← Back
Single or multiple dwelling with stores or offices
7613 3 AVENUE
BROOKLYN · Bay Ridge · BIN 3149185
💬 Discuss this project
1929Year Built
3Stories
S9Building Class
R6BZoning
4,260 sfGross Floor Area
6Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: POROIA REALTY, LLC · 2,800 sf lot · 1.52 FAR built · Flood zone X
Locations of Work
Architecture
Floor 11p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
POROIA REALTY, LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.207/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J BUILDING CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781207/13/2021
Building Lifecycle
All (38)Filed (2)Permit Issued (1)Signed Off (1)Violation (23)Inspection (2)Special Inspection (9)
04/30/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/03/2024
Violation issued (HPD, closed)
A
11/17/2023
Violation issued (HPD, closed)
I
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/17/2023
Violation issued (HPD, closed)
A
11/07/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
A
07/19/2021
Signed off — Alteration
B00530800-I1
07/15/2021
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/13/2021
Filed — Alteration
B00530800-P1
07/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
07/09/2021
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
07/09/2021
Special inspection requirement — Final
CHRISTIAN LOZADA
07/09/2021
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
07/09/2021
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
07/09/2021
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
07/09/2021
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
07/09/2021
Special inspection requirement — Lighting controls
CHRISTIAN LOZADA
07/09/2021
Special inspection requirement — Lighting in dwelling units
CHRISTIAN LOZADA
07/08/2021
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/07/2021
Permit issued — General Construction
B00530800-I1-GC
06/03/2021
Filed — Alteration
B00530800-I1
04/05/2021
Violation issued (HPD, closed)
I
04/05/2021
Violation issued (HPD, closed)
A
10/28/2019
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/22/1986
Violation issued (HPD, open)
B
10/30/1985
Violation issued (HPD, open)
B
01/20/1982
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC06/07/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/15/2021Pass-Final General Construction Non-Directive 14PassView ↗
07/08/2021Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
07/09/2021Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
07/09/2021Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
07/09/2021FinalCHRISTIAN LOZADAprogress
07/09/2021Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
07/09/2021Interior lighting powerCHRISTIAN LOZADAenergy_progress
07/09/2021Permanent certificateCHRISTIAN LOZADAenergy_progress
07/09/2021Maintenance informationCHRISTIAN LOZADAenergy_progress
07/09/2021Lighting controlsCHRISTIAN LOZADAenergy_progress
07/09/2021Lighting in dwelling unitsCHRISTIAN LOZADAenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/01/2026B00530800-I1Request digital key ↗
09/01/2026B00530800-P1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/01/2026B00530800-P1Open ↗
09/01/2026B00530800-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026B00530800-P1Open ↗
08/26/2026B00530800-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026B00530800-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00530800-P1Open ↗
09/01/2026B00530800-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00530800-I1Open ↗