DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
ECB05/12/2016ELECTRICAL WORK W/O A PERMIT. BRANCH CIRCUIT WIRING NEW LIGHT FIXTURES,OUTLET RECEPTACLES INSTALLED INSIDE OF THE COMMERCIAL SPACE W/O AN ELECTRICAL PERMIT. REMEDY: OBTAIN PERMIT.Nothing owed — awaiting certificate of correction
ECB08/31/200932A50A50B50C50D. 50A CHIMNEY/BOILER/FLU PIPE SOOTED UP. 50B CHIMNEY CLEAN OUT SEALED. 50C SAFETY RELEIF VALVE MUST PIPED DOWN 6"-8" FROM GROUND LEVEL. 50D NO TEST TEE AND VALVE ON STEAM GAUGE.Nothing owed — awaiting certificate of correction
ECB04/26/2008SEC 50A, 50B. FUCTON V.T. BOILER, 10HP, NB36530, OIL,1979 AROUND BOILER. OIL BURNER SERVICE REQUIRED FOR COMPLIANCE. 50B-EVIDENCE OF PARTICULATE ACCUMULATION IN BOILER COMBUSTION CHAMBER.VACUUM BOILER AT CLEANNothing owed — awaiting certificate of correction
ECB08/01/200650A, 50B, 50C, 44B, 44C. FUCTON V.J BOILER HP STEAM, NB 36530, OIL 1979 50A- SECONDARY LOW WATER CUT OFF MANUAL RESET SWITCH MISSING. 50B-NODRAIN LINE ON THE GAUGE GLASS ASSEMBLY. 50C-SECONDARY SCREW TYPE VALVENothing owed — awaiting certificate of correction
ECB11/20/20008C 8A 8B 9A 9B 49.1)WATER COLUMN DRAIN REDUCED AND NEEDS 2ND VALVE TO INSTALL.2)LOW WATER CUT OUT MANUAL RESET SWITCH IN THE PANEL (REMOVED TO RESTORE.3).ALL HAND HOLES WELDED RECEIPT BYI CERTIFIED BOILER WELDINothing owed — awaiting certificate of correction
ECB08/18/19982-BOILER HP NP LICENSED ENGINEER.Nothing owed — awaiting certificate of correction