← Back
BuildNYC
Primarily 2 family with 1 store or office
7603 5TH AVENUE
BROOKLYN · Bay Ridge · BIN 3149301
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R6BZoning
3,300 sfGross Floor Area
3Units
Rent Stabilized0 Active Violations 3 likely answered ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 7603 Wu · 1,869 sf lot · 1.77 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofTriple Power II LLC3p · 1 filing · 9 docs
Floor 3Mixed-use house renovation, plumbing, boiler, and cooking eq4p · 2 filings · 12 docs
Floor 2Mixed-use house renovation, plumbing, boiler, and cooking eq4p · 2 filings · 12 docs
Floor 1Exit 14 Convenient11p · 4 filings · 20 docs
CellarBoiler application to install new boiler6p · 3 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Triple Power II903/22/2026
Exit 14 Convenient503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/23/2022$1.6M—Private party → 7603 WU INC.$473/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Skypeak108/27/2025
Ayala Engineering207/03/2024
JX Flame Solution208/01/2023
J&R Design and Inspection304/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
High Quality 338603/21/2026
Viben Building403/21/2026
Insha Building Consultants203/21/2026
SUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
American Standard P&H CororpPlumbing407/08/2026
BG Construction NYGeneral Contractor303/21/2026
Greener CountyGeneral Contractor303/21/2026
Timing Construction Team*General Contractor303/21/2026
High Quality ConstructionGeneral Contractor107/08/2026
Superior Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ayala Engineering9207207/03/2024
NKM Engineering6244304/26/2023
Building Lifecycle
All (75)Filed (8)Permit Issued (9)Signed Off (4)Violation (14)Inspection (10)Special Inspection (30)
10/29/2025
Violation issued (ECB, closed)
Construction
10/29/2025
Violation issued (ECB, closed)
Construction
09/19/2025
Violation issued (FDNY_ORDER, closed)
09/02/2025
Permit issued — General Construction
B01276549-I1-GC
08/27/2025
Filed — Alteration
FILING FOR MINOR INTERIOR GC WORK TO REMOVE INTERIOR PARTITIONS, REPLACE FL TILES AS NEEDED, AND INTERIOR FINISHES THROUGHOUT ONLY. RELATED PL WORK TO BE DONE UNDER JOB# B01072523-S1.
B01276549-I1
06/05/2025
Violation issued (ECB, closed)
Unknown
05/05/2025
Violation issued (FDNY_ORDER, closed)
05/05/2025
Violation issued (FDNY_ORDER, closed)
11/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/23/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/19/2024
Signed off — Alteration
FILE BOILER APPLICATION TO INSTALL NEW BOILER AND H.W.H AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00863656-I1
08/19/2024
Signed off — Alteration
GENERAL RENOVATION ON EXIST. MIXED-USE HOUSE WITH, REPLACE PLUMBING FIXTURES AND GAS COOKING EQUIPMENT AND BOILER, AND H.W.H. AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00860043-I1
08/19/2024
Signed off — Alteration
GENERAL RENOVATION ON EXIST. MIXED-USE HOUSE WITH, REMOVING/REPLACE/NEW PARTITION, FLOOR, CEILING AND PAINTING, AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00856505-I1
08/14/2024
Permit issued — Plumbing
B01072523-S1-PL
08/02/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/02/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/02/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/24/2024
Permit issued — Boiler Equipment
B00863656-I1-BE
07/15/2024
Permit issued — Mechanical Systems
B01072523-I1-GC-CX
07/03/2024
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT AND INSTALL KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01072523-I1
07/03/2024
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT AND INSTALL KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01072523-S1
07/01/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/01/2024
Special inspection requirement — Fenestration areas
Pablo Ayala
07/01/2024
Special inspection requirement — Fire-Resistance Rated Construction
Pablo Ayala
07/01/2024
Special inspection requirement — Air barrier - visual inspection
Pablo Ayala
07/01/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Pablo Ayala
07/01/2024
Special inspection requirement — Fenestration air leakage
Pablo Ayala
06/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
06/26/2024
Special inspection requirement — Tenant Protection Plan Compliance
Pablo Ayala
06/26/2024
Special inspection requirement — Mechanical Systems
Pablo Ayala
06/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Pablo Ayala
06/26/2024
Special inspection requirement — Final
Pablo Ayala
06/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
Pablo Ayala
06/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Pablo Ayala
06/26/2024
Special inspection requirement — Interior lighting power
Pablo Ayala
06/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
Pablo Ayala
06/25/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
05/20/2024
Permit issued — Plumbing
B00860043-I1-PL
05/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/19/2023
Signed off — Alteration
REPAIR AND REPAINT EXISTING STAIR HALLWAY AT 2ND AND 3RD FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00820262-I1
10/16/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/01/2023
Filed — Alteration
REPAIR AND REPAINT EXISTING STAIR HALLWAY AT 2ND AND 3RD FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00820262-P1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/05/2023
Permit issued — Boiler Equipment
B00863656-I1-BE
05/03/2023
Permit issued — Plumbing
B00860043-I1-PL
04/28/2023
Permit issued — General Construction
B00856505-I1-GC
04/26/2023
Filed — Alteration
FILE BOILER APPLICATION TO INSTALL NEW BOILER AND H.W.H AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00863656-I1
04/26/2023
Filed — Alteration
GENERAL RENOVATION ON EXIST. MIXED-USE HOUSE WITH, REPLACE PLUMBING FIXTURES AND GAS COOKING EQUIPMENT AND BOILER, AND H.W.H. AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00860043-I1
04/26/2023
Filed — Alteration
GENERAL RENOVATION ON EXIST. MIXED-USE HOUSE WITH, REMOVING/REPLACE/NEW PARTITION, FLOOR, CEILING AND PAINTING, AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00856505-I1
04/26/2023
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
04/21/2023
Special inspection requirement — Heating Systems
NARESH MAHANGU
04/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
04/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
NARESH MAHANGU
04/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
NARESH MAHANGU
04/21/2023
Special inspection requirement — Maintenance information
NARESH MAHANGU
04/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
NARESH MAHANGU
04/14/2023
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGreener County Construction09/02/2025
DOB NOWPlumbingPermit IssuedSuperior Plumbing & Heating08/14/2024
DOB NOWBoiler EquipmentSigned-offAmerican Standard P&H Cororp07/24/2024
DOB NOWMechanical SystemsPermit IssuedBG Construction NY07/15/2024
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp05/20/2024
DOB NOWBoiler EquipmentSigned-offAmerican Standard P&H Cororp05/05/2023
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp05/03/2023
DOB NOWGeneral ConstructionSigned-offHigh Quality Construction04/28/2023
DOB NOWGeneral ConstructionSigned-offTiming Construction Team*02/01/2023
BISMHISSUEDHerco Machinery09/26/1991
BISFSISSUEDHerco Machinery09/26/1991
1 project · most recent 07/03/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/03/2024Permit IssuedBG Construction NYVentilation Systems
Ventilation
Dayton 56JN93 4,800 CFM · Exhaust Fan ×1
1 project · most recent 05/01/2023
General Wiring
FiledStatusContractorScope
05/01/2023Permit IssuedKJK ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
11/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/23/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/02/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/02/2024Pass-Final Boiler Equipment InspectionPassView ↗
07/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/25/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
05/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/16/2023Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
07/01/2024Fenestration areasPablo Ayalaenergy_progress
07/01/2024Fire-Resistance Rated ConstructionPablo Ayalaprogress
07/01/2024Air barrier - visual inspectionPablo Ayalaenergy_progress
07/01/2024Fenestration and door U-factor and product ratingsPablo Ayalaenergy_progress
07/01/2024Fenestration air leakagePablo Ayalaenergy_progress
06/26/2024Fire-Resistant Penetrations and JointsPablo Ayalaspecial
06/26/2024Tenant Protection Plan CompliancePablo Ayalaspecial
06/26/2024Mechanical SystemsPablo Ayalaspecial
06/26/2024Energy Code Compliance InspectionsPablo Ayalaprogress
06/26/2024FinalPablo Ayalaprogress
06/26/2024HVAC-R and service water heating equipmentPablo Ayalaenergy_progress
06/26/2024HVAC-R and service water piping design and insulationPablo Ayalaenergy_progress
06/26/2024Interior lighting powerPablo Ayalaenergy_progress
06/26/2024HVAC-R and service water heating system controlsPablo Ayalaenergy_progress
04/26/2023Tenant Protection Plan ComplianceNARESH MAHANGUspecial
04/21/2023Heating SystemsNARESH MAHANGUspecial
04/21/2023Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
04/21/2023HVAC-R and service water heating equipmentNARESH MAHANGUenergy_progress
04/21/2023HVAC-R and service water heating system controlsNARESH MAHANGUenergy_progress
04/21/2023Maintenance informationNARESH MAHANGUenergy_progress
04/14/2023HVAC-R and service water heating equipmentNARESH MAHANGUenergy_progress
04/14/2023Energy Code Compliance InspectionsNARESH MAHANGUprogress
04/14/2023Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
04/14/2023Fire-Resistance Rated ConstructionNARESH MAHANGUprogress
04/14/2023Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
Latest 25 of 30.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Exit 14 ConvenientRetailFloor 1
Project B01276549 Alteration · Permit Entire · 08/27/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026B00820262-I1Request digital key ↗
08/27/2026B00820262-P1Request digital key ↗
08/27/2026B00856505-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026B00860043-I1Open ↗
08/27/2026B00863656-I1Open ↗
08/24/2026B01072523-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026B00863656-I1Open ↗
09/01/2026B00860043-I1Open ↗
09/01/2026B00860043-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B00863656-I1Open ↗
09/01/2026B00860043-I1Open ↗
08/28/2026B01072523-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026B00860043-I1Open ↗
08/27/2026B00863656-I1Open ↗
08/24/2026B01072523-S1Open ↗
Showing 3 of 6 on file for this type