ECB01/29/2025FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #39075471X ISSUED ON 12/11/2022, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERT$625 due
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB03/16/1999V-DOB VIOLATION - ACTIVE
ECB12/11/2022WORK W/O PERMIT(S) - WORK NOTED: AT RIGHT SIDE OF BUILDING - INSTALLED NEW LED LIGHT FIXTURES (4) WITHOUT AN ELECTRICAL PERMIT ON FILE - LIGHT ILLUMINATING PAST THE PARKING LOT AND SHINING ONTO THE ADJACENT(S)Nothing owed — awaiting certificate of correction
ECB12/05/20113314.1:PARTIAL STOP WORK ORDER STOP ALL USE OF SUPPORTED SCAFFOLD ISSUED PURSUANT TO 28-207.2 & POSTED AT THE PREMISES SUPPORTED SCAFFOLDINGS DOES NOT MEET THE BUILDING CODE REQUIREMENTS MISC VIOLATION EXIST UPNothing owed — awaiting certificate of correction
ECB12/05/20113314.4.3:FAILURE TO PROVIDE DAILY INSPECTION LOG FOR SUPPORTED SCAFFOLD UPON INSPECTION SUPPORTED SCAFFOLD OF VARIOUS HEIGHT 30-38FT HAVE BEEN ERECTED & IN USE. WORKERS ARE WORKING ON THE SCAFFOLD. AT TIME OF INothing owed — awaiting certificate of correction
ECB12/05/2011USE OF SUPPORTED SCAFFOLD WITHOUT A SCAFFOLD USER CERTIFICATE UPON INSPECTION NOTED SUPPORTED SCAFFOLDING OF VARIOUS HEIGHT 30-38FT HAVE BEEN ERECTED AROUND THE 3 STORY BUILDING WORKERS ARE WORKING ON THE SCAFFNothing owed — awaiting certificate of correction
ECB02/01/1989OPERATION OF A PLACE OF ASSEMBLY WITHOUT A CURRENT PERMIT. OPERATION OF A PA CONTRARY TO THE C OF O WHEN CURRENT C OF O ALLOWS FOR THE OPERATION OF THE PA.Nothing owed — awaiting certificate of correction
ECB02/01/1989FAILURE TO HAVE APPROVED PA PLANS AVAILABLE FOR INSPECTION. REQUIRED MEANS OF EGRESS OBSTRUCTED. REMEDY: PROVIDE APPROVED PA PLANSO INSPECTION CAN BE MADE.Nothing owed — awaiting certificate of correction