, Concrete
1 project · most recent 08/25/2025
Sidewalk Shed
FiledStatusContractorScope
08/25/2025Permit IssuedSTEEL CONSTRUCTION LLCSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
07/30/2026Subsurface Investigations (Borings/Test Pits)John Natolispecial
07/30/2026Structural Stability – Alterations of existing buildingsJohn Natolispecial
07/30/2026Structural Steel - DetailsJohn Natolispecial
07/30/2026Structural Cold-Formed SteelJohn Natolispecial
07/30/2026Energy Code Compliance InspectionsJohn Natoliprogress
07/30/2026FinalJohn Natoliprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026B01276850-I1Request digital key ↗
08/16/2026B01438970-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026B01438970-I1Open ↗
08/13/2026B01276850-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/16/2026B01438970-I1Open ↗
▸DOB NOWSOIL REPORT1
08/16/2026B01438970-I1Open ↗