| Owner | Filings | Most Recent |
|---|---|---|
| BOSTON PROPERTIES | 1,419 | 09/30/2026 |
| BXP | 488 | 08/21/2026 |
| BELFER MANAGEMENT | 9 | 07/08/2026 |
| BP 347 MADISON ASSOCIATES LLC C O | 24 | 07/08/2026 |
| WESTERN WATERPROOFING CO INC | 5 | 07/08/2026 |
| APPLE | 7 | 07/08/2026 |
| PLATFORM SOLUTIONS INC. | 13 | 03/22/2026 |
| SPRING SCAFFOLDING LLC | 9 | 03/22/2026 |
| T-MOBILE | 5 | 03/22/2026 |
| WESTERN WATERPROOFING CO. INC. DBA | 2 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| TPG ARCHITECTURE, LLP | 41 | 08/28/2026 |
| ROBERT DERECTOR ASSOCIATES | 94 | 08/27/2026 |
| GENSLER | 27 | 08/24/2026 |
| DON M. DACUMOS | 2 | 08/07/2026 |
| ECKERSLEY O'CALLAGHAN & PARTNERS | 2 | 08/07/2026 |
| AMA CONSULTING ENGINEERS, PC | 140 | 07/21/2026 |
| TED MOUDIS ASSOCIATES | 5 | 06/16/2026 |
| COSENTINI ASSOCIATES | 14 | 05/27/2026 |
| JAROS BAUM & BOLLES | 60 | 04/23/2026 |
| CRIMSON ENGINEERING | 6 | 04/15/2026 |
| JL ARCHITECT | 2 | 03/24/2026 |
| THORNTON TOMASETTI | 12 | 03/06/2026 |
| VALERIO DEWALT TRAIN | 8 | 03/05/2026 |
| SSM DESIGN LLP D/B/A SPECTOR GROUP | 7 | 02/27/2026 |
| JOHN F. GIUSEFFI, ARCHITECT, PC | 6 | 02/18/2026 |
| ASHRAF CORP | 4 | 02/05/2026 |
| VOCON | 2 | 01/16/2026 |
| JAY LUBOW | 1 | 12/08/2025 |
| STUDIO HUJI | 10 | 11/20/2025 |
| AKF ENGINEERS, LLP | 53 | 09/02/2025 |
| TOHFAZ UDDIN PE PC | 7 | 07/29/2025 |
| MOED DE ARMAS & SHANNON | 6 | 07/18/2025 |
| PCS ENGINEERING | 3 | 07/15/2025 |
| GILSANZ MURRAY STEFICEK LLP | 22 | 07/09/2025 |
| BRAND ACCESS SOLUTIONS | 2 | 06/03/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| GILLMAN CONSULTING | 730 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 195 | 03/21/2026 |
| RIZZO GROUP | 7 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 3 | 03/21/2026 |
| BUILDING BROTHERS | 2 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 20 | 03/21/2026 |
| SIGNS CAD | 20 | 03/21/2026 |
| HOWARD I SHAPIRO ASSOCIATES | 8 | 03/21/2026 |
| KD DESIGNS | 8 | 03/21/2026 |
| GARO GUMUSYAN | 5 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JT MAGEN & COMPANY INC | General Contractor | 62 | 09/29/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 62 | 07/08/2026 |
| STRUCTURE TONE, LLC | General Contractor | 51 | 09/30/2026 |
| STARR INDUSTRIES LLC | General Contractor | 43 | 07/08/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 38 | 09/26/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 33 | 09/17/2026 |
| ICON INTERIORS INC | General Contractor | 26 | 07/08/2026 |
| GANNON CONTRACTING LLC | General Contractor | 26 | 09/01/2026 |
| TURNER CONSTRUCTION COMPANY | General Contractor | 26 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 22 | 07/08/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 19 | 07/08/2026 |
| LAB PLBG & HTG CO INC | Plumbing | 18 | 07/08/2026 |
| TRI-STAR CONSTRUCTION CORP | General Contractor | 16 | 07/08/2026 |
| GEOFFREY A. LAGAS & ASSOC | Plumbing | 15 | 09/16/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 14 | 07/08/2026 |
| PAR PLUMBING CO., INC | Plumbing | 13 | 07/23/2026 |
| REIDY CONTRACTING GROUP | General Contractor | 13 | 07/08/2026 |
| PACE PLUMBING CORP | Plumbing | 12 | 07/08/2026 |
| AGGRESSIVE FIRE PROT LLC | Fire Protection | 11 | 07/08/2026 |
| SIGNS CAD | Scaffold | 10 | 07/08/2026 |
| HENEGAN CONSTRUCTION CO., | General Contractor | 10 | 07/08/2026 |
| VERICON CONSTRUCTION CO | General Contractor | 9 | 07/08/2026 |
| SCIAME CONSTRUCTION LLC | General Contractor | 9 | 07/08/2026 |
| PLATFORM SOLUTIONS, INC | General Contractor | 9 | 03/21/2026 |
| PSI PARTNERS, LLC | Fire Protection | 8 | 08/20/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CODEGREEN | 510 | 61 | 08/28/2026 |
| AK ENGINEERING PC | 678 | 60 | 08/27/2026 |
| MILROSE CONSULTANTS LLC | 2003 | 51 | 07/30/2026 |
| MG ENGINEERING D.P.C. | 8546 | 16 | 06/23/2026 |
| ENGINEERING BUILDING SERV | 7303 | 11 | 03/24/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 23 | 03/10/2026 |
| ATLANTIC ENGINEERINGLABOR | 1381 | 125 | 02/24/2026 |
| PCS ENGINEERING | 3745 | 3 | 07/15/2025 |
| ATLAS ATC ENGINEERING INC | 8011 | 109 | 06/18/2025 |
| GILSANZ MURRAY STEFICEK | 240 | 2 | 06/12/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | WOLF CONSTRUCTION CORP 20 | 09/30/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 09/29/2026 |
| DOB NOW | Structural | Permit Issued | STRUCTURE TONE, LLC | 09/29/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT MAGEN & COMPANY INC | 09/28/2026 |
| DOB NOW | Structural | Permit Issued | JT MAGEN & COMPANY INC | 09/28/2026 |
| DOB NOW | General Construction | Permit Issued | JT MAGEN & COMPANY INC | 09/28/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 09/22/2026 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 09/16/2026 |
| DOB NOW | Plumbing | Permit Issued | GEOFFREY A. LAGAS & ASSOC | 09/15/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 09/10/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 09/08/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | GANNON CONTRACTING LLC | 08/31/2026 |
| DOB NOW | General Construction | Permit Issued | GANNON CONTRACTING LLC | 08/31/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | GANNON CONTRACTING LLC | 08/28/2026 |
| DOB NOW | General Construction | Permit Issued | GANNON CONTRACTING LLC | 08/28/2026 |
| DOB NOW | General Construction | Permit Issued | WOLF CONSTRUCTION CORP 20 | 08/25/2026 |
| DOB NOW | General Construction | Permit Issued | WESTERN WATERPROOFING COM | 08/20/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 07/31/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR PLUMBING CO., INC | 07/22/2026 |
| DOB NOW | Standpipe | Permit Issued | PAR FIRE PROTECTION LLC | 07/21/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 07/21/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | GANNON CONTRACTING LLC | 07/20/2026 |
| DOB NOW | General Construction | Permit Issued | GANNON CONTRACTING LLC | 07/20/2026 |
| DOB NOW | Mechanical Systems | Signed-off | ICON INTERIORS INC | 06/30/2026 |
| DOB NOW | Plumbing | Permit Issued | PREFERRED PIPING, INC | 05/19/2026 |
| DOB NOW | Plumbing | Permit Issued | LAB PLBG & HTG CO INC | 05/15/2026 |
| DOB NOW | General Construction | Permit Issued | TURNER CONSTRUCTION COMPANY | 05/04/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | WESTERN WATERPROOFING COM | 05/01/2026 |
| DOB NOW | Construction Fence | Permit Issued | STARR INDUSTRIES LLC | 04/16/2026 |
| DOB NOW | Sprinklers | Permit Issued | STANDARD FIRE SUPP CORP | 04/06/2026 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 04/03/2026 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 04/03/2026 |
| DOB NOW | Plumbing | Signed-off | GEOFFREY A. LAGAS & ASSOC | 03/31/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 03/30/2026 |
| DOB NOW | Sprinklers | Signed-off | LAWRENCE J. LEVINE | 03/30/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 03/27/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | STARR INDUSTRIES LLC | 03/25/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | STARR INDUSTRIES LLC | 03/25/2026 |
| DOB NOW | Plumbing | Permit Issued | LAB PLBG & HTG CO INC | 03/24/2026 |
| DOB NOW | Sprinklers | Permit Issued | LAWRENCE J. LEVINE | 03/17/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/27/2026 | Permit Issued | GANNON CONTRACTING LLC | Air Conditioning Systems | Cooling Above Air MCW-014C-4-E2H0 55,900 BTU ×1 |
| 07/21/2026 | Signed-off | ICON INTERIORS INC | Air Conditioning Systems | Cooling Florida Heat Pump CL024 2 tons · Wshp ×3 CL012 1 tons · Wshp ×2 CL018 2 tons · Wshp ×2 CL060 5 tons · Wshp ×2 CL042 4 tons · Wshp ×1 CL048 4 tons · Wshp ×1 |
| 07/16/2026 | Permit Issued | GANNON CONTRACTING LLC | Refrigeration Systems | Refrigeration Mitsubishi Electric TPEFYP012MA143A 12,000 BTU · Vrf Indoor ×4 |
| 05/06/2026 | Signed-off | JT MAGEN & COMPANY INC | Air Conditioning Systems | |
| 03/24/2026 | Permit Issued | STRUCTURE TONE, LLC | Air Conditioning Systems | Cooling |
| 02/24/2026 | Signed-off | ICON INTERIORS INC | Air Conditioning Systems | Cooling Trane STULZ CCCU-041-W-EC 2 tons · Crac Unit ×1 STULZ CCU-041-W-EC 2 tons · Crac Unit ×1 STULZ CCU-061-W-EC 2 tons · Crac Unit ×1 Above Air HKW-005S1 2 tons ×1 MCW-005S-4-00000-EC-00-UF0-X2 2 tons · Wshp ×2 MCW-007S-4-00000-EC-00-UF2-X2 2 tons ×1 Florida Heat Pump QV030 3 tons · Wshp ×1 Bosch QV030 3 tons · Heat Pump Outdoor ×1 Liebert MMD20WDXR07NS273 2 tons ×1 |
| 12/29/2025 | Signed-off | BENCHMARK BUILDERS LLC | Air Conditioning Systems | Cooling Florida Heat Pump CL012-2HZC-ALETUA-XCGXXXXXX7MXXX4XXXXSBA 1 tons · Wshp ×1 |
| 08/01/2025 | Permit Issued | JAMES E FITZGERALD INC | Air Conditioning Systems | Cooling Stulz CRS-042-W 46,500 BTU · Crac Unit ×1 |
| 06/18/2025 | Signed-off | ICON INTERIORS INC | Air Conditioning Systems | Cooling Vertiv MMD20WDXR07NS556 2 tons · Crac Unit ×1 |
| 06/13/2025 | Permit Issued | HUNTER ROBERTS CONSTRUCTI | Air Conditioning Systems | Cooling Trane RSCW0430F2 2 tons · Chiller ×1 |
| 06/11/2025 | Signed-off | SCIAME CONSTRUCTION LLC | Air Conditioning Systems | Cooling Water Furnace V5AH030BS 2 tons · Wshp ×5 V5AH060BS 5 tons · Wshp ×2 V5AH018BR 2 tons · Wshp ×1 V5AH048BS 4 tons · Wshp ×1 |
| 11/21/2024 | Signed-off | JT MAGEN & COMPANY INC | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Bosch EC120-4HZN-SLSBUA-XFGXXXXXHIMXEX8DXXXSBA 12,000 BTU · Wshp ×4 LV036-4HZN-FLSTUD-XFGXXXXXH1MXEX1XXXXSBA 36,000 BTU · Wshp ×4 LV036-4HZN-FLSTUD-XFGXXXXXH1MXEXXXXSBA 36,000 BTU · Wshp ×4 LV048-4HZN-FLSTUD-XFGXXXXXH1MEXXXXSBA 48,000 BTU · Wshp ×4 LV048-4HZN-FRSTUD-XFGXXXXH1MXEX1XXXXSBA 47,000 BTU · Wshp ×4 LV060-4HZN-FLSTUD-XFG-XXXXXH1MXEX1XXXXSBA 60,000 BTU · Wshp ×4 |
| 09/05/2024 | Signed-off | TURNER CONSTRUCTION COMPA | Air Conditioning Systems, Ventilation Systems | Cooling Loren Cook EF-41-1 260 CFM · Exhaust Fan ×1 Ventilation Loren Cook EF-41-1 950 CFM · Exhaust Fan ×2 |
| 02/08/2023 | Permit Issued | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems | |
| 08/01/2022 | Permit Issued | VERICON CONSTRUCTION CO | Air Conditioning Systems, Heating Systems, Ventilation Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/28/2026 | Permit Issued | PAR FIRE PROTECTION LLC | Sprinkler System |
| 08/27/2026 | — | — | — |
| 08/20/2026 | — | — | 64 heads |
| 07/21/2026 | Permit Issued | PREFERRED SPKLR AND MECH | Sprinkler System |
| 07/14/2026 | — | — | 22 heads |
| 06/23/2026 | Signed-off | ABCO-PEERLESS SPRKLR CORP | 17 heads |
| 06/16/2026 | — | — | 10 heads |
| 05/27/2026 | Signed-off | MASTER PLBG AND HTG INC | 334 heads |
| 04/14/2026 | Signed-off | ABCO-PEERLESS SPRKLR CORP | 330 heads |
| 03/24/2026 | Signed-off | PAR FIRE PROTECTION LLC | Sprinkler System |
| 03/10/2026 | Permit Issued | KG SPRINKLER CORP | Sprinkler System |
| 03/09/2026 | Signed-off | MASTER PLBG AND HTG INC | 4 outlets |
| 02/24/2026 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | Sprinkler System |
| 02/24/2026 | Signed-off | AGGRESSIVE FIRE PROT LLC | Sprinkler System |
| 01/22/2026 | Permit Issued | STANDARD FIRE PROTECT LLC | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/27/2026 | — | — | Water/Sanitary |
| 08/20/2026 | — | — | Water/Sanitary |
| 07/21/2026 | Permit Issued | LAB PLBG & HTG CO INC | Water/Sanitary |
| 05/27/2026 | Signed-off | HI-TECH PLUMBING & HEATIN | Storm, Water/Sanitary |
| 05/13/2026 | Permit Issued | PREFERRED PIPING, INC | Water/Sanitary |
| 05/06/2026 | Signed-off | ASHLAND PLUMBING CORP | Water/Sanitary |
| 04/23/2026 | Permit Issued | LAB PLBG & HTG CO INC | Water/Sanitary |
| 04/14/2026 | Signed-off | LAB PLBG & HTG CO INC | Water/Sanitary |
| 03/24/2026 | Signed-off | GEOFFREY A. LAGAS & ASSOC | Water/Sanitary |
| 03/10/2026 | Permit Issued | DONATO PLUMBING, INC | Water/Sanitary |
| 03/09/2026 | — | — | — |
| 02/24/2026 | Signed-off | PREFERRED MECHANICAL INC | Water/Sanitary |
| 01/22/2026 | — | — | — |
| 12/29/2025 | Signed-off | A&A PLUMBING CORP | Water/Sanitary |
| 12/02/2025 | Signed-off | GEOFFREY A. LAGAS & ASSOC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/25/2026 | Permit Issued | JAM ELECTRICAL CORP | General Wiring |
| 09/22/2026 | Permit Issued | FRED GELLER ELEC'L INC. | — |
| 09/18/2026 | Complete | FRED GELLER ELEC'L INC. | General Wiring |
| 09/09/2026 | Complete | PIERPONT ELECTRICAL LLC | — |
| 06/30/2026 | Permit Issued | ATLAS-ACON ELEC. SERVICE | 1 meters |
| 06/30/2026 | Permit Issued | ATLAS-ACON ELEC. SERVICE | 1 meters |
| 05/23/2026 | Complete | WARREN OSTROFF ELEC., INC | General Wiring |
| 05/18/2026 | Permit Issued | JAM ELECTRICAL CORP | — |
| 05/18/2026 | Permit Issued | JAM ELECTRICAL CORP | — |
| 05/18/2026 | Permit Issued | JAM ELECTRICAL CORP | — |
| 05/18/2026 | Permit Issued | JAM ELECTRICAL CORP | — |
| 05/18/2026 | Permit Issued | JAM ELECTRICAL CORP | — |
| 05/18/2026 | Permit Issued | JAM ELECTRICAL CORP | — |
| 05/18/2026 | Permit Issued | JAM ELECTRICAL CORP | — |
| 05/18/2026 | Permit Issued | JAM ELECTRICAL CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/07/2026 | Permit Issued | STRUCTURE TONE, LLC | 2 scope_items |
| 07/21/2026 | Permit Issued | PREFERRED SPKLR AND MECH | Steel, Concrete |
| 03/06/2026 | Permit Issued | JT MAGEN & COMPANY INC | Steel, Concrete |
| 02/24/2026 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | Steel |
| 12/29/2025 | Signed-off | BENCHMARK BUILDERS LLC | Steel |
| 07/09/2025 | Signed-off | SCIAME CONSTRUCTION LLC | Steel, Concrete |
| 06/13/2025 | Permit Issued | HUNTER ROBERTS CONSTRUCTI | Steel, Concrete |
| 10/24/2022 | Permit Issued | VERICON CONSTRUCTION CO | Steel, Concrete |
| 08/24/2022 | Permit Issued | STRUCTURE TONE, LLC | Steel |
| 07/31/2020 | Signed-off | STRUCTURE TONE, LLC | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/15/2026 | Permit Issued | STARR INDUSTRIES LLC | Fence |
| 02/05/2026 | Permit Issued | STARR INDUSTRIES LLC | Sidewalk Shed |
| 11/20/2025 | Permit Issued | STARR INDUSTRIES LLC | Fence |
| 11/12/2025 | Permit Issued | STARR INDUSTRIES LLC | Sidewalk Shed |
| 07/29/2025 | Permit Issued | KING HOIST & SCAFFOLDING | Fence, Sidewalk Shed |
| 07/12/2023 | Permit Issued | SAFWAY ATLANTIC, LLC | Scaffold |
| 11/03/2020 | Permit Issued | PLATFORM SOLUTIONS, INC | Scaffold |
| 03/30/2018 | Permit Issued | SAFWAY ATLANTIC, LLC | Scaffold |
| 03/02/2018 | Permit Issued | PLATINUM SCAFFOLDING SERV | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/15/2025 | Permit Issued | WESTERN WATERPROOFING CO | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/26/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 08/18/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/12/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/11/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/28/2026 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 07/27/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/27/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/14/2026 | Pass-Final Construction Permit Withdrawal | Pass | View ↗ |
| 07/09/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 07/06/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/03/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/02/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/01/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/26/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 06/15/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/10/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/26/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/21/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/19/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/13/2026 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 04/30/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/24/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/24/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 04/20/2026 | Certified Storm Drainage-ST-Fixtures-Finish | Certified | View ↗ |
| 04/17/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/18/2026 | Sprayed fire-resistant materials | HATIM ELSAID | special |
| 08/18/2026 | Energy Code Compliance Inspections | HATIM ELSAID | progress |
| 08/18/2026 | Interior lighting power | HATIM ELSAID | energy_progress |
| 08/18/2026 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 08/18/2026 | Mastic and Intumescent Fire-resistant Coatings | HATIM ELSAID | special |
| 08/18/2026 | Final | HATIM ELSAID | progress |
| 08/12/2026 | Sprayed fire-resistant materials | James Sullivan Jr | special |
| 08/12/2026 | Final | James Sullivan Jr | progress |
| 08/12/2026 | Fire-Resistant Penetrations and Joints | James Sullivan Jr | special |
| 07/29/2026 | Final | Christopher Drutjons | progress |
| 07/29/2026 | Mechanical Systems | Christopher Drutjons | special |
| 07/29/2026 | Post-installed Anchors | Christopher Drutjons | special |
| 07/22/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 07/22/2026 | Sprinkler Systems | Ari Kamo | special |
| 07/21/2026 | Final | Karen Solomon | progress |
| 07/21/2026 | Mechanical Systems | Ari Kamo | special |
| 07/21/2026 | Sprayed fire-resistant materials | Ari Kamo | special |
| 07/21/2026 | Fire-Resistance Rated Construction | Ari Kamo | progress |
| 07/21/2026 | Mechanical Systems | Ari Kamo | special |
| 07/21/2026 | Final | Ari Kamo | progress |
| 07/21/2026 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 07/21/2026 | Final | Ari Kamo | progress |
| 07/21/2026 | Post-installed Anchors | Christopher Drutjons | special |
| 07/21/2026 | Sprayed fire-resistant materials | Ari Kamo | special |
| 07/21/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Estée Lauder Companies | Office | Floors 38–43 | Project M01420904 Project M01420911 Project M01255281 Project M01196699 Project M01196729 Project M01023253 Project M01003755 Project M01003743 Project M00937511 Project M08031578 Project M08031387 Project M00542908 |
| USSA International | Office | Floor 45 | Project M01408178 Project M01408201 |
| Weil Gotshal & Manges | Office | Floors 6, 22, 23 | Project M01372853 Project M01304537 Project M01292769 Project M01292971 Project M01292976 Project M01257727 Project M01257770 Project M01257783 Project M01257789 Project M00285085 |
| Eldridge | Office | Floor 16 | Project M01367182 |
| Rialto Capital | Office | Floor 21 | Project M01336634 Project M00896660 Project M00896652 |
| Golden Tree | Office | — | Project M01336394 Project M01306825 |
| Moncler | Retail | Floors 1–3 | Project M01279519 Project M01279526 Project M01279530 Project M01279532 Project M01279533 Project M01279536 Project M01279539 Project M01279541 Project M01284064 Project M01255940 Project M01222693 Project M01222682 |
| Stavros Niarchos Foundation | Office | Floor 6 | Project M01236413 Project M01236422 |
| Parella Weinberg Partners | Office | Floors 3–5, 7 | Project M01202755 Project M01202769 Project M08024708 Project M08001037 |
| Patient Square Capital | Office | Floor 43 | Project M01175412 |
| Herno | Retail | Floor 1 | Project M01066386 Project M01041634 |
| GCM Grosvenor | Office | Floor 11 | Project M00947383 Project M00947955 Project M00947357 Project M00947135 |
| Perella Weinberg Partners | Office | Floors 3–5, 7, 10 | Project M08012759 Project M08012650 Project M07996790 Project M08002891 Project M00381448 |
| Balyasny Asset Management | Office | Floor 12 | Project M00801671 |
| BAM | Office | Floor 12 | Project M00803661 |
| Eldridge - Cain | Office | Floor 17 | Project M00790771 Project M00779735 |
| Chase | Office | — | Project M00772527 |
| Baron Capital | Office | Floors 47, 48 | Project M00749002 Project M00633880 Project M00631099 Project M00633830 Project M00515583 Project M00523220 |
| Belfer Management | Office | Floor 46 | Project M00735864 |
| VR Investments | Office | Floor 46 | Project M00547603 Project M00548457 Project M00549062 |
| Balenciaga | Retail | Cellar, Floor 1 | Project M00515165 |
| Maverick Capital | Fitness / Recreation | Floor 11 | Project M00469812 |
| Dior | Retail | Floors 1–5 | Project M00443774 Project M00443787 Project M00443790 Project M00443792 |
| Christian Dior Couture | Retail | Ground, Concourse, Floor 6, Mezzanine | Project M00344232 Project M00344260 Project M00344610 |
| Icahn Associates | Office | Floors 46, 47 | Project M00228978 |
| NER Relocation | Office | — | Project M00205828 |