← Back
One family attached or semi-detached
760 TRINITY AVENUE
BRONX · Melrose · BIN 2096049
💬 Discuss this project
1991Year Built
2Stories
A5Building Class
R6Zoning
1,152 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
One family attached or semi-detached · 1,768 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC108/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/13/2024
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
08/18/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01094201-I1
08/21/2024
Permit issued — Solar
X01094201-I1-SL
08/13/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01094201-I1
08/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/09/2024
Special inspection requirement — Final
Walid Abdulla
08/09/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
05/15/1992
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC08/21/2024
BIS—ISSUEDM.R.L.S. CONSTRUCTION CORP. ET.11/08/1991
1 project · most recent 08/13/2024
FiledStatusContractorScope
08/13/2024CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/09/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/09/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/09/2024Energy Code Compliance InspectionsWalid Abdullaprogress
08/09/2024FinalWalid Abdullaprogress
08/09/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026X01094201-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026X01094201-I1Open ↗
08/24/2026X01094201-I1Open ↗
08/24/2026X01094201-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026X01094201-I1Open ↗
08/24/2026X01094201-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026X01094201-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01094201-I1Open ↗