Elevator apt, semi-fireproof without stores
Van Dyke I (NYCHA)
766 BLAKE AVENUE · BIN 3328042
💬 Discuss this project
1958Year Built
14Stories
D1Building Class
R6Zoning
451,586 sfGross Floor Area
525Units
LL97 Covered8 Open Violations 6 unresolved · 2 paperwork only ▸FISP: UNSAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 305,266 sf lot · 1.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction2 filings · 20 docs
BulkheadUnder Construction1p · 1 filing · 16 docs
Floor 12p · 1 filing · 20 docs
CellarUnder Construction8p · 2 filings · 20 docs
2 jobs · most recent 05/26/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/26/2026Signed-offKORDUN CONSTRUCTION CORPGas, Water/Sanitary
07/24/2025Signed-offD.D.S. MECH PBG&HTG CORPGas
9 jobs · most recent 01/15/2026
General Wiring
FiledStatusContractorScope
01/15/2026Permit IssuedAUJLA ELECTRIC CORP—
04/26/2024CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
06/23/2023Permit IssuedMECO ELECTRIC CO. INC.General Wiring
04/25/2021CompleteCITY GRID ELECTRIC CORPGeneral Wiring
11/25/2019Permit IssuedRAIDEN ELECTRIC LLC—
01/02/2019CompleteZENA ELECTRIC INCGeneral Wiring
08/16/2018CompleteJEMCO ELECT. CONTRS INCGeneral Wiring
07/25/2018CompleteZENA ELECTRIC INC—
04/12/2018CompleteEIA ELECTRIC, INCGeneral Wiring
1 job · most recent 07/06/2021
Concrete
FiledStatusContractorScope
07/06/2021Permit IssuedKORDUN CONSTRUCTION CORPConcrete
3 jobs · most recent 07/20/2026
Sidewalk Shed Scaffold Fence
FiledStatusContractorScope
07/20/2026Permit IssuedJ & N CONSTRUCTION GROUPSidewalk Shed
06/06/2025Permit IssuedJ & N CONSTRUCTION GROUPScaffold
09/09/2024Permit IssuedJ & N CONSTRUCTION GROUPFence
2 jobs · most recent 09/28/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
09/28/2025Permit Issued—Suspended Scaffold (SC)
03/25/2025Permit IssuedJ&N CONSTRUCTION GRP CORPSuspended Scaffold (SC)
Building Lifecycle
All (176)Filed (26)Permit Issued (41)Signed Off (7)Facade (FISP) (19)Violation (19)Inspection (6)Objection (28)Special Inspection (30)
08/31/2026
Signed off — Alteration
B00462728-I1
08/13/2026
Signed off — Alteration
B00456662-I1
08/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
08/07/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
08/07/2026
Special inspection requirement — Masonry
ALEXIS SCHLESSINGERMAN
08/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
07/27/2026
Permit issued — Sidewalk Shed
B01046262-I1-SH
07/20/2026
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 370 BLAKE AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01046262-P1
07/10/2026
Objection resolved — Resolved
06/30/2026
Objection resolved — Addressed
06/09/2026
Permit issued — Supported Scaffold
B01237726-I1-SF
06/08/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/29/2026
Objection raised — Cost
05/27/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
05/26/2026
Filed — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00463348-P2
05/21/2026
Permit issued — General Construction
B00456662-I1-GC
05/14/2026
Signed off — Alteration
REMOVE AND REPLACE ALL GAS PIPING THROUGHOUT BUILDING INCLUDING RISER AND METERS. EXISTING GAS SERVICE TO REMAIN.
B08025779-I1
05/12/2026
Objection raised — Other
04/30/2026
Filed — Alteration
Facade restoration at Van Dyke #11 to comply with LL 11/98, cycle 9 report. No change in use, egress or occupancy.
B01133028-P1
04/30/2026
Special inspection requirement — Masonry
ALEXIS SCHLESSINGERMAN
04/30/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
04/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
04/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
04/23/2026
Permit issued — Sidewalk Shed
B01046262-I1-SH
04/23/2026
Permit issued — General Construction
B00784104-I1-GC
04/01/2026
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
03/25/2026
Permit issued — Suspended Scaffold
B01198430-I1-SC
03/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/25/2026
Signed off — Alteration
B01049248-I1
02/17/2026
Permit issued — General Construction
B01133028-I1-GC
02/03/2026
Permit issued — Plumbing
B00463348-I1-PL
11/14/2025
Cycle 10 facade report submitted
11/14/2025
Cycle 10 facade report signed — UNSAFE
10/30/2025
Permit issued — Construction Fence
B01107919-I1-FN
10/16/2025
Cycle 10 facade inspection completed
09/28/2025
Filed — Alteration
SUSPENDED SCAFOLD OUTRIGGER SYSTEM AND MATERIAL HOIST SYSTEM FOR ROOF REPAIRS, REPLACEMENT AND FACADE RESTORATION WORKS. SUSPENDED SCAFFOLD AND MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPA
B01113379-P1
08/08/2025
Permit issued — Plumbing
B08025779-I1-PL
07/29/2025
Special inspection requirement — Post-installed Anchors
IBRAHIM MOURAD
07/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
07/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
IBRAHIM MOURAD
07/24/2025
Filed — Alteration
REMOVE AND REPLACE ALL GAS PIPING THROUGHOUT BUILDING INCLUDING RISER AND METERS. EXISTING GAS SERVICE TO REMAIN.
B08025779-P3
07/22/2025
Permit issued — Structural
B00460588-I1-ST
07/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
07/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/18/2025
Special inspection requirement — Post-installed Anchors
IBRAHIM MOURAD
07/15/2025
Violation issued (FDNY_NOV, closed)
07/02/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/20/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
06/09/2025
Permit issued — Supported Scaffold
B01237726-I1-SF
06/09/2025
Objection resolved — Addressed
06/06/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01237726-I1
06/06/2025
Objection raised — Scope
06/06/2025
Objection raised — Scope
06/06/2025
Objection raised — Scope
06/06/2025
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
06/05/2025
Filed — Alteration
REMOVE AND REPLACE ALL GAS PIPING THROUGHOUT BUILDING INCLUDING RISER AND METERS. EXISTING GAS SERVICE TO REMAIN.
B08025779-P2
04/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Latest 60 of 176 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA6209/13/2026
NEW YORK CITY HOUSING AUTHORITY1307/08/2026
NYCHA 99503/22/2026
NYC HOUSING AUTHORITY1003/21/2026
TECHNICO CONST SERVICES103/21/2026
ZORIA HOUSING403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS503/21/2026
AK CONSULTING SERVICES403/21/2026
AE DESIGN SOLUTION203/21/2026
NERIS403/21/2026
JOEL PHAGOO P.E. PLLC103/21/2026
SYNERGY STRATEGIC DESIGN ARCHITECTS103/21/2026
JOEL PHAGOO P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROMA SCAFFOLDING INCGeneral Contractor2707/08/2026
J & N CONSTRUCTION GROUPGeneral Contractor1707/28/2026
KORDUN CONSTRUCTION CORPGeneral Contractor1407/08/2026
KORDUN CONSTRUCTION CORPPlumbing307/08/2026
IRVING BAPTISTEElectrical103/21/2026
ORTEGA-CEDENO, DAVIDElectrical103/21/2026
ABE HIMELFARBElectrical103/21/2026
ROBERT SPALLINOElectrical103/21/2026
D.D.S. MECH PBG&HTG CORPPlumbing105/15/2026
PHILLIPS, WENDELLElectrical103/21/2026
AUJLA ELECTRIC CORPElectrical103/22/2026
CHRYSSIADIS, NICOLASElectrical103/21/2026
IOVINE, MICHAELElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983204/30/2026
RI CONSULTING SERVICES IN8904209/28/2025
BUREAU VERITAS NA6902507/24/2025
JOEL PHAGOO ,PE, PLLC2416206/06/2025
MP ENGINEERS & ARCHITECTS1438308/13/2024
LEO Y LEE ASSOCIATES2481102/20/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP07/27/2026
DOB NOWSupported ScaffoldPermit IssuedJ & N CONSTRUCTION GROUP06/09/2026
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP05/21/2026
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP04/23/2026
DOB NOWGeneral ConstructionPermit IssuedJ & N CONSTRUCTION GROUP04/23/2026
DOB NOWSuspended ScaffoldPermit IssuedJ&N CONSTRUCTION GRP CORP03/25/2026
DOB NOWGeneral ConstructionPermit IssuedJ & N CONSTRUCTION GROUP02/17/2026
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP02/03/2026
DOB NOWConstruction FencePermit IssuedJ & N CONSTRUCTION GROUP10/30/2025
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP08/08/2025
DOB NOWStructuralPermit IssuedKORDUN CONSTRUCTION CORP07/22/2025
DOB NOWSupported ScaffoldPermit IssuedJ & N CONSTRUCTION GROUP06/09/2025
DOB NOWGeneral ConstructionPermit IssuedJ & N CONSTRUCTION GROUP04/28/2025
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP04/24/2025
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP04/10/2025
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP04/10/2025
DOB NOWSuspended ScaffoldPermit IssuedJ&N CONSTRUCTION GRP CORP03/27/2025
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP01/29/2025
DOB NOWGeneral ConstructionPermit IssuedJ & N CONSTRUCTION GROUP01/24/2025
DOB NOWSuspended ScaffoldPermit IssuedJ&N CONSTRUCTION GRP CORP10/07/2024
DOB NOWConstruction FencePermit IssuedJ & N CONSTRUCTION GROUP09/13/2024
DOB NOWStructuralPermit IssuedKORDUN CONSTRUCTION CORP07/22/2024
DOB NOWSupported ScaffoldSigned-offJ & N CONSTRUCTION GROUP05/15/2024
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP05/08/2024
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP04/04/2024
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP04/04/2024
DOB NOWSuspended ScaffoldSigned-offSKYLINE RESTORATION INC02/27/2024
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC01/19/2024
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC12/04/2023
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP12/04/2023
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP12/04/2023
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP12/04/2023
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC01/24/2023
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC12/21/2022
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC02/04/2022
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC12/08/2021
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC02/04/2021
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC12/03/2020
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC12/03/2020
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC12/04/2019
+ 23 more permits on file
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/27/2026Fail-Final CND-Occupancy InspectionFailView ↗
04/01/2026Pass-Final PL - More than 10 Requested FloorsPassView ↗
03/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/02/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
08/07/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
08/07/2026FinalALEXIS SCHLESSINGERMANprogress
08/07/2026MasonryALEXIS SCHLESSINGERMANspecial
08/07/2026Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
04/30/2026MasonryALEXIS SCHLESSINGERMANspecial
04/30/2026FinalALEXIS SCHLESSINGERMANprogress
04/30/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
04/30/2026Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
07/29/2025Post-installed AnchorsIBRAHIM MOURADspecial
07/29/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
07/29/2025Tenant Protection Plan ComplianceIBRAHIM MOURADspecial
07/18/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
07/18/2025Tenant Protection Plan Compliance—special
07/18/2025Post-installed AnchorsIBRAHIM MOURADspecial
06/06/2025Post-installed AnchorsJOEL PHAGOOspecial
04/30/2025Tenant Protection Plan Compliance—special
04/30/2025Fire-Resistant Penetrations and Joints—special
04/30/2025Post-installed Anchors—special
03/20/2025Post-installed AnchorsJOEL PHAGOOspecial
08/21/2024Post-installed AnchorsJAMES WILSONspecial
08/21/2024Structural Stability – Alterations of existing buildingsJAMES WILSONspecial
08/21/2024Fire-Resistant Penetrations and JointsJAMES WILSONspecial
08/21/2024MasonryJAMES WILSONspecial
08/21/2024Insulation placement and R valuesJAMES WILSONenergy_progress
06/14/2024MasonryJAMES WILSONspecial
Latest 25 of 34.
▾Documents — 251 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch18
08/27/2026B00784104-P1Request digital key ↗
08/27/2026B00784104-S1Request digital key ↗
08/27/2026B00784104-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/01/2026B00463348-I1Request digital key ↗
08/15/2026B00463348-P1Request digital key ↗
08/15/2026B00463348-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00273587-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00273527-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00456662-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/15/2026B00460588-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/01/2026B00462728-I1Request digital key ↗
▸Applications & Permits27
▸BISWORK PERMIT APPLICATION16
02/17/2017340312575Open ↗
10/22/2015340317669Open ↗
09/02/2015340272396Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
01/09/2017340312575Open ↗
09/07/2016340312575Open ↗
12/02/2015340312575Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications71
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/01/2026B00462728-I1Open ↗
09/01/2026B00456662-I1Open ↗
09/01/2026B00460588-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/18/2026B08025779-P3Open ↗
09/05/2026B08025779-I1Open ↗
09/05/2026B08025779-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
06/07/2017340312575Open ↗
10/06/2016340297556Open ↗
10/06/2016340297609Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
10/22/2015340317669Open ↗
08/28/2015340297609Open ↗
08/28/2015340297556Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
10/22/2015340317669Open ↗
08/28/2015340297609Open ↗
08/28/2015340297556Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
10/22/2015340317669Open ↗
08/28/2015340297609Open ↗
08/28/2015340297556Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/31/2026B01133028-P1Open ↗
08/29/2026B01133028-I1Open ↗
08/29/2026B00460588-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
02/27/2012320431984Open ↗
02/13/2012320428435Open ↗
05/23/2011320310533Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
02/27/2012320431984Open ↗
02/13/2012320428435Open ↗
05/23/2011320310533Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/02/2015340312575Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
08/13/2026B00273587-I1Open ↗
08/13/2026B00273527-I1Open ↗
▸Environmental & Asbestos12
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
06/07/2017340312575Open ↗
02/15/2017340312575Open ↗
08/28/2015340297609Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/01/2026B00462728-I1Open ↗
08/15/2026B00460588-I1Open ↗
08/13/2026B00463348-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/22/2026B08025779-P3Open ↗
08/22/2026B08025779-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/13/2015340272396Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
06/21/2016340272396Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
02/13/2012320428435Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/23/2011320310533Open ↗
▸Energy Compliance9
▸BISAS-BUILT ENERGY ANALYSIS2
06/07/2017340312575Open ↗
08/13/2013320428435Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/07/2016340312575Open ↗
12/02/2015340312575Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00462728-I1Open ↗
09/01/2026B00456662-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/07/2017340312575Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/28/2015340297556Open ↗
▸BISTECHNICAL REPORT: ENERGY1
02/13/2012320428435Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY6
12/02/2015340312575Open ↗
10/22/2015340317669Open ↗
08/28/2015340297609Open ↗
Showing 3 of 6 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
05/23/2015340264190Open ↗
▸Approvals, Objections & Sign-offs66
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter26
09/01/2026B00462728-I1Open ↗
09/01/2026B00456662-I1Open ↗
08/27/2026B00784104-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)14
08/15/2026B01133028-P1Open ↗
08/15/2026B00463348-P2Open ↗
08/13/2026B08025779-P2Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
06/07/2017340312575Open ↗
09/02/2015340272396Open ↗
09/02/2015340272396Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)7
09/01/2026B00462728-I1Open ↗
09/01/2026B00456662-I1Open ↗
09/01/2026B00463348-I1Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
06/07/2017340312575Open ↗
10/06/2016340297556Open ↗
10/06/2016340297609Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
02/27/2012320431984Open ↗
02/13/2012320428435Open ↗
05/23/2011320310533Open ↗
▸DOB NOWDEP Variance (V5) letter2
08/13/2026B00784104-I1Open ↗
08/13/2026B01133028-I1Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
06/07/2017340312575Open ↗
06/21/2016340272396Open ↗
12/02/2015340312575Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms12
▸BISEFILING JOB APPLICATION COVER SHEET6
12/02/2015340312575Open ↗
10/22/2015340317669Open ↗
08/28/2015340297609Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION3
03/20/2017340312575Open ↗
10/17/2016340312575Open ↗
07/07/2016340312575Open ↗
▸BISEFILING COVER SHEET3
02/27/2012320431984Open ↗
02/13/2012320428435Open ↗
05/23/2011320310533Open ↗
▸Other Documents13
▸DOB NOWManufacturer's Specifications4
08/13/2026B01198430-I1Open ↗
08/13/2026B01113379-P1Open ↗
08/13/2026B01113379-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/13/2026B01113379-I1Open ↗
08/13/2026B01198430-I1Open ↗
08/13/2026B01113379-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWWaiver Document2
08/15/2026B01133028-P1Open ↗
08/13/2026B01133028-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
06/07/2017340312575Open ↗
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
10/22/2015340317669Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
10/22/2015340317669Open ↗