← Back
Over six families without stores
Urban Renaissance
765 EAST 166 STREET · BIN 2004708
💬 Discuss this project
1910Year Built
5Stories
C1Building Class
R6Zoning
33,165 sfGross Floor Area
32Units
LL97 CoveredRent Stabilized35 Open Violations 30 unresolved · 5 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: NEW YORK EQUITY FUND 2004 LLC · 10,138 sf lot · 3.27 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction33p · 1 filing · 18 docs
Floor 5Under Construction30p · 1 filing · 18 docs
Floor 4Under Construction29p · 1 filing · 18 docs
Floor 3Under Construction29p · 1 filing · 18 docs
Floor 2Under Construction29p · 1 filing · 18 docs
Floor 1Under Construction29p · 1 filing · 18 docs
CellarUnder Construction9p · 1 filing · 18 docs
Sub-BasementUnder Construction29p · 1 filing · 18 docs
1 job · most recent 08/23/2026
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/23/2026Permit IssuedNOTIAS CONSTRUCTION INCHeating and Air Conditioning Systems, Heating Systems
Heat / Cool
Ephoca AWP10N3H1-2 7,353 BTU · Heat Pump Outdoor ×102
Heating
Stelpro ARWF-1001T 1,750 BTU · Electric Heater ×19
AWFA2008T 6,826 BTU · Electric Heater ×5
ARWF1001T 1,750 BTU · Electric Heater ×1
1 job · most recent 08/23/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/23/2026Permit IssuedAMERICAN STANDARD P&H CORGas, Storm, Water/Sanitary
3 jobs · most recent 06/17/2026
General Wiring
FiledStatusContractorScope
06/17/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
12/19/2025Permit IssuedTECHNO-VOLT ELEC, INCGeneral Wiring
06/07/2023Permit IssuedNASH ELECTRIC SERVICES IN—
2 jobs · most recent 06/24/2026
Sidewalk Shed
FiledStatusContractorScope
06/24/2026Permit IssuedAKM CONSTRUCTION NY CORPSidewalk Shed
06/09/2023Signed-offCS BRIDGE CORPSidewalk Shed
Building Lifecycle
All (118)Filed (7)Permit Issued (13)Signed Off (1)Violation (60)Inspection (1)Objection (8)Special Inspection (28)
09/29/2026
Permit issued — Sidewalk Shed
X01418300-I1-SH
09/15/2026
Permit issued — Suspended Scaffold
X01177107-S4-SC
08/23/2026
Filed — Alteration
Propose removals of existing, baseboard, hydronic heating supply and return, and boilers and associated piping. Install condensate pumps, PTHP and electric heater as per plan, filed in conjunction with GC and PL # X01177107-I1 and S1.
X01177107-S4
08/19/2026
Signed off — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X00886610-I1
07/27/2026
Permit issued — Mechanical Systems
X01177107-S2-MS
07/27/2026
Permit issued — General Construction
X01177107-I1-GC
07/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/25/2026
Permit issued — Sidewalk Shed
X01418300-I1-SH
06/24/2026
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING EXTERIOR REPAIRS FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01418300-I1
05/22/2026
Permit issued — Boiler Equipment
X01177107-S3-BE
05/22/2026
Permit issued — Plumbing
X01177107-S1-PL
05/15/2026
Permit issued — Mechanical Systems
X01177107-S2-MS
05/13/2026
Permit issued — Sidewalk Shed
X00886610-I1-SH
05/12/2026
Permit issued — General Construction
X01177107-I1-GC
04/16/2026
Violation issued (ECB, open)
Construction
11/25/2025
Filed — Alteration
Propose removals of existing, baseboard, hydronic heating supply and return, and boilers and associated piping. Install condensate pumps, PTHP and electric heater as per plan, filed in conjunction with GC and PL # X01177107-I1 and S1.
X01177107-S3
11/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MINA HANNA
11/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
MINA HANNA
11/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
MINA HANNA
11/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
11/11/2025
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
11/05/2025
Violation issued (HPD, open)
C
11/05/2025
Violation issued (HPD, open)
C
11/05/2025
Violation issued (HPD, open)
B
11/05/2025
Violation issued (HPD, open)
B
09/30/2025
Objection resolved — Addressed
09/30/2025
Objection resolved — Addressed
09/11/2025
Objection resolved — Addressed
09/11/2025
Special inspection requirement — Insulation placement and R values
MINA HANNA
09/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
MINA HANNA
06/05/2025
Violation issued (HPD, closed)
A
06/02/2025
Objection resolved — Addressed
05/29/2025
Objection raised — Admin
05/29/2025
Objection raised — Admin
05/29/2025
Objection raised — Fire_Protection
05/27/2025
Filed — Alteration
Propose removals of existing, baseboard, hydronic heating supply and return, and boilers and associated piping. Install condensate pumps, PTHP and electric heater as per plan, filed in conjunction with GC and PL # X01177107-I1 and S1.
X01177107-S1
05/27/2025
Filed — Alteration
Propose removals of existing, baseboard, hydronic heating supply and return, and boilers and associated piping. Install condensate pumps, PTHP and electric heater as per plan, filed in conjunction with GC and PL # X01177107-I1 and S1.
X01177107-S2
05/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
MINA HANNA
05/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
MINA HANNA
05/23/2025
Special inspection requirement — Maintenance information
MINA HANNA
05/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MINA HANNA
05/23/2025
Special inspection requirement — Shutoff dampers
MINA HANNA
05/22/2025
Permit issued — Sidewalk Shed
X00886610-I1-SH
05/16/2025
Objection raised — Other
05/09/2025
Filed — Alteration
Propose removals of existing, baseboard, hydronic heating supply and return, and boilers and associated piping. Install condensate pumps, PTHP and electric heater as per plan, filed in conjunction with GC and PL # X01177107-I1 and S1.
X01177107-I1
05/09/2025
Special inspection requirement — Exterior lighting power
MINA HANNA
05/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
05/09/2025
Special inspection requirement — Interior lighting power
MINA HANNA
05/09/2025
Special inspection requirement — Fenestration air leakage
MINA HANNA
05/09/2025
Special inspection requirement — Lighting controls
MINA HANNA
04/08/2025
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
04/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
MINA HANNA
04/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
MINA HANNA
04/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
04/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
04/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
MINA HANNA
04/08/2025
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
04/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MINA HANNA
04/07/2025
Special inspection requirement — Final
MINA HANNA
04/07/2025
Special inspection requirement — Mechanical Systems
MINA HANNA
Latest 60 of 118 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK EQUITY FUND 2004 LLC203/22/2026
URC303/22/2026
THE OWNER OF103/22/2026
URCURC103/22/2026
DELIGHT CONSTRUCTION303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOEL PHAGOO P.E. PLLC106/24/2026
ROSENTHAL ENGINEERING PLLC311/25/2025
STAT ARCHITECTURE PC105/09/2025
KZ ENGINEERING, P.C106/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING803/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CS BRIDGE CORPGeneral Contractor607/08/2026
NOTIAS CONSTRUCTION INCGeneral Contractor407/28/2026
AKM CONSTRUCTION NY CORPGeneral Contractor209/30/2026
AMERICAN STANDARD P&H CORORP.Plumbing207/08/2026
PANDELI GJINIElectrical103/21/2026
PAUL OLSENElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONCRETE SOLUTIONS LAB CO5344305/27/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedAKM CONSTRUCTION NY CORP09/29/2026
DOB NOWSuspended ScaffoldPermit IssuedPREMIER CONSTRUCTION INC09/15/2026
DOB NOWMechanical SystemsPermit IssuedNOTIAS CONSTRUCTION INC07/27/2026
DOB NOWGeneral ConstructionPermit IssuedNOTIAS CONSTRUCTION INC07/27/2026
DOB NOWSidewalk ShedPermit IssuedAKM CONSTRUCTION NY CORP06/25/2026
DOB NOWBoiler EquipmentPermit IssuedAMERICAN STANDARD P&H CORORP.05/22/2026
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.05/22/2026
DOB NOWMechanical SystemsPermit IssuedNOTIAS CONSTRUCTION INC05/15/2026
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP05/13/2026
DOB NOWGeneral ConstructionPermit IssuedNOTIAS CONSTRUCTION INC05/12/2026
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP05/22/2025
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP06/07/2024
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP06/10/2023
BISPLISSUEDEXCELLENCE IN PLUMBING06/01/2005
BISSPISSUEDEXCELLENCE IN PLUMBING05/18/2005
BISBLISSUEDEXCELLENCE IN PLUMBING04/20/2005
BIS—ISSUEDDELIGHT CONSTRUCTION CORP.03/22/2005
BIS—ISSUEDDELIGHT CONSTRUCTION CORP.04/07/2004
BISPLISSUEDEXCELLENCE IN PLUMBING03/18/2004
BISEQISSUEDDELIGHT CONSRTUCTION CORP.02/04/2004
BIS—ISSUEDDELIGHT CONSTRUCTION CORP.12/17/2003
BISOTISSUEDAMARTAL CONSTRUCTION CO INC06/20/2001
BISOTISSUEDABCO CONSTRUCTION NY INC03/22/2000
BISEQISSUEDYORI SCAFFOLDING EQUIPMENT CORP.04/23/1996
BISFSISSUEDBROOK FUEL OIL CORP.05/28/1991
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
11/24/2025HVAC-R and service water piping design and insulationMINA HANNAenergy_progress
11/24/2025HVAC-R and service water heating system controlsMINA HANNAenergy_progress
11/24/2025HVAC-R and service water heating equipmentMINA HANNAenergy_progress
11/11/2025Fire-Resistant Penetrations and JointsMINA HANNAspecial
11/11/2025Energy Code Compliance InspectionsMINA HANNAprogress
09/11/2025Insulation placement and R valuesMINA HANNAenergy_progress
09/11/2025Tenant Protection Plan ComplianceMINA HANNAspecial
05/23/2025HVAC-R and service water heating equipmentMINA HANNAenergy_progress
05/23/2025HVAC-R and service water heating system controlsMINA HANNAenergy_progress
05/23/2025Maintenance informationMINA HANNAenergy_progress
05/23/2025HVAC-R and service water piping design and insulationMINA HANNAenergy_progress
05/23/2025Shutoff dampersMINA HANNAenergy_progress
05/09/2025Exterior lighting powerMINA HANNAenergy_progress
05/09/2025Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
05/09/2025Interior lighting powerMINA HANNAenergy_progress
05/09/2025Fenestration air leakageMINA HANNAenergy_progress
05/09/2025Lighting controlsMINA HANNAenergy_progress
04/08/2025Energy Code Compliance InspectionsMINA HANNAprogress
04/08/2025HVAC-R and service water heating equipmentMINA HANNAenergy_progress
04/08/2025HVAC-R and service water heating system controlsMINA HANNAenergy_progress
04/08/2025Fire-Resistant Penetrations and JointsMINA HANNAspecial
04/08/2025Fire-Resistant Penetrations and JointsMINA HANNAspecial
04/08/2025Tenant Protection Plan ComplianceMINA HANNAspecial
04/08/2025Energy Code Compliance InspectionsMINA HANNAprogress
04/08/2025HVAC-R and service water piping design and insulationMINA HANNAenergy_progress
Latest 25 of 28.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/23/2026X00886610-I1Request digital key ↗
08/19/2026X01177107-S1Request digital key ↗
08/19/2026X01177107-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications31
▸DOB NOWProgress Inspector Seal & Signature20
09/06/2026X01177107-I1Open ↗
09/06/2026X01177107-I1Open ↗
09/06/2026X01177107-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026X00886610-I1Open ↗
08/19/2026X01177107-S1Open ↗
08/19/2026X01177107-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026X01177107-S1Open ↗
09/01/2026X01177107-I1Open ↗
09/01/2026X01177107-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/19/2026X01177107-S3Open ↗
08/19/2026X01177107-I1Open ↗
08/19/2026X01177107-S2Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026X01177107-I1Open ↗
08/13/2026X01177107-S1Open ↗
08/13/2026X01177107-S2Open ↗
Showing 3 of 4 on file for this type