2 Open Violations 0 unresolved · 2 paperwork only▸
ECB09/27/200019A 49 BOILER BLOW DOWN LINE IS REDUCED. 2. FORM P-2 THE MANUFACTURER DATA SHEET SHDIL BE SUBMITTED FOR THIS BOILER AND COPY PROVIDED TO THE INSPECTOR.Nothing owed — awaiting certificate of correction
ECB09/27/20003A 49 18A 18B (1) BLOW DOWN LINE REDUCED BETWEEN 2ND AND 3RD VALUE-2-GAGE GLAN LEAK MUST BE FITTED WITH STOP VALUE AND CRAIN PIPE UNDER NEATHE -3-FORM P-2 THE MANUFACTURER DATA SHEET TO SUBMIT AND COPY PROVIDEDNothing owed — awaiting certificate of correction
Factory, light manufacturing · Owner of record: G & C INVESTMENT TRUST · 16,030 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.