| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 04/29/2026 | Permit Issued | MECHANICAL EAST CO.,INC | Air Conditioning Systems | |
| 11/10/2023 | Permit Issued | AL SAEED CONSTRUCTION | Associated Ducts and Piping, Refrigeration Systems, Ventilation Systems | Ventilation Greenheck BSQ-240 4,000 CFM · Kitchen Exhaust ×2 Air Quality Engineering AUTOCLEAN 8000 400 CFM · Kitchen Exhaust ×1 Refrigeration Copeland FFWP-050Z-CFV-020 65,100 BTU · Refrigeration Unit ×3 Ducts & Piping Greenheck ×1 |
| 10/23/2023 | — | — | Heating and Air Conditioning Systems | Heat / Cool Climatemaster TCH096 93,700 BTU · Wshp ×1 |
| 02/02/2022 | Signed-off | MICHELLE KUO CORP | Air Conditioning Systems | — |
| 08/31/2021 | — | — | Air Conditioning Systems | Cooling |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/02/2026 | Permit Issued | JEM FIRE PREVENTION INC | 194 heads |
| 08/31/2021 | — | — | 13 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/06/2026 | Permit Issued | W.R. PLBG AND HTG CORP | Water/Sanitary |
| 11/10/2023 | Permit Issued | EMPIRE PLUMBING INC | Water/Sanitary |
| 10/23/2023 | Signed-off | EMPIRE PLUMBING INC | Gas |
| 11/08/2022 | — | — | Gas, Water/Sanitary |
| 08/31/2021 | — | — | Water/Sanitary |
| 11/20/2019 | Signed-off | I.M.P. PLBG. & HTG. CORP | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/17/2026 | Permit Issued | ATMOS ELECTRIC SVCE CORP | — |
| 09/17/2026 | Permit Issued | ATMOS ELECTRIC SVCE CORP | — |
| 08/24/2026 | Complete | KINGS ELECTRIC CO., INC. | — |
| 05/26/2026 | Permit Issued | ALL AROUND ELECTRIC CORP. | General Wiring |
| 10/27/2025 | Permit Issued | ACCURATE ELEC'L CORP. | General Wiring |
| 09/05/2025 | Permit Issued | CENTENNIAL ELEVATOR INDUS | General Wiring |
| 08/13/2025 | Complete | ASSET ELECTRIC CORP | General Wiring |
| 08/11/2025 | Permit Issued | CENTENNIAL ELEVATOR INDUS | General Wiring |
| 04/28/2025 | Permit Issued | ASCUATECH ELECTRICAL CORP | — |
| 02/02/2024 | Complete | ATMOS ELECTRIC SVCE CORP | — |
| 12/14/2023 | Complete | JONG HYUN KIM | — |
| 09/26/2023 | Permit Issued | JOE ELECTRICAL INC | General Wiring |
| 08/02/2023 | Permit Issued | JTE ELECTRICAL SERVICES | General Wiring |
| 07/26/2023 | Complete | POWERONE ELECT'L CONTRG | General Wiring |
| 05/08/2023 | Complete | PROSTO ELECTRIC CORP | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/24/2026 | Permit Issued | EXPEDITE GENERAL CONTRACT | 1 scope_items |
| 04/06/2026 | Permit Issued | BUILT NYG INC | 1 scope_items |
| 11/22/2019 | Permit Issued | BALATON CONSTRUCTION OF N | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/30/2020 | Permit Issued | CANIDO BASONAS CONSTRUCTI | Scaffold |
| Owner | Filings | Most Recent |
|---|---|---|
| AKAM ASSOCIATES | 13 | 08/29/2026 |
| CANIDO BASONAS CONSTRUCTION | 22 | 07/08/2026 |
| DC ASSOCIATES | 22 | 07/08/2026 |
| EXECUTIVE PLAZA CONDOMINIUM | 27 | 03/22/2026 |
| CANIDO BASONAS CONST SVC | 3 | 03/22/2026 |
| TAFT PARTNERS DEVELOPMENT | 2 | 03/22/2026 |
| 761-779 SEVENTH AVE CONDOMINUM | 13 | 03/22/2026 |
| PAUL DUGGAL LLC | 2 | 03/22/2026 |
| TAFT PARTNERS DVLPMTGRP | 1 | 03/22/2026 |
| RUTH CHIRS RESTURANT CORP | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| HOWARD L ZIMMERMAN ARCH & ENG DPC | 2 | 07/24/2026 |
| SOURCE ENGINEERING PC | 1 | 04/29/2026 |
| ROBERT L. QUEATHEM | 2 | 04/06/2026 |
| FREDERICK J GOGLIA | 1 | 04/06/2026 |
| TAN ENGINEERING PC | 1 | 04/02/2026 |
| Z & T ENGINEERING, P.C. | 1 | 02/24/2025 |
| PROSPECT ENGINEERING P.C | 1 | 02/01/2024 |
| FEINGOLD AND GREGORY ARCH. | 1 | 01/27/2024 |
| ALLEN SHINFELD, P.E. PLLC | 1 | 01/16/2024 |
| SOTIR ASSOCIATES | 3 | 11/10/2023 |
| MOTTOLA RINI ENGINEERS | 4 | 10/23/2023 |
| BROMLEY CALDARI ARCHITECTS | 4 | 04/13/2023 |
| ALAN R SCHWARTZ PE CONS ENG | 2 | 11/08/2022 |
| LEVERATTO ARCHITECTURE GROUP | 2 | 03/28/2022 |
| RICHARD WAINER ARCHITECT, PLLC | 1 | 03/12/2022 |
| ZELTA DESIGN | 2 | 02/02/2022 |
| ASHRAF CORP | 2 | 04/07/2021 |
| ASIF JAMIL, RA | 2 | 01/30/2020 |
| ANDREW L. PETTIT, ARCHITECT | 1 | 12/04/2019 |
| BRIAN ILL DEVELOPMENT LLC | 2 | 11/22/2019 |
| LEON SKVIRSKY PE | 1 | 10/02/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| TANG STUDIO LLC | 6 | 03/21/2026 |
| CONCEPT DESIGN GROUP | 1 | 03/21/2026 |
| HLZAE | 1 | 03/21/2026 |
| KNA CONSULTING | 10 | 03/21/2026 |
| BMB BUILDING CONSULTING | 2 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 2 | 03/21/2026 |
| NOREN INTERNATIONAL | 2 | 03/21/2026 |
| YOUN DESIGN CORP | 2 | 03/21/2026 |
| RIGGINING CONSULTANTS | 1 | 03/21/2026 |
| SEAY-YARBROUGH | 6 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| CANIDO BASONAS CONSTRUCTI | General Contractor | 11 | 07/08/2026 |
| PHOENIX SUTTON STR INC | General Contractor | 4 | 03/21/2026 |
| AL SAEED CONSTRUCTION | General Contractor | 4 | 07/08/2026 |
| MICHELLE KUO CORP | General Contractor | 3 | 07/08/2026 |
| BALATON CONSTRUCTION OF N | General Contractor | 3 | 07/08/2026 |
| WHARTON SMITH CONSTRUCTI* | General Contractor | 3 | 03/21/2026 |
| ALL VISION GENERAL CONST* | General Contractor | 3 | 03/21/2026 |
| KELTIC CONSTRUCTION & WOO | General Contractor | 3 | 03/21/2026 |
| SPARTAN DEMOLITION CO LLC | General Contractor | 3 | 03/21/2026 |
| UNITECH DESIGN | Scaffold | 2 | 09/03/2026 |
| BUILT NYG INC | General Contractor | 2 | 07/08/2026 |
| MCC CONTRACTING INC | General Contractor | 2 | 03/21/2026 |
| EMPIRE PLUMBING INC | Plumbing | 2 | 07/08/2026 |
| EXPEDITE GENERAL CONTRACT | General Contractor | 1 | 08/01/2026 |
| JEM FIRE PREVENTION INC | Fire Protection | 1 | 07/08/2026 |
| CSI ELEC'L & MECHANICAL I | Electrical | 1 | 03/22/2026 |
| TIER 1 MAINTENANCE LLC | General Contractor | 1 | 07/08/2026 |
| BENJAMIN DREBIN | Electrical | 1 | 03/21/2026 |
| ATMOS ELECTRIC SVCE CORP | Electrical | 1 | 03/22/2026 |
| I.M.P. PLBG. & HTG. CORP | Plumbing | 1 | 07/08/2026 |
| TRI STATE PLBG & HTG INC | Plumbing | 1 | 07/08/2026 |
| W.R. PLBG AND HTG CORP | Plumbing | 1 | 07/08/2026 |
| NEPTUNE SIGNS AWNINGS | Scaffold | 1 | 07/08/2026 |
| PAUL SIGNS | Scaffold | 1 | 07/08/2026 |
| TEE BEE SIGN INST | Scaffold | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| LEVIN ENGINEERING PLLC | 1267 | 1 | 04/29/2026 |
| THINK DESIGN ARCHITECTURA | 683 | 3 | 04/06/2026 |
| TAN ENGINEERING, P.C. | 1291 | 1 | 04/02/2026 |
| HOWARD L ZIMMERMAN ARCHIT | 1712 | 1 | 09/02/2025 |
| Z & T ENGINEERING, P.C. | 591 | 1 | 02/24/2025 |
| FEINGOLD & GREGORY ARCHIT | 979 | 1 | 01/27/2024 |
| CHERICO KING ARCHITECT PC | 5674 | 1 | 01/27/2024 |
| ENGINEERING CONSULTING SE | 2050 | 3 | 11/10/2023 |
| MOTTOLA RINI ENGINEERS, P | 3251 | 3 | 10/23/2023 |
| BFS ARCHITECT PC | 7477 | 2 | 10/23/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sign | Permit Issued | UNITECH DESIGN INC | 09/02/2026 |
| DOB NOW | Structural | Permit Issued | EXPEDITE GENERAL CONTRACT | 07/31/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | MECHANICAL EAST CO.,INC | 07/14/2026 |
| DOB NOW | Sprinklers | Permit Issued | JEM FIRE PREVENTION INC | 04/30/2026 |
| DOB NOW | General Construction | Permit Issued | BUILT NYG INC | 04/22/2026 |
| DOB NOW | Plumbing | Permit Issued | W.R. PLBG AND HTG CORP | 04/22/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | BUILT NYG INC | 04/22/2026 |
| DOB NOW | Structural | Signed-off | WHARTON SMITH CONSTRUCTI* | 02/27/2025 |
| DOB NOW | General Construction | Permit Issued | KELTIC CONSTRUCTION & WOO | 04/03/2024 |
| DOB NOW | Plumbing | Signed-off | EMPIRE PLUMBING INC | 03/14/2024 |
| DOB NOW | Sign | Signed-off | NEPTUNE SIGNS&AWNINGS INC | 03/13/2024 |
| DOB NOW | Sign | Signed-off | UNITECH DESIGN INC | 02/02/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | STRUCTUAL PRESV SYSTEM | 12/22/2023 |
| DOB NOW | Plumbing | Permit Issued | EMPIRE PLUMBING INC | 11/29/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | AL SAEED CONSTRUCTION | 10/25/2023 |
| DOB NOW | General Construction | Permit Issued | AL SAEED CONSTRUCTION | 09/12/2023 |
| DOB NOW | General Construction | Permit Issued | MCC CONTRACTING INC | 04/19/2023 |
| DOB NOW | General Construction | Signed-off | 18-15 REALTY LLC | 04/06/2022 |
| DOB NOW | Plumbing | Signed-off | DW PLUMBING INC | 03/31/2022 |
| DOB NOW | Sign | Permit Issued | WEINFELD, ELLIOT | 03/16/2022 |
| DOB NOW | General Construction | Signed-off | TIER 1 MAINTENANCE LLC | 03/14/2022 |
| DOB NOW | General Construction | Signed-off | 18-15 REALTY LLC | 02/09/2022 |
| DOB NOW | General Construction | Permit Issued | ALL VISION GENERAL CONST* | 01/13/2022 |
| DOB NOW | General Construction | Signed-off | SPARTAN DEMOLITION CO LLC | 01/07/2022 |
| DOB NOW | Supported Scaffold | Permit Issued | CANIDO BASONAS CONSTRUCTI | 11/01/2021 |
| DOB NOW | Supported Scaffold | Permit Issued | CANIDO BASONAS CONSTRUCTI | 03/23/2021 |
| DOB NOW | Sidewalk Shed | Signed-off | PHOENIX SUTTON STR INC | 01/20/2021 |
| DOB NOW | Supported Scaffold | Permit Issued | CANIDO BASONAS CONSTRUCTI | 12/09/2020 |
| DOB NOW | Structural | Permit Issued | BALATON CONSTRUCTION OF N | 07/02/2020 |
| DOB NOW | Supported Scaffold | Permit Issued | CANIDO BASONAS CONSTRUCTI | 02/28/2020 |
| DOB NOW | Structural | Permit Issued | BALATON CONSTRUCTION OF N | 02/05/2020 |
| DOB NOW | Construction Fence | Permit Issued | BALATON CONSTRUCTION OF N | 02/05/2020 |
| DOB NOW | Sidewalk Shed | Signed-off | PHOENIX SUTTON STR INC | 01/23/2020 |
| DOB NOW | Plumbing | Signed-off | I.M.P. PLBG. & HTG. CORP | 12/31/2019 |
| DOB NOW | Supported Scaffold | Permit Issued | CANIDO BASONAS CONSTRUCTI | 11/20/2019 |
| DOB NOW | Sign | Signed-off | PAUL SIGNS, INC | 10/05/2018 |
| BIS | OT | ISSUED | W.J. REGAN & COMPANY LLC | 03/25/2022 |
| BIS | OT | ISSUED | CANIDO BASONAS CONST SVC | 10/28/2021 |
| BIS | OT | ISSUED | CANIDO BASONAS CONST SVC | 12/10/2020 |
| BIS | OT | ISSUED | BALATON CONSTRUCTION OF N | 06/30/2020 |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/17/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/24/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 05/28/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 11/21/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/07/2024 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 08/30/2024 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 08/20/2024 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 08/16/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/19/2024 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 04/11/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/09/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/27/2024 | Pass-Final Sign Permit Inspection | Pass | View ↗ |
| 03/06/2024 | Pass-Final Sign Permit Inspection | Pass | View ↗ |
| 03/01/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/22/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/05/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/14/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/31/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/29/2026 | Tenant Protection Plan Compliance | Jon Colatrella | special |
| 07/29/2026 | Structural Steel - High Strength Bolting | Jon Colatrella | special |
| 07/29/2026 | Post-installed Anchors | Jon Colatrella | special |
| 07/29/2026 | Structural Steel - Welding | Jon Colatrella | special |
| 07/29/2026 | Structural Steel - Details | Jon Colatrella | special |
| 07/29/2026 | Sprayed fire-resistant materials | Jon Colatrella | special |
| 07/29/2026 | Structural Stability – Alterations of existing buildings | Jon Colatrella | special |
| 07/29/2026 | Final | Jon Colatrella | progress |
| 07/29/2026 | Concrete - Cast-In-Place | Jon Colatrella | special |
| 07/24/2026 | Tenant Protection Plan Compliance | — | special |
| 07/24/2026 | Final | — | progress |
| 07/24/2026 | Concrete - Cast-In-Place | — | special |
| 07/24/2026 | Post-installed Anchors | — | special |
| 07/24/2026 | Sprayed fire-resistant materials | — | special |
| 07/24/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 07/24/2026 | Structural Steel - Details | — | special |
| 07/24/2026 | Structural Steel - High Strength Bolting | — | special |
| 07/24/2026 | Structural Steel - Welding | — | special |
| 03/31/2026 | Interior lighting power | Frank Martarella III | energy_progress |
| 03/31/2026 | Shutoff dampers | Frank Martarella III | energy_progress |
| 03/31/2026 | HVAC-R and service water heating system controls | Frank Martarella III | energy_progress |
| 03/31/2026 | Lighting controls | Frank Martarella III | energy_progress |
| 03/31/2026 | Duct leakage testing, insulation and design | Frank Martarella III | energy_progress |
| 03/31/2026 | HVAC-R and service water heating equipment | Frank Martarella III | energy_progress |
| 03/31/2026 | Permanent certificate | Frank Martarella III | energy_progress |