← Back
Two stories - detached, small or mid-size
77-17 263 STREET
QUEENS · BIN 4177289
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2AZoning
2,283 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,600 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 21 filing · 14 docs
Floor 11p · 2 filings · 20 docs
Cellar2p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/31/2025$1.4M—— → —$613/sf building
11/04/2022$640K—— → —$280/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NASIR J, KHANZADA LLC510/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NASIR J. KHANZADA LLC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNITED GENERAL CONTRA CORGeneral Contractor407/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
M & M PIPING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NASIR J. KHANZADA LLC1527410/08/2024
Building Lifecycle
All (42)Filed (5)Permit Issued (4)Signed Off (2)Violation (1)Inspection (8)Objection (4)Special Inspection (18)
11/26/2024
Signed off — Alteration
PAA FILED TO AMEND APPROVED PLAN AS PER INSPECTION,
Q00821172-I1
10/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
Nasir Khanzada
10/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
10/25/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Nasir Khanzada
10/25/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Nasir Khanzada
10/25/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Nasir Khanzada
10/25/2024
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
10/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
Nasir Khanzada
10/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Nasir Khanzada
10/25/2024
Special inspection requirement — Maintenance information
Nasir Khanzada
10/16/2024
Objection resolved — Addressed
10/15/2024
Objection raised — Scope
10/08/2024
Filed — Alteration
PAA FILED TO AMEND APPROVED PLAN AS PER INSPECTION,
Q00821172-P2
10/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
10/08/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Nasir Khanzada
10/08/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Nasir Khanzada
10/08/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Nasir Khanzada
10/08/2024
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
10/08/2024
Special inspection requirement — HVAC-R and service water heating equipment
Nasir Khanzada
10/08/2024
Special inspection requirement — Maintenance information
Nasir Khanzada
10/08/2024
Special inspection requirement — HVAC-R and service water heating system controls
Nasir Khanzada
10/08/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Nasir Khanzada
09/30/2024
Signed off — Alteration
APPLICATION FILED FOR TEMPORARY CONSTRACTION FENCE IN CONJUCTION WITH DOB NOW APLLICATION# Q08037874
Q08038555-I1
09/25/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/08/2024
Permit issued — Plumbing
Q00821172-I1-PL
07/30/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/31/2024
Filed — Alteration
PAA FILED TO AMEND APPROVED PLAN AS PER INSPECTION,
Q00821172-P1
03/14/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/14/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/14/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/14/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/14/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/29/2024
Permit issued — Plumbing
Q00821172-I1-PL
12/05/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/21/2023
Permit issued — General Construction
Q08037874-I1-GC-CX
07/27/2023
Permit issued — Construction Fence
Q08038555-I1-FN
02/07/2023
Filed — Alteration CO
Q08037874-I1
01/31/2023
Filed — Alteration
PAA FILED TO AMEND APPROVED PLAN AS PER INSPECTION,
Q00821172-I1
11/29/2022
Objection raised — Structural
11/29/2022
Objection resolved — Addressed
11/23/2022
Filed — Alteration
APPLICATION FILED FOR TEMPORARY CONSTRACTION FENCE IN CONJUCTION WITH DOB NOW APLLICATION# Q08037874
Q08038555-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING08/08/2024
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT02/29/2024
DOB NOWGeneral ConstructionPermit IssuedUNITED GENERAL CONTRA COR09/21/2023
DOB NOWConstruction FenceSigned-offUNITED GENERAL CONTRA COR07/27/2023
1 project · most recent 12/13/2023
General Wiring
FiledStatusContractorScope
12/13/2023CompleteMETROPOLITAN ELEC OF NY IGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/14/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/14/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/14/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/14/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/14/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
10/25/2024HVAC-R and service water heating equipmentNasir Khanzadaenergy_progress
10/25/2024Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
10/25/2024Subsurface Investigations (Borings/Test Pits)Nasir Khanzadaspecial
10/25/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNasir Khanzadaspecial
10/25/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesNasir Khanzadaspecial
10/25/2024Energy Code Compliance InspectionsNasir Khanzadaprogress
10/25/2024HVAC-R and service water heating system controlsNasir Khanzadaenergy_progress
10/25/2024HVAC-R and service water piping design and insulationNasir Khanzadaenergy_progress
10/25/2024Maintenance informationNasir Khanzadaenergy_progress
10/08/2024Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
10/08/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNasir Khanzadaspecial
10/08/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesNasir Khanzadaspecial
10/08/2024Subsurface Investigations (Borings/Test Pits)Nasir Khanzadaspecial
10/08/2024Energy Code Compliance InspectionsNasir Khanzadaprogress
10/08/2024HVAC-R and service water heating equipmentNasir Khanzadaenergy_progress
10/08/2024Maintenance informationNasir Khanzadaenergy_progress
10/08/2024HVAC-R and service water heating system controlsNasir Khanzadaenergy_progress
10/08/2024HVAC-R and service water piping design and insulationNasir Khanzadaenergy_progress
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026Q08037874-I1Request digital key ↗
08/22/2026Q00821172-P1Request digital key ↗
08/22/2026Q00821172-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08037874-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q08037874-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWSpecial Inspector Seal & Signature6
08/27/2026Q00821172-P2Open ↗
08/27/2026Q00821172-P2Open ↗
08/27/2026Q00821172-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026Q08037874-I1Open ↗
08/22/2026Q00821172-I1Open ↗
08/22/2026Q00821172-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/27/2026Q00821172-P2Open ↗
08/27/2026Q00821172-P2Open ↗
08/23/2026Q00821172-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q08037874-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/25/2026Q08037874-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026Q08037874-I1Open ↗
08/22/2026Q00821172-P1Open ↗
08/22/2026Q00821172-I1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026Q00821172-P1Open ↗
08/13/2026Q00821172-I1Open ↗
08/13/2026Q00821172-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00821172-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q08037874-I1Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification1
08/25/2026Q08037874-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q08037874-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q08037874-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q08037874-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q08037874-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q08037874-I1Open ↗