Boulevard Houses
829 SCHENCK AVENUE · East New York-New Lots · BIN 3324295
💬 Discuss this project
1953Year Built
6Stories
D3Building Class
R5Zoning
380,300 sfGross Floor Area
744Units
LL97 CoveredRent Stabilized107 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: BOULEVARD TOGETHER OWNER LLC · 517,750 sf lot · 0.73 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof53p · 5 filings · 20 docs
Floor 1447p · 1 filing · 20 docs
Floor 1347p · 1 filing · 20 docs
Floor 1247p · 1 filing · 20 docs
Floor 1147p · 1 filing · 20 docs
Floor 1047p · 1 filing · 20 docs
Floor 947p · 1 filing · 20 docs
Floor 847p · 1 filing · 20 docs
Floor 747p · 1 filing · 20 docs
Floor 647p · 1 filing · 20 docs
Floor 547p · 1 filing · 20 docs
Floor 447p · 1 filing · 20 docs
Floor 347p · 1 filing · 20 docs
Floor 247p · 1 filing · 20 docs
Floor 15p · 2 filings · 20 docs
Cellar54p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY4409/01/2026
BOULEVARD TOGETHER DEVELOPER1503/22/2026
BOULEVARD TOGETHER OWNER LLC203/22/2026
NYC HOUSING AUTHORITY1603/22/2026
NYCHA 99603/22/2026
HUDSON103/22/2026
NYCHA503/21/2026
NY HOUSING AUTHORITY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EP ENGINEERING LLC705/12/2026
PETER CLEMENTS ARCHITECT705/02/2025
PAUL PERDEK, PROF. ENG. PLLC107/26/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BETRO DESIGN GROUP1303/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BROADWAY BUILDERS LLCGeneral Contractor2807/08/2026
BLETSAS PLBNG & HTG CORPPlumbing507/08/2026
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor403/21/2026
SUTTON, ALEXElectrical203/21/2026
ATHANASIOS GIALABOUKISElectrical203/21/2026
COLE, VINCENTElectrical203/21/2026
ANTHONY COSCHIGANO IIIElectrical103/21/2026
SUPERIOR PLUMBING & HEATINGPlumbing106/28/2026
FRANK, SEYMOURElectrical103/21/2026
JOSE TEJADAElectrical103/21/2026
R.C.M. ELECTRIC CORP.Electrical103/22/2026
ROBERT MARCHISOTTOElectrical103/21/2026
THANASI ELECTRICAL, LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EP INSPECTIONS AND COMMIS70791205/12/2026
AMARACON TESTING & INSPEC5842305/02/2025
Building Lifecycle
All (176)Filed (17)Permit Issued (28)Signed Off (7)Facade (FISP) (13)Violation (60)Inspection (7)Objection (14)Special Inspection (30)
08/12/2026
Violation issued (HPD, open)
C
08/12/2026
Violation issued (HPD, open)
C
07/27/2026
Violation issued (HPD, open)
C
07/27/2026
Violation issued (HPD, open)
C
07/27/2026
Violation issued (HPD, closed)
B
07/27/2026
Violation issued (HPD, open)
A
07/27/2026
Violation issued (HPD, open)
B
07/27/2026
Violation issued (HPD, open)
B
06/10/2026
Violation issued (HPD, open)
A
06/10/2026
Violation issued (HPD, open)
C
06/10/2026
Violation issued (HPD, open)
C
06/10/2026
Violation issued (HPD, open)
A
05/18/2026
Violation issued (HPD, open)
B
05/18/2026
Violation issued (HPD, closed)
B
05/18/2026
Violation issued (HPD, open)
C
05/18/2026
Violation issued (HPD, open)
A
05/12/2026
Filed — Alteration
REPLACEMENT OF ALL BATHROOM, KITCHEN FIXTURES, SLOP SINK IN JANITORS CLOSET AND ROOF DRAINS WITHIN EXISTING LOCATION. NEW PLUMBING FIXTURES AT CELLAR AS PER PLANS FILED.
B00539096-P3
02/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Burgess
02/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Burgess
02/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
02/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Burgess
02/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
12/17/2025
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
B01205071-I1
12/09/2025
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
12/03/2025
Violation issued (FDNY_ORDER, closed)
11/16/2025
Violation issued (HPD, open)
A
11/16/2025
Violation issued (HPD, closed)
A
11/16/2025
Violation issued (HPD, closed)
B
11/16/2025
Violation issued (HPD, open)
C
11/14/2025
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
10/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/20/2025
Violation issued (HPD, closed)
B
10/20/2025
Violation issued (HPD, open)
C
10/20/2025
Violation issued (HPD, open)
C
10/20/2025
Violation issued (HPD, open)
B
10/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/02/2025
Signed off — Alteration
REPLACE ALL EXISTING ROOF EXHAUST FANS, INSTALL NEW LOUVER AND CEILING EXHAUST FAN AT RECYCLE CLOSET AT FIRST FLOOR, INSTALL NEW RADIATOR COVERS AND REPLACE EXISTING GRILLE AS PER PLANS FILED.
B00539278-I1
09/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
09/25/2025
Special inspection requirement — Shutoff dampers
Christopher Burgess
09/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Burgess
09/25/2025
Special inspection requirement — Maintenance information
Christopher Burgess
09/25/2025
Special inspection requirement — Mechanical Systems
Christopher Burgess
09/25/2025
Special inspection requirement — Duct leakage testing, insulation and design
Christopher Burgess
09/25/2025
Special inspection requirement — Final
Christopher Burgess
09/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Burgess
09/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
09/18/2025
Filed — Alteration
REPLACE ALL EXISTING ROOF EXHAUST FANS, INSTALL NEW LOUVER AND CEILING EXHAUST FAN AT RECYCLE CLOSET AT FIRST FLOOR, INSTALL NEW RADIATOR COVERS AND REPLACE EXISTING GRILLE AS PER PLANS FILED.
B00539278-P2
09/04/2025
Violation issued (HPD, closed)
C
08/21/2025
Signed off — Alteration
B00539254-I1
07/22/2025
Violation issued (HPD, closed)
B
06/26/2025
Violation issued (HPD, closed)
C
06/10/2025
Cycle 10 facade report submitted
06/10/2025
Cycle 10 facade report signed — SAFE
06/05/2025
Violation issued (HPD, closed)
B
05/28/2025
Cycle 10 facade inspection completed
05/06/2025
Permit issued — Plumbing
B00539096-I1-PL
05/02/2025
Filed — Alteration
B00539254-P2
05/02/2025
Signed off — Alteration
MINOR PARTITION CHANGES FOR TEMPORARY COMBINATIONS OF UNITS 12E & 12F TO ACCOMODATE A LARGER FAMILY UNIT WHILE UNDERGOING BUILDING REHABILITATION UNDER JOB # B00539254 - SEE COMMENTS FOR DETAILS
B00856781-I1
04/23/2025
Special inspection requirement — Insulation placement and R values
Christopher Burgess
04/23/2025
Special inspection requirement — Fenestration air leakage
Christopher Burgess
Latest 60 of 176 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedSUPERIOR PLUMBING & HEATI05/06/2025
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTUAL PRESV SYSTEM04/15/2025
DOB NOWGeneral ConstructionSigned-offBROADWAY BUILDERS LLC08/08/2024
DOB NOWStructuralSigned-offBROADWAY BUILDERS LLC08/06/2024
DOB NOWStructuralSigned-offBROADWAY BUILDERS LLC08/05/2024
DOB NOWMechanical SystemsSigned-offBROADWAY BUILDERS LLC08/05/2024
DOB NOWPlumbingPermit IssuedBLETSAS PLBNG & HTG CORP05/16/2024
DOB NOWSuspended ScaffoldSigned-offSKYLINE RESTORATION INC02/28/2024
DOB NOWGeneral ConstructionSigned-offBROADWAY BUILDERS LLC08/29/2023
DOB NOWStructuralSigned-offBROADWAY BUILDERS LLC08/11/2023
DOB NOWStructuralSigned-offBROADWAY BUILDERS LLC08/11/2023
DOB NOWMechanical SystemsSigned-offBROADWAY BUILDERS LLC08/11/2023
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL07/25/2023
DOB NOWGeneral ConstructionSigned-offBROADWAY BUILDERS LLC07/12/2023
DOB NOWPlumbingPermit IssuedBLETSAS PLBNG & HTG CORP03/01/2023
DOB NOWGeneral ConstructionSigned-offBROADWAY BUILDERS LLC08/31/2022
DOB NOWStructuralSigned-offBROADWAY BUILDERS LLC08/11/2022
DOB NOWMechanical SystemsSigned-offBROADWAY BUILDERS LLC08/11/2022
DOB NOWGeneral ConstructionSigned-offBROADWAY BUILDERS LLC08/11/2022
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL07/27/2022
DOB NOWStructuralSigned-offBROADWAY BUILDERS LLC05/31/2022
DOB NOWMechanical SystemsSigned-offBROADWAY BUILDERS LLC05/31/2022
DOB NOWStructuralSigned-offBROADWAY BUILDERS LLC05/31/2022
DOB NOWPlumbingPermit IssuedBLETSAS PLBNG & HTG CORP02/23/2022
DOB NOWStructuralSigned-offBROADWAY BUILDERS LLC02/09/2022
DOB NOWGeneral ConstructionSigned-offBROADWAY BUILDERS LLC02/09/2022
DOB NOWStructuralSigned-offBROADWAY BUILDERS LLC02/09/2022
DOB NOWMechanical SystemsSigned-offBROADWAY BUILDERS LLC02/09/2022
BISOTISSUEDNEELAM CONSTRUCTION CORP09/14/2015
BISEQISSUEDNEELAM CONSTRUCTION CORP05/04/2015
BISEQISSUEDSKYWORX CONTRACTING INC04/13/2015
BISEQISSUEDTWIN & SWING SCAFFOLDING03/04/2011
BISEQISSUEDTWIN & SWING SCAFFOLDING03/04/2011
BISOTISSUEDSTONEWALL CONTRACTING COR03/03/2011
BISPLISSUEDPERFORMANCE PLUMBING01/16/2007
BISEQISSUEDMBR CONTRACTING, INC.09/28/2006
BISEQISSUEDMBR CONTRACTING, INC.05/10/2006
BISPLISSUEDV. C. VITANZA SONS INC12/01/2003
BISEQISSUEDPHOENIX CONSTRUCTION06/02/2000
1 project · most recent 05/12/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/12/2026Permit IssuedSUPERIOR PLUMBING & HEATIGas, Water/Sanitary
7 projects · most recent 04/28/2026
General Wiring
FiledStatusContractorScope
04/28/2026CompleteR.C.M. ELECTRIC CORP.—
04/15/2026CompleteECNY ELEC'L CONTR'S, INCGeneral Wiring
09/18/2025Permit IssuedTHANASI ELECTRICAL, LLCGeneral Wiring
08/08/2022CompleteJTE ELECTRICAL SERVICES—
07/12/2022CompleteGPN ELECTRIC CORP—
05/19/2022CompleteOPTIMAL ELECTRIC, INC—
04/14/2022CompleteR.C.M. ELECTRIC CORP.—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/09/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
11/14/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
10/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/05/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
05/31/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/31/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
02/12/2026Energy Code Compliance InspectionsChristopher Burgessprogress
02/12/2026Fire-Resistant Penetrations and JointsChristopher Burgessspecial
02/12/2026HVAC-R and service water heating system controlsChristopher Burgessenergy_progress
02/12/2026HVAC-R and service water heating equipmentChristopher Burgessenergy_progress
02/12/2026HVAC-R and service water piping design and insulationChristopher Burgessenergy_progress
09/25/2025HVAC-R and service water heating system controlsChristopher Burgessenergy_progress
09/25/2025Energy Code Compliance InspectionsChristopher Burgessprogress
09/25/2025FinalChristopher Burgessprogress
09/25/2025Mechanical SystemsChristopher Burgessspecial
09/25/2025Fire-Resistant Penetrations and JointsChristopher Burgessspecial
09/25/2025Duct leakage testing, insulation and designChristopher Burgessenergy_progress
09/25/2025Maintenance informationChristopher Burgessenergy_progress
09/25/2025HVAC-R and service water heating equipmentChristopher Burgessenergy_progress
09/25/2025Shutoff dampersChristopher Burgessenergy_progress
04/23/2025Fire-Resistance Rated ConstructionChristopher Burgessprogress
04/23/2025Fenestration and door U-factor and product ratingsChristopher Burgessenergy_progress
04/23/2025Insulation placement and R valuesChristopher Burgessenergy_progress
04/23/2025Fenestration air leakageChristopher Burgessenergy_progress
04/23/2025Lighting in dwelling unitsChristopher Burgessenergy_progress
04/23/2025Fire-Resistant Penetrations and JointsChristopher Burgessspecial
04/23/2025MasonryCONNIE PISANIspecial
04/23/2025Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
04/23/2025Structural Steel - DetailsCONNIE PISANIspecial
04/23/2025Energy Code Compliance InspectionsChristopher Burgessprogress
04/23/2025FinalChristopher Burgessprogress
Latest 25 of 63.
▾Documents — 187 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
09/01/2026B00539254-P1Request digital key ↗
09/01/2026B00539254-P2Request digital key ↗
09/01/2026B00539254-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION10
12/15/2021302088657Open ↗
11/16/2021340237345Open ↗
09/13/2015340292481Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION6
09/13/2015340292481Open ↗
05/03/2015340237354Open ↗
04/13/2015340240876Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications75
▸DOB NOWProgress Inspector Seal & Signature28
09/02/2026B00539278-P1Open ↗
09/02/2026B00539278-P1Open ↗
09/01/2026B00539255-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/01/2026B00539254-P2Open ↗
09/01/2026B00539254-P1Open ↗
09/01/2026B00539254-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026B00539278-P1Open ↗
08/31/2026B00539254-P2Open ↗
08/31/2026B00539254-P2Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
03/28/2016340292481Open ↗
02/27/2016340240876Open ↗
02/27/2016340240876Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
09/13/2015340292481Open ↗
05/05/2015340237345Open ↗
05/03/2015340237354Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
09/13/2015340292481Open ↗
05/05/2015340237345Open ↗
05/03/2015340237354Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
09/13/2015340292481Open ↗
05/05/2015340237345Open ↗
05/03/2015340237354Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
03/11/2011320277017Open ↗
03/07/2011320276973Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/11/2011320277017Open ↗
03/07/2011320276973Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/01/2026B00539254-P2Open ↗
09/01/2026B00539254-I1Open ↗
09/01/2026B00539254-P1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
03/11/2011320277017Open ↗
03/07/2011320276973Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/13/2015340292481Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
05/05/2015340237345Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
10/28/2011320165628Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/01/2026B00539255-I1Open ↗
▸Energy Compliance9
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00539255-I1Open ↗
08/13/2026B00539278-I1Open ↗
08/13/2026B00539254-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/13/2015340292481Open ↗
05/05/2015340237345Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/13/2015340292481Open ↗
05/05/2015340237345Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/28/2016340292481Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/28/2016340292481Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
12/08/2021301029786Open ↗
12/08/2021301029786Open ↗
09/13/2015340292481Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs28
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
09/01/2026B00539254-P2Open ↗
09/01/2026B00539254-P1Open ↗
09/01/2026B00539254-I1Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
12/13/2021301029786Open ↗
03/28/2016340292481Open ↗
02/27/2016340240876Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/13/2026B00539255-I1Open ↗
08/13/2026B00539254-I1Open ↗
08/13/2026B00539096-I1Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
03/11/2011320277017Open ↗
03/07/2011320276973Open ↗
05/20/2010320165628Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/07/2011320165628Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
03/28/2016340292481Open ↗
09/13/2015340292481Open ↗
05/05/2015340237345Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms8
▸BISEFILING JOB APPLICATION COVER SHEET4
09/13/2015340292481Open ↗
05/05/2015340237345Open ↗
05/03/2015340237354Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
03/11/2011320277017Open ↗
03/07/2011320276973Open ↗
05/20/2010320165628Open ↗
▸BISADDITIONAL INFORMATION1
05/02/2011320276973Open ↗
▸Other Documents5
▸BISSupporting Document: Fee Exempt2
12/06/2021302088657Open ↗
12/02/2021301029786Open ↗
▸DOB NOWIRA Certification1
08/13/2026B01205071-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01011933-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01011933-I1Open ↗