← Back
Single or multiple dwelling with stores or offices
765 STERLING PLACE
BROOKLYN · BIN 3031476
💬 Discuss this project
1910Year Built
3Stories
S9Building Class
R6AZoning
4,000 sfGross Floor Area
6Units
Rent Stabilized16 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · 1,900 sf lot · 2.11 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGSTON CAFE LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BOLT ARCHITECTURE, PLLC202/09/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COMMON BUILDERS INCGeneral Contractor303/21/2026
COLE ELECTRIC CORP.Electrical103/22/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BOLTARCHITECTURE,PLLC6712202/09/2023
SOCOTEC ENGINEERING4983202/09/2023
Building Lifecycle
All (48)Filed (2)Permit Issued (2)Signed Off (2)Violation (34)Inspection (2)Special Inspection (6)
05/08/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/13/2025
Violation issued (HPD, open)
A
11/27/2024
Violation issued (HPD, closed)
I
04/16/2024
Violation issued (HPD, open)
A
11/20/2023
Violation issued (HPD, closed)
I
04/20/2023
Signed off — Alteration
INTERIOR RENOVATIONS TO EXIST RETAIL STORE AT FIRST FLOOR. RENOVATIONS TO INCLUDE NEW NON-LOAD BEARING PARTITIONS AND NEW FINISHES. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
B00825666-I1
04/18/2023
Signed off — Alteration
PLUMBING RENOVATION TO EXIST STORE AT FIRST FLOOR. RENOVATION INCLUDES THE RELOCATION OF EXISTING FIXTURES AND PROPOSED NEW FIXTURES. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
B00826334-I1
04/11/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/05/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/30/2023
Violation issued (HPD, open)
A
03/24/2023
Permit issued — Plumbing
B00826334-I1-PL
03/24/2023
Permit issued — General Construction
B00825666-I1-GC
02/09/2023
Filed — Alteration
INTERIOR RENOVATIONS TO EXIST RETAIL STORE AT FIRST FLOOR. RENOVATIONS TO INCLUDE NEW NON-LOAD BEARING PARTITIONS AND NEW FINISHES. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
B00825666-I1
02/09/2023
Filed — Alteration
PLUMBING RENOVATION TO EXIST STORE AT FIRST FLOOR. RENOVATION INCLUDES THE RELOCATION OF EXISTING FIXTURES AND PROPOSED NEW FIXTURES. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
B00826334-I1
02/09/2023
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
02/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROMERO CHAMBERS JR
02/09/2023
Special inspection requirement — Final
ROMERO CHAMBERS JR
02/09/2023
Special inspection requirement — Interior lighting power
ROMERO CHAMBERS JR
02/09/2023
Special inspection requirement — Fenestration air leakage
ROMERO CHAMBERS JR
02/09/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
ROMERO CHAMBERS JR
11/09/2022
Violation issued (HPD, closed)
I
03/09/2022
Violation issued (HPD, open)
A
03/09/2022
Violation issued (HPD, closed)
I
04/19/2021
Violation issued (HPD, closed)
I
04/19/2021
Violation issued (HPD, open)
A
11/04/2019
Violation issued (HPD, closed)
I
10/25/2018
Violation issued (HPD, closed)
I
12/07/2017
Violation issued (HPD, closed)
I
11/25/2016
Violation issued (HPD, closed)
I
10/19/2015
Violation issued (HPD, closed)
I
03/03/2015
Violation issued (HPD, closed)
I
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/13/2004
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT03/24/2023
DOB NOWGeneral ConstructionSigned-offCOMMON BUILDERS INC03/24/2023
BISEQRE-ISSUEDROYAL HOME IMPROVEMENT10/02/1992
BIS—ISSUEDROYAL HOME IMPROVEMENT10/01/1992
1 project · most recent 02/08/2023
General Wiring
FiledStatusContractorScope
02/08/2023Permit IssuedCOLE ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
02/09/2023Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
02/09/2023Fire-Resistant Penetrations and JointsROMERO CHAMBERS JRspecial
02/09/2023FinalROMERO CHAMBERS JRprogress
02/09/2023Interior lighting powerROMERO CHAMBERS JRenergy_progress
02/09/2023Fenestration air leakageROMERO CHAMBERS JRenergy_progress
02/09/2023Fenestration and door U-factor and product ratingsROMERO CHAMBERS JRenergy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026B00826334-I1Request digital key ↗
08/27/2026B00825666-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B00825666-I1Open ↗
09/01/2026B00825666-I1Open ↗
09/01/2026B00825666-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026B00825666-I1Open ↗
08/13/2026B00826334-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B00825666-I1Open ↗
09/01/2026B00825666-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026B00825666-I1Open ↗
08/13/2026B00826334-I1Open ↗