The Macon on the Park Condominium
762 MACON ST · BIN 3429194
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction26p · 2 filings · 20 docs
PenthouseUnder Construction22p · 1 filing · 20 docs
Floor 4Under Construction25p · 1 filing · 20 docs
Floor 3Under Construction25p · 1 filing · 20 docs
Floor 2Under Construction25p · 1 filing · 20 docs
Floor 1Under Construction23p · 1 filing · 20 docs
CellarUnder Construction28p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AB+R CONSTRUCTION3907/08/2026
CLASSIC CONSULTING GROUP907/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/28/2022$888K—Private party → 762 MACON ST LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARC ARCHITECTURE + DESIGN STUDIO706/04/2024
ARQUITECTURA VARELA410/18/2022
ELEVATED ENGINEERING NYC312/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STONECORE LLC603/21/2026
ARC ARCHITECTURE + DESIGN STUDIO303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AB PLUS R CONSTRUCTION INGeneral Contractor1107/08/2026
CLASSIC CONSULTING GROUPGeneral Contractor304/09/2026
ACCESS SOLUTIONS GROUP, LGeneral Contractor207/08/2026
TRI CITY MECHANICAL GROUP CORPPlumbing207/08/2026
JEM FIRE PREVENTION INCFire Protection107/08/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519806/04/2024
IP CONCRETE TESTING AND I6252112/20/2021
Building Lifecycle
All (146)Filed (14)Permit Issued (20)Signed Off (9)Violation (5)Inspection (12)Objection (56)Special Inspection (30)
04/03/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/18/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
03/06/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/09/2024
Signed off — New Building
PROPOSED 4 STORY RESIDENTIAL BUILDING
B00610039-S5
08/20/2024
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
08/07/2024
Signed off — New Building
PROPOSED 4 STORY RESIDENTIAL BUILDING
B00610039-S6
06/13/2024
Special inspection requirement — Post-installed Anchors
Younes Abouyaala
06/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
06/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
06/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
06/13/2024
Special inspection requirement — Maintenance information
Younes Abouyaala
06/13/2024
Special inspection requirement — Metering
Younes Abouyaala
06/13/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
06/13/2024
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
06/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/04/2024
Filed — New Building
PROPOSED 4 STORY RESIDENTIAL BUILDING
B00610039-P2
05/30/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/14/2024
Permit issued — General Construction
B00610039-I1-GC
04/04/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
03/27/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
03/15/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/13/2024
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION.
B08016437-I1
03/13/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
B08005460-I1
03/07/2024
Permit issued — Curb Cut
B00610039-S6-CC
02/05/2024
Signed off — New Building
PROPOSED 4 STORY RESIDENTIAL BUILDING
B00610039-S4
02/05/2024
Signed off — Alteration
B00647543-I1
11/30/2023
Permit issued — Sprinklers
B00610039-S5-PL
11/16/2023
Permit issued — Sprinklers
B00610039-S5-EW-SP
11/15/2023
Permit issued — Sprinklers
B00610039-S5-PL
11/13/2023
Signed off — New Building
PROPOSED 4 STORY RESIDENTIAL BUILDING
B00610039-S2
11/13/2023
Signed off — New Building
PROPOSED 4 STORY RESIDENTIAL BUILDING
B00610039-S1
10/26/2023
Permit issued — General Construction
B00610039-I1-GC
10/25/2023
Signed off — New Building
PROPOSED 4 STORY RESIDENTIAL BUILDING
B00610039-S3
10/17/2023
Permit issued — Construction Fence
B00647543-I1-FN
08/22/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/11/2023
Permit issued — Sidewalk Shed
B08005460-I1-SH
08/11/2023
Permit issued — Supported Scaffold
B08016437-I1-SF
07/18/2023
Permit issued — Mechanical Systems
B00610039-S4-MS
07/18/2023
Permit issued — Structural
B00610039-S3-ST
07/17/2023
Permit issued — Support of Excavation
B00610039-S1-SE
05/17/2023
Permit issued — Plumbing
B00610039-S5-PL
05/11/2023
Permit issued — Construction Fence
B00647543-I1-FN
04/18/2023
Objection resolved — Addressed
04/14/2023
Objection raised — Scope
04/14/2023
Objection raised — Scope
04/14/2023
Objection resolved — Addressed
04/14/2023
Objection raised — Scope
04/14/2023
Objection resolved — Addressed
04/12/2023
Filed — New Building
PROPOSED 4 STORY RESIDENTIAL BUILDING
B00610039-S6
04/07/2023
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
04/07/2023
Special inspection requirement — Masonry
Younes Abouyaala
04/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/07/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
04/07/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
04/07/2023
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
04/07/2023
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
04/07/2023
Special inspection requirement — Lighting controls
Younes Abouyaala
04/07/2023
Special inspection requirement — Metering
Younes Abouyaala
04/07/2023
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
Latest 60 of 146 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAB PLUS R CONSTRUCTION IN05/14/2024
DOB NOWCurb CutSigned-offAB PLUS R CONSTRUCTION IN03/07/2024
DOB NOWSprinklersSigned-offFLAVIO MECHANICAL CORP11/30/2023
DOB NOWSprinklersSigned-offJEM FIRE PREVENTION INC11/16/2023
DOB NOWSprinklersSigned-offFLAVIO MECHANICAL CORP11/15/2023
DOB NOWGeneral ConstructionPermit IssuedAB PLUS R CONSTRUCTION IN10/26/2023
DOB NOWConstruction FenceSigned-offAB PLUS R CONSTRUCTION IN10/17/2023
DOB NOWSidewalk ShedSigned-offACCESS SOLUTIONS GROUP L08/11/2023
DOB NOWSupported ScaffoldSigned-offACCESS SOLUTIONS GROUP L08/11/2023
DOB NOWMechanical SystemsSigned-offAB PLUS R CONSTRUCTION IN07/18/2023
DOB NOWStructuralSigned-offAB PLUS R CONSTRUCTION IN07/18/2023
DOB NOWSupport of ExcavationSigned-offAB PLUS R CONSTRUCTION IN07/17/2023
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC05/17/2023
DOB NOWConstruction FenceSigned-offAB PLUS R CONSTRUCTION IN05/11/2023
DOB NOWSupported ScaffoldSigned-offCLASSIC CONSULTING GROUP10/06/2022
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP09/19/2022
DOB NOWSprinklersSigned-offPLBG P & H INC09/05/2022
DOB NOWGeneral ConstructionPermit IssuedAB PLUS R CONSTRUCTION IN07/25/2022
DOB NOWConstruction FenceSigned-offAB PLUS R CONSTRUCTION IN06/30/2022
DOB NOWFoundationSigned-offAB PLUS R CONSTRUCTION IN06/09/2022
1 project · most recent 06/04/2024
Sprinkler System
FiledStatusContractorScope
06/04/2024Signed-offJEM FIRE PREVENTION INCSprinkler System
1 project · most recent 06/04/2024
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
06/04/2024Signed-offTRI CITY MECHANICAL GROUPGas, Plumbing-Sprinkler, Storm, Water/Sanitary
3 projects · most recent 05/30/2024
General Wiring
FiledStatusContractorScope
05/30/2024CompleteRONEY ELECTRIC INCGeneral Wiring
09/30/2022CompleteRONEY ELECTRIC INC—
08/26/2022CompleteRICHARD NEU—
1 project · most recent 06/04/2024
Concrete
FiledStatusContractorScope
06/04/2024Permit IssuedAB PLUS R CONSTRUCTION INConcrete
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
04/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/18/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
03/06/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/20/2024Fail-Final SP - Up to 3 Requested FloorsFailView ↗
05/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/04/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
03/27/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
03/15/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
08/22/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/10/2023Pass-Final House ConnectionPassView ↗
09/09/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/09/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
06/13/2024Post-installed AnchorsYounes Abouyaalaspecial
06/13/2024HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
06/13/2024HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
06/13/2024HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
06/13/2024Maintenance informationYounes Abouyaalaenergy_progress
06/13/2024MeteringYounes Abouyaalaenergy_progress
06/13/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
06/13/2024Sprinkler SystemsYounes Abouyaalaspecial
06/13/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/07/2023Air barrier - visual inspectionYounes Abouyaalaenergy_progress
04/07/2023MasonryYounes Abouyaalaspecial
04/07/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/07/2023Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
04/07/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
04/07/2023Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
04/07/2023Insulation placement and R valuesYounes Abouyaalaenergy_progress
04/07/2023Lighting in dwelling unitsYounes Abouyaalaenergy_progress
04/07/2023Lighting controlsYounes Abouyaalaenergy_progress
04/07/2023MeteringYounes Abouyaalaenergy_progress
04/07/2023Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
04/07/2023Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
04/07/2023Exterior lighting powerYounes Abouyaalaenergy_progress
04/07/2023Interior lighting powerYounes Abouyaalaenergy_progress
04/07/2023Maintenance informationYounes Abouyaalaenergy_progress
04/07/2023Fenestration areasYounes Abouyaalaenergy_progress
Latest 25 of 52.
▾Documents — 110 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/31/2026B00610039-S5Request digital key ↗
08/31/2026B00610039-S4Request digital key ↗
08/31/2026B00610039-P2Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION5
03/19/2024322115377Open ↗
02/12/2024340830916Open ↗
04/10/2023340830916Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
08/19/2022340830916Open ↗
08/19/2022340830916Open ↗
02/23/2022340830916Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
03/21/2024322115377Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00610039-I1Open ↗
08/13/2026B00610039-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00610039-P1Open ↗
08/13/2026B00610039-I1Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/21/2024322115377Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
03/21/2024322115377Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
03/21/2024322115377Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
02/23/2022340830916Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00610039-I1Open ↗
▸Seals & Professional Certifications37
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/31/2026B00610039-S5Open ↗
08/31/2026B00610039-I1Open ↗
08/31/2026B00647543-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026B00610039-S2Open ↗
09/01/2026B00610039-S2Open ↗
09/01/2026B00610039-S2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026B00610039-S2Open ↗
09/01/2026B00610039-S2Open ↗
09/01/2026B00610039-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/23/2022340830916Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/23/2022340830916Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00610039-P1Open ↗
08/13/2026B00610039-I1Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST2
08/19/2022340830916Open ↗
08/15/2022340830916Open ↗
▸DOB NOWStreet Tree Checklist2
08/13/2026B00610039-P1Open ↗
08/13/2026B00610039-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
08/19/2022340830916Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00610039-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00610039-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00610039-I1Open ↗
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification3
08/13/2026B00610039-S5Open ↗
08/13/2026B00610039-S4Open ↗
08/13/2026B00610039-S2Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00610039-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00610039-S2Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00610039-S2Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00610039-S2Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION5
03/21/2024322115377Open ↗
03/21/2024322115377Open ↗
03/21/2024322115377Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
04/04/2024340830916Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION4
02/15/2024340830916Open ↗
04/19/2023340830916Open ↗
08/19/2022340830916Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
02/23/2022340830916Open ↗
▸BISEFILING COVER SHEET1
03/19/2024322115377Open ↗
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
03/19/2024322115377Open ↗
03/19/2024322115377Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B00610039-I1Open ↗
08/13/2026B00610039-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00610039-P1Open ↗
08/13/2026B00610039-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/15/2026B00610039-I1Open ↗
08/13/2026B00610039-P1Open ↗
▸BISPLOT DIAGRAM1
03/21/2024322115377Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00610039-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00610039-S1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00610039-I1Open ↗