← Back
Two stories - detached, small or mid-size
7621 12 AVENUE
BROOKLYN · BIN 3160540
💬 Discuss this project
1915Year Built
2Stories
A1Building Class
R4-1Zoning
1,740 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: 7621 12TH AVE LLC · 4,000 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Floor 22p · 2 filings · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar3p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/11/2022$1.6M—— → —$920/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONSELA ENGINEERING P.C.1011/12/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DILEO CONSTRUCTION CORPGeneral Contractor1007/08/2026
MACKLER MASTER FIRE INCPlumbing207/08/2026
ASCUATECH ELECTRICAL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONSELA ENGINEERING P.C.353811/12/2023
Building Lifecycle
All (128)Filed (10)Permit Issued (9)Signed Off (6)Inspection (5)Objection (68)Special Inspection (30)
12/05/2023
Signed off — Alteration
Underpinning to lower cellar floor level.
B08021801-I1
12/05/2023
Signed off — Alteration
SUBSEQUENT FILING IS FILED TO AMEND PLANS TO MATCH PLANS OF JOB B08021801. NO WORK IS DONE UNDER THIS APPLICATION. NO CHANGES TO ZONING ANALYSIS OF THE INITIAL JOB B00809618-I1. ALL WORK IS DONE IN JOBS B08021801 AND B00809618-I1
B00809618-I1
12/05/2023
Signed off — Alteration
Underpinning to lower cellar floor level.
B08021801-S1
12/05/2023
Signed off — Alteration
CONSTRUCT DUCTLESS MINI-SPLIT HVAC SYSTEM
B08023450-I1
12/05/2023
Signed off — Alteration
PAA P2 IS FILED TO AMEND SCHEDULE B, PW3 BECAUSE GAS DRYER WAS REPLACED WITH ELECTRIC DRYER AT THE SAME LOCATION. PLUMBING WORK IN CONJUNCTION WITH GC B08021801 INCLUDING REMOVING, RELOCATING EXISTING FIXTURES AND INSTALLING NEW FIXTURES AS LISTED ON PLAN
B08023447-I1
12/04/2023
Signed off — Alteration
CONSTRUCTION EQUIPMENT FENCE IN CONJUNCTION WITH B08021801
B08023389-I1
11/20/2023
Permit issued — Foundation
B08021801-S1-FO
11/20/2023
Special inspection requirement — Energy Code Compliance Inspections
SERGEY DRABKIN
11/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERGEY DRABKIN
11/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SERGEY DRABKIN
11/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
SERGEY DRABKIN
11/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
SERGEY DRABKIN
11/15/2023
Objection raised — Other
11/15/2023
Objection resolved — Addressed
11/13/2023
Objection resolved — Addressed
11/12/2023
Filed — Alteration
PAA P2 IS FILED TO AMEND SCHEDULE B, PW3 BECAUSE GAS DRYER WAS REPLACED WITH ELECTRIC DRYER AT THE SAME LOCATION. PLUMBING WORK IN CONJUNCTION WITH GC B08021801 INCLUDING REMOVING, RELOCATING EXISTING FIXTURES AND INSTALLING NEW FIXTURES AS LISTED ON PLAN
B08023447-P2
11/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERGEY DRABKIN
11/12/2023
Special inspection requirement — HVAC-R and service water heating equipment
SERGEY DRABKIN
11/12/2023
Special inspection requirement — HVAC-R and service water heating system controls
SERGEY DRABKIN
11/12/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SERGEY DRABKIN
11/12/2023
Special inspection requirement — Energy Code Compliance Inspections
SERGEY DRABKIN
11/08/2023
Permit issued — Mechanical Systems
B08023450-I1-MS
11/08/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/05/2023
Objection resolved — Addressed
10/31/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/27/2023
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
10/20/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/09/2023
Filed — Alteration
CONSTRUCT DUCTLESS MINI-SPLIT HVAC SYSTEM
B08023450-I1
10/09/2023
Filed — Alteration
PAA P2 IS FILED TO AMEND SCHEDULE B, PW3 BECAUSE GAS DRYER WAS REPLACED WITH ELECTRIC DRYER AT THE SAME LOCATION. PLUMBING WORK IN CONJUNCTION WITH GC B08021801 INCLUDING REMOVING, RELOCATING EXISTING FIXTURES AND INSTALLING NEW FIXTURES AS LISTED ON PLAN
B08023447-P1
10/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERGEY DRABKIN
10/08/2023
Special inspection requirement — HVAC-R and service water heating equipment
SERGEY DRABKIN
10/08/2023
Special inspection requirement — Energy Code Compliance Inspections
SERGEY DRABKIN
10/08/2023
Special inspection requirement — HVAC-R and service water heating system controls
SERGEY DRABKIN
10/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SERGEY DRABKIN
09/19/2023
Special inspection requirement — Final
SERGEY DRABKIN
09/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERGEY DRABKIN
09/19/2023
Special inspection requirement — Concrete - Cast-In-Place
SERGEY DRABKIN
09/19/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SERGEY DRABKIN
09/19/2023
Special inspection requirement — HVAC-R and service water heating system controls
SERGEY DRABKIN
09/19/2023
Special inspection requirement — Fenestration air leakage
SERGEY DRABKIN
09/19/2023
Special inspection requirement — Fenestration areas
SERGEY DRABKIN
09/19/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
SERGEY DRABKIN
09/19/2023
Special inspection requirement — Metering
SERGEY DRABKIN
09/19/2023
Special inspection requirement — HVAC-R and service water heating equipment
SERGEY DRABKIN
09/19/2023
Special inspection requirement — Air barrier - visual inspection
SERGEY DRABKIN
09/19/2023
Special inspection requirement — Interior lighting power
SERGEY DRABKIN
09/19/2023
Special inspection requirement — Fire-Resistance Rated Construction
SERGEY DRABKIN
09/19/2023
Special inspection requirement — Energy Code Compliance Inspections
SERGEY DRABKIN
09/19/2023
Special inspection requirement — Insulation placement and R values
SERGEY DRABKIN
09/15/2023
Objection resolved — Addressed
09/15/2023
Objection resolved — Addressed
09/15/2023
Objection resolved — Addressed
08/30/2023
Objection raised — Structural
08/30/2023
Objection raised — Other
08/26/2023
Filed — Alteration
Underpinning to lower cellar floor level.
B08021801-S1
08/11/2023
Permit issued — Plumbing
B08023447-I1-PL
08/04/2023
Permit issued — General Construction
B08021801-I1-GC
08/04/2023
Permit issued — Construction Fence
B08023389-I1-FN
06/06/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/03/2023
Objection resolved — Addressed
Latest 60 of 128 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offDILEO CONSTRUCTION CORP11/20/2023
DOB NOWMechanical SystemsSigned-offDILEO CONSTRUCTION CORP11/08/2023
DOB NOWPlumbingSigned-offMACKLER MASTER FIRE INC08/11/2023
DOB NOWGeneral ConstructionSigned-offDILEO CONSTRUCTION CORP08/04/2023
DOB NOWConstruction FenceSigned-offDILEO CONSTRUCTION CORP08/04/2023
DOB NOWGeneral ConstructionSigned-offDILEO CONSTRUCTION CORP04/21/2023
DOB NOWGeneral ConstructionSigned-offDILEO CONSTRUCTION CORP04/21/2023
DOB NOWConstruction FenceSigned-offDILEO CONSTRUCTION CORP02/06/2023
DOB NOWPlumbingSigned-offMACKLER MASTER FIRE INC12/22/2022
1 project · most recent 01/09/2024
General Wiring
FiledStatusContractorScope
01/09/2024CompleteASCUATECH ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/08/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/31/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/27/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
10/20/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/06/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
11/20/2023Fire-Resistant Penetrations and JointsSERGEY DRABKINspecial
11/20/2023HVAC-R and service water heating equipmentSERGEY DRABKINenergy_progress
11/20/2023HVAC-R and service water piping design and insulationSERGEY DRABKINenergy_progress
11/20/2023HVAC-R and service water heating system controlsSERGEY DRABKINenergy_progress
11/20/2023Energy Code Compliance InspectionsSERGEY DRABKINprogress
11/12/2023HVAC-R and service water heating equipmentSERGEY DRABKINenergy_progress
11/12/2023HVAC-R and service water piping design and insulationSERGEY DRABKINenergy_progress
11/12/2023HVAC-R and service water heating system controlsSERGEY DRABKINenergy_progress
11/12/2023Energy Code Compliance InspectionsSERGEY DRABKINprogress
11/12/2023Fire-Resistant Penetrations and JointsSERGEY DRABKINspecial
10/08/2023Energy Code Compliance InspectionsSERGEY DRABKINprogress
10/08/2023HVAC-R and service water piping design and insulationSERGEY DRABKINenergy_progress
10/08/2023HVAC-R and service water heating system controlsSERGEY DRABKINenergy_progress
10/08/2023HVAC-R and service water heating equipmentSERGEY DRABKINenergy_progress
10/08/2023Fire-Resistant Penetrations and JointsSERGEY DRABKINspecial
09/19/2023Fenestration and door U-factor and product ratingsSERGEY DRABKINenergy_progress
09/19/2023Fenestration areasSERGEY DRABKINenergy_progress
09/19/2023HVAC-R and service water heating equipmentSERGEY DRABKINenergy_progress
09/19/2023HVAC-R and service water piping design and insulationSERGEY DRABKINenergy_progress
09/19/2023HVAC-R and service water heating system controlsSERGEY DRABKINenergy_progress
09/19/2023Fenestration air leakageSERGEY DRABKINenergy_progress
09/19/2023Energy Code Compliance InspectionsSERGEY DRABKINprogress
09/19/2023Air barrier - visual inspectionSERGEY DRABKINenergy_progress
09/19/2023Interior lighting powerSERGEY DRABKINenergy_progress
09/19/2023Insulation placement and R valuesSERGEY DRABKINenergy_progress
Latest 25 of 62.
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/28/2026B08023389-I1Request digital key ↗
08/28/2026B08021801-S1Request digital key ↗
08/28/2026B08021801-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWRestrictive Declaration/Easement 15
08/13/2026B08023447-P1Open ↗
08/13/2026B08023447-I1Open ↗
08/13/2026B08021801-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00809618-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B00809618-I1Open ↗
▸Seals & Professional Certifications41
▸DOB NOWProgress Inspector Seal & Signature20
09/01/2026B08023447-P2Open ↗
09/01/2026B08023447-P2Open ↗
08/30/2026B08023447-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026B08023447-P2Open ↗
08/30/2026B08023447-P1Open ↗
08/26/2026B08021801-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026B08021801-P1Open ↗
08/28/2026B08021801-S1Open ↗
08/28/2026B08021801-I1Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/28/2026B08021801-I1Open ↗
08/28/2026B08021801-S1Open ↗
08/26/2026B08023447-P2Open ↗
Showing 3 of 9 on file for this type
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B08021801-S1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B08021801-S1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B08021801-S1Open ↗
▸Other Documents3
▸DOB NOWPlot Diagram1
08/13/2026B00809618-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00809618-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B00809618-I1Open ↗