Over six families without stores
PARK AVENUE
BROOKLYN · BIN 3429283
💬 Discuss this project
2022Year Built
4Stories
C1Building Class
R6AZoning
5,660 sfGross Floor Area
8Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Over six families without stores · Owner of record: P36 LLC · 1,786 sf lot · 3.17 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Roof3p · 4 filings · 20 docs
Bulkhead3p · 2 filings · 10 docs
Floor 45p · 4 filings · 20 docs
Floor 33p · 3 filings · 20 docs
Floor 24p · 4 filings · 20 docs
Floor 14p · 4 filings · 20 docs
Cellar6p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW AMERICAN CONSTRUCTION INC907/08/2026
P361103/22/2026
Y N H CONSTRUCTION303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&D ENGINEERING, PLLC710/12/2023
ENTHINK ENGINEERS LLC307/27/2022
TITAN ENGINEERS PC101/11/2022
SOUTH BAY ENGINEERING PLLC110/15/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITING 4 U803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JSB WORKS INCGeneral Contractor1603/22/2026
S WIEDER ARCHITECT P CGeneral Contractor303/22/2026
Y.N.H. CONSTRUCTION INCGeneral Contractor307/08/2026
NEW AMERICAN CONSTRUCTION INCGeneral Contractor207/08/2026
NEW YORK STANDARD MECH COFire Protection107/08/2026
PIPE SOLUTIONS ADVIS INCPlumbing107/08/2026
ALL STAR 1 LLCGeneral Contractor107/08/2026
SUPERB CONSTRUCTION MGTGeneral Contractor107/08/2026
MPI PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616610/12/2023
Building Lifecycle
All (88)Filed (12)Permit Issued (13)Signed Off (6)Violation (9)Inspection (6)Objection (12)Special Inspection (30)
05/11/2026
Violation issued (HPD, closed)
A
11/18/2025
Violation issued (HPD, closed)
I
12/18/2023
Signed off — Alteration
Plumbing application filed in conjunction with NB job application #321592102
B00372057-I1
11/20/2023
Signed off — Alteration
SPRINKLER APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING JOB #321592102.
B00368953-I1
11/08/2023
Signed off — Alteration
B00400831-I1
11/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/08/2023
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
11/01/2023
Objection resolved — Addressed
10/27/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
10/27/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
10/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
10/27/2023
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
10/27/2023
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
10/27/2023
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
10/23/2023
Objection resolved — Addressed
10/17/2023
Objection raised — Other
10/17/2023
Objection resolved — Addressed
10/17/2023
Objection raised — Energy
10/12/2023
Signed off — Alteration
MECHANICAL APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING JOB # 321592102.
B00369991-I1
10/12/2023
Filed — Alteration
Plumbing application filed in conjunction with NB job application #321592102
B00372057-P2
09/29/2023
Objection raised — Scope
09/28/2023
Permit issued — Mechanical Systems
B00369991-I1-MS
09/28/2023
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
09/28/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
09/28/2023
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
09/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/28/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/28/2023
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
09/27/2023
Filed — Alteration
SPRINKLER APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING JOB #321592102.
B00368953-P1
09/25/2023
Special inspection requirement — Shutoff dampers
FAHAD FATEH
09/25/2023
Special inspection requirement — Heating Systems
FAHAD FATEH
09/25/2023
Special inspection requirement — Mechanical Systems
FAHAD FATEH
09/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/25/2023
Special inspection requirement — Final
FAHAD FATEH
09/25/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/25/2023
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
09/25/2023
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
09/25/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
09/25/2023
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
09/25/2023
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
09/20/2023
Objection resolved — Addressed
09/20/2023
Objection resolved — Addressed
09/19/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/13/2023
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
07/18/2023
Signed off — Alteration
STRUCTURAL APPLICATION FILED IN CONJUNCTION TO NEW BUILDING JOB #321592102.
B00413354-I1
07/14/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/12/2023
Permit issued — Construction Fence
B00400831-I1-FN
07/12/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/27/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00583124-I1
06/22/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/23/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/22/2023
Violation issued (ECB, closed)
Construction
01/17/2023
Permit issued — Sprinklers
B00368953-I1-EW-SP
01/12/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/13/2022
Permit issued — Plumbing
B00372057-I1-PL
09/01/2022
Permit issued — Sidewalk Shed
B00583124-I1-SH
09/01/2022
Violation issued (ECB, closed)
Construction
08/17/2022
Permit issued — Structural
B00413354-I1-ST
07/27/2022
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00583124-P2
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offJSB WORKS INC09/28/2023
DOB NOWConstruction FenceSigned-offJSB WORKS INC07/12/2023
DOB NOWSprinklersSigned-offNEW YORK STANDARD MECH CO01/17/2023
DOB NOWPlumbingSigned-offPIPE SOLUTIONS ADVIS INC12/13/2022
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION09/01/2022
DOB NOWStructuralSigned-offJSB WORKS INC08/17/2022
DOB NOWConstruction FenceSigned-offJSB WORKS INC07/13/2022
DOB NOWStructuralSigned-offY.N.H. CONSTRUCTION INC04/08/2022
DOB NOWPlumbingSigned-offYG SERVICES INC12/10/2021
DOB NOWConstruction FenceSigned-offY.N.H. CONSTRUCTION INC10/12/2021
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION08/30/2021
DOB NOWConstruction FenceSigned-offALL STAR 1 LLC06/21/2021
DOB NOWConstruction FenceSigned-offSUPERB CONSTRUCTION MGT01/26/2021
BIS—ISSUEDJSB WORKS INC07/11/2023
BIS—ISSUEDJSB WORKS INC05/24/2023
BIS—ISSUEDJSB WORKS INC05/24/2023
BIS—ISSUEDJSB WORKS INC09/22/2022
BIS—ISSUEDJSB WORKS INC09/22/2022
BIS—ISSUEDJSB WORKS INC08/11/2022
BIS—ISSUEDJSB WORKS INC08/11/2022
BIS—ISSUEDJSB WORKS INC07/06/2022
BIS—ISSUEDJSB WORKS INC07/06/2022
BIS—ISSUEDY.N.H. CONSTRUCTION INC01/27/2022
BIS—ISSUEDY.N.H. CONSTRUCTION INC01/27/2022
BIS—ISSUEDY.N.H. CONSTRUCTION INC11/30/2021
BIS—ISSUEDY.N.H. CONSTRUCTION INC11/30/2021
2 projects · most recent 12/13/2022
General Wiring
FiledStatusContractorScope
12/13/2022CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
08/31/2021CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/19/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/14/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/12/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/23/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/12/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
11/08/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/08/2023Sprinkler SystemsFAHAD FATEHspecial
10/27/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
10/27/2023Maintenance informationFAHAD FATEHenergy_progress
10/27/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
10/27/2023HVAC and service water heating equipment FAHAD FATEHenergy_progress
10/27/2023HVAC insulation and sealing FAHAD FATEHenergy_progress
10/27/2023HVAC and service water heating system controls FAHAD FATEHenergy_progress
09/28/2023HVAC insulation and sealing FAHAD FATEHenergy_progress
09/28/2023Maintenance informationFAHAD FATEHenergy_progress
09/28/2023HVAC and service water heating system controls FAHAD FATEHenergy_progress
09/28/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/28/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
09/28/2023HVAC and service water heating equipment FAHAD FATEHenergy_progress
09/25/2023Shutoff dampersFAHAD FATEHenergy_progress
09/25/2023Heating SystemsFAHAD FATEHspecial
09/25/2023Mechanical SystemsFAHAD FATEHspecial
09/25/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/25/2023FinalFAHAD FATEHprogress
09/25/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
09/25/2023Fire-Resistance Rated ConstructionFAHAD FATEHprogress
09/25/2023HVAC insulation and sealing FAHAD FATEHenergy_progress
09/25/2023Maintenance informationFAHAD FATEHenergy_progress
09/25/2023HVAC and service water heating equipment FAHAD FATEHenergy_progress
09/25/2023HVAC and service water heating system controls FAHAD FATEHenergy_progress
Latest 25 of 44.
▾Documents — 173 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00372057-I1Request digital key ↗
09/02/2026B00372057-P1Request digital key ↗
08/15/2026B00372057-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00369991-I1Request digital key ↗
08/15/2026B00369991-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026B00368953-I1Request digital key ↗
08/15/2026B00368953-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00400831-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/31/2026B00413354-I1Request digital key ↗
▸Applications & Permits36
▸BISWORK PERMIT APPLICATION21
05/31/2023321592102Open ↗
05/31/2023321592102Open ↗
05/31/2023321592102Open ↗
Showing 3 of 21 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
11/08/2023321592102Open ↗
09/25/2023321592102Open ↗
04/27/2023321592102Open ↗
Showing 3 of 12 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
09/21/2022340741914Open ↗
08/03/2020340741914Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/19/2023321592102Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISZONING DIAGRAM3
10/17/2023321592102Open ↗
05/03/2023321592102Open ↗
06/07/2021321592102Open ↗
▸BISVERIFY TAX LOT1
07/06/2023321592102Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
06/07/2021321592102Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/05/2023321592102Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
06/07/2021321592102Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
07/22/2020321592102Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/07/2021321592102Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
05/03/2023321592102Open ↗
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/02/2026B00368953-I1Open ↗
09/02/2026B00368953-P1Open ↗
08/31/2026B00413354-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/26/2026B00372057-P1Open ↗
09/26/2026B00372057-P1Open ↗
08/31/2026B00369991-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/26/2026B00372057-P1Open ↗
08/31/2026B00369991-I1Open ↗
08/28/2026B00372057-P2Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/30/2021321592102Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/03/2020340741914Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/03/2020340741914Open ↗
▸Trade Schedules & Equipment4
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
11/08/2023321592102Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
11/07/2023321592102Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
08/31/2020321592102Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/08/2023321592102Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST4
10/20/2022340741914Open ↗
06/07/2021321592102Open ↗
08/10/2020321592102Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
10/20/2022340741914Open ↗
▸BISSTREET TREE SIGNOFF1
12/05/2023321592102Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
09/21/2022340741914Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/05/2023321592102Open ↗
12/05/2023321592102Open ↗
06/07/2021321592102Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/30/2021321592102Open ↗
11/26/2021321592102Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/05/2023321592102Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00369991-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00372057-I1Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY5
12/05/2023321592102Open ↗
12/05/2023321592102Open ↗
06/07/2021321592102Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
02/22/2022321592102Open ↗
11/30/2021321592102Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
10/19/2023321592102Open ↗
11/30/2021321592102Open ↗
▸BISSOIL REPORT1
08/31/2020321592102Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/31/2020321592102Open ↗
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
11/26/2021321592102Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
11/09/2023321592102Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
11/26/2021321592102Open ↗
▸Approvals, Objections & Sign-offs18
▸BISLETTERS - SUPPORTING DOCUMENTATION9
05/31/2023321592102Open ↗
05/31/2023321592102Open ↗
05/31/2023321592102Open ↗
Showing 3 of 9 on file for this type
▸BISSUPERSEDING LETTER6
09/27/2022321592102Open ↗
09/27/2022321592102Open ↗
09/27/2022321592102Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
12/01/2022321592102Open ↗
06/03/2021321592102Open ↗
06/02/2021321592102Open ↗
▸Cost, Insurance & Ownership8
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE3
05/31/2023321592102Open ↗
05/31/2023321592102Open ↗
11/26/2021321592102Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE3
05/31/2023321592102Open ↗
07/08/2022321592102Open ↗
11/30/2021321592102Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
11/30/2021321592102Open ↗
11/26/2021321592102Open ↗
▸Filing & Intake Forms28
▸BISADDITIONAL INFORMATION16
11/24/2023321592102Open ↗
10/17/2023321592102Open ↗
05/03/2023321592102Open ↗
Showing 3 of 16 on file for this type
▸BISBOROUGH INTAKE FORM8
05/31/2023321592102Open ↗
05/31/2023321592102Open ↗
09/27/2022321592102Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET2
11/04/2020321592102Open ↗
06/19/2020321592102Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/03/2020340741914Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/03/2020340741914Open ↗
▸Other Documents5
▸BISPLOT DIAGRAM2
06/07/2021321592102Open ↗
10/29/2020321592102Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
06/07/2021321592102Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/30/2021321592102Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
09/21/2022340741914Open ↗