Condo, residential unit in walk-up building
77-03 DITMARS BOULEVARD
QUEENS · BIN 4449172
💬 Discuss this project
0Year Built
—Stories
R2Building Class
R4Zoning
67,489 sfGross Floor Area
92Units
Rent Stabilized44 Open Violations 43 unresolved · 1 paperwork only ▸FDNY Report ↗
Condo, residential unit in walk-up building · 100,798 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 21p · 1 filing · 4 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MCALPINE ASSOCIATES ARCHITECTS PC308/08/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BIG APPLE REMODELING CORPGeneral Contractor107/08/2026
SUPERB PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MCALPINE ARCHITECTURE PC5694308/08/2021
Building Lifecycle
All (22)Filed (3)Permit Issued (2)Signed Off (1)Inspection (5)Special Inspection (11)
06/13/2023
Signed off — Alteration
Remove non-structural ceiling framing to create cathedral ceilings and add stair to attic space. Install new a/c split system.
Q00522945-I1
04/19/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/13/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
12/23/2022
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/14/2022
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/09/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/19/2021
Permit issued — Plumbing
Q00572043-I1-PL
08/12/2021
Special inspection requirement — Mechanical Systems
David McAlpine
08/12/2021
Special inspection requirement — Final
David McAlpine
08/12/2021
Special inspection requirement — Fire-Resistance Rated Construction
David McAlpine
08/12/2021
Special inspection requirement — HVAC-R and service water heating equipment
David McAlpine
08/12/2021
Special inspection requirement — Interior lighting power
David McAlpine
08/08/2021
Filed — Alteration
Remove non-structural ceiling framing to create cathedral ceilings and add stair to attic space. Install new a/c split system.
Q00522945-P1
08/08/2021
Filed — Alteration
Plumbing Work to Install a Washer in the Apartment, extending existing water, waste and vent lines.
Q00572043-I1
08/06/2021
Special inspection requirement — Mechanical Systems
David McAlpine
08/06/2021
Special inspection requirement — Final
David McAlpine
08/06/2021
Special inspection requirement — Fire-Resistance Rated Construction
David McAlpine
08/06/2021
Special inspection requirement — HVAC-R and service water heating equipment
David McAlpine
08/06/2021
Special inspection requirement — Interior lighting power
David McAlpine
08/06/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
David McAlpine
06/08/2021
Permit issued — Mechanical Systems
Q00522945-I1-GC-CX
05/25/2021
Filed — Alteration
Remove non-structural ceiling framing to create cathedral ceilings and add stair to attic space. Install new a/c split system.
Q00522945-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedSUPERB PLUMBING & HEATING08/19/2021
DOB NOWMechanical SystemsSigned-offBIG APPLE REMODELING06/08/2021
1 project · most recent 08/08/2021
Water/Sanitary
FiledStatusContractorScope
08/08/2021Permit IssuedSUPERB PLUMBING & HEATINGWater/Sanitary
1 project · most recent 06/08/2021
General Wiring
FiledStatusContractorScope
06/08/2021CompletePOS ELECTRICAL CONTRS INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/19/2023Fail-Final CND-Occupancy InspectionFailView ↗
03/13/2023Fail-Final CND-Occupancy InspectionFailView ↗
12/23/2022Fail-Final CND-Occupancy InspectionFailView ↗
07/14/2022Fail-Final CND-Occupancy InspectionFailView ↗
09/09/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
08/12/2021Mechanical SystemsDavid McAlpinespecial
08/12/2021FinalDavid McAlpineprogress
08/12/2021Fire-Resistance Rated ConstructionDavid McAlpineprogress
08/12/2021HVAC-R and service water heating equipmentDavid McAlpineenergy_progress
08/12/2021Interior lighting powerDavid McAlpineenergy_progress
08/06/2021Mechanical SystemsDavid McAlpinespecial
08/06/2021FinalDavid McAlpineprogress
08/06/2021Fire-Resistance Rated ConstructionDavid McAlpineprogress
08/06/2021HVAC-R and service water heating equipmentDavid McAlpineenergy_progress
08/06/2021Interior lighting powerDavid McAlpineenergy_progress
08/06/2021Fire-Resistant Penetrations and JointsDavid McAlpinespecial
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026Q00522945-I1Request digital key ↗
08/27/2026Q00522945-P1Request digital key ↗
08/27/2026Q00572043-I1Request digital key ↗
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature8
08/28/2026Q00522945-P1Open ↗
08/28/2026Q00522945-P1Open ↗
08/28/2026Q00522945-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026Q00522945-I1Open ↗
08/27/2026Q00572043-I1Open ↗
08/13/2026Q00522945-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026Q00572043-I1Open ↗
08/28/2026Q00522945-P1Open ↗
08/23/2026Q00522945-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026Q00522945-I1Open ↗
08/27/2026Q00572043-I1Open ↗
08/13/2026Q00522945-P1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00522945-I1Open ↗