← Back
Two stories - detached, small or mid-size
77-61 270 STREET
QUEENS · BIN 4177251
💬 Discuss this project
1945Year Built
2Stories
A1Building Class
R2AZoning
1,993 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingCivil
Floor 22p · 1 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURAL CONCEPT712/18/2025
MOMENTUM SOLAR209/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTUAL CONCEPT1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYLARK CONSTRUCTION CORPGeneral Contractor603/21/2026
WATERMARK PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURAL CONCEPT3642612/18/2025
MXV SIA LLC9281209/18/2025
Building Lifecycle
All (98)Filed (9)Permit Issued (4)Signed Off (4)Inspection (7)Objection (44)Special Inspection (30)
06/16/2026
Signed off — Alteration CO
Interior alteration and two-story extension of the existing one-family house as per drawings herewith field to obtain c/o.
Q00554134-I1
12/30/2025
Special inspection requirement — Subgrade Inspections
MUZAFFAR JAMAL
12/30/2025
Special inspection requirement — Concrete - Cast-In-Place
MUZAFFAR JAMAL
12/30/2025
Special inspection requirement — Masonry
MUZAFFAR JAMAL
12/30/2025
Special inspection requirement — Mechanical Systems
MUZAFFAR JAMAL
12/30/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
12/30/2025
Special inspection requirement — Ventilation and air distribution system
MUZAFFAR JAMAL
12/30/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MUZAFFAR JAMAL
12/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
MUZAFFAR JAMAL
12/30/2025
Special inspection requirement — Final
TARIQ SIDDIQUI
12/30/2025
Special inspection requirement — Footing and Foundation
MUZAFFAR JAMAL
12/30/2025
Special inspection requirement — Wood – Metal-Plate-Connected Trusses
MUZAFFAR JAMAL
12/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
12/30/2025
Special inspection requirement — Fenestration air leakage
MUZAFFAR JAMAL
12/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
12/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MUZAFFAR JAMAL
12/30/2025
Special inspection requirement — Interior lighting power
MUZAFFAR JAMAL
12/30/2025
Special inspection requirement — Insulation placement and R values
MUZAFFAR JAMAL
12/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
12/30/2025
Special inspection requirement — Protection of exposed foundation insulation
MUZAFFAR JAMAL
12/30/2025
Special inspection requirement — Air barrier - visual inspection
MUZAFFAR JAMAL
12/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
12/30/2025
Special inspection requirement — Fenestration areas
MUZAFFAR JAMAL
12/30/2025
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
12/18/2025
Filed — Alteration CO
Interior alteration and two-story extension of the existing one-family house as per drawings herewith field to obtain c/o.
Q00554134-P2
11/10/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS, ROOFTOP, RAILED, GRID-TIED, 14 MODULES, 5.11 KW
Q00972123-I1
10/22/2025
Objection resolved — Addressed
10/20/2025
Objection raised — Admin
09/18/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS, ROOFTOP, RAILED, GRID-TIED, 14 MODULES, 5.11 KW
Q00972123-P1
11/22/2024
Signed off — Alteration
Replace existing first floor bathroom fixtures and Install new plumbing fixtures as per drawings.
Q00549621-I1
11/21/2024
Signed off — Alteration
Q00549622-I1
11/18/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/08/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/26/2024
Objection resolved — Addressed
09/11/2024
Objection resolved — Addressed
08/06/2024
Objection resolved — Addressed
08/02/2024
Objection resolved — Addressed
07/23/2024
Objection raised — Scope
07/23/2024
Objection raised — Other
07/23/2024
Objection raised — Inspections
07/23/2024
Objection raised — Other
07/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
07/22/2024
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
07/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
07/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
07/22/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MUZAFFAR JAMAL
07/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
07/10/2024
Filed — Alteration CO
Interior alteration and two-story extension of the existing one-family house as per drawings herewith field to obtain c/o.
Q00554134-P1
07/10/2024
Filed — Alteration
Replace existing first floor bathroom fixtures and Install new plumbing fixtures as per drawings.
Q00549621-P2
07/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
02/23/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/05/2024
Filed — Alteration
Replace existing first floor bathroom fixtures and Install new plumbing fixtures as per drawings.
Q00549621-P1
12/29/2023
Permit issued — Solar
Q00972123-I1-SL
12/21/2023
Objection resolved — Addressed
12/12/2023
Objection raised — Other
12/06/2023
Filed — Alteration
INSTALLATION OF SOLAR PANELS, ROOFTOP, RAILED, GRID-TIED, 14 MODULES, 5.11 KW
Q00972123-I1
10/13/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/04/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/22/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR12/29/2023
DOB NOWPlumbingSigned-offWATERMARK PLUMBING CORP08/15/2023
DOB NOWEarth WorkPermit IssuedSKYLARK CONSTRUCTION CORP06/10/2023
DOB NOWConstruction FenceSigned-offSKYLARK CONSTRUCTION CORP02/15/2023
BISPLISSUEDAUTHENTIC PLBG CORP03/27/2012
BISOTISSUEDUNIVERSAL DESIGN & CONSTR03/16/2012
1 project · most recent 12/18/2025
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/18/2025Permit IssuedSKYLARK CONSTRUCTION CORPAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Goodman ASPT-39114 3 tons · Ahu ×5
ASPT-39C14 3 tons · Ahu ×5
Heating
Goodman ASPT-39C14 4 tons · Ahu ×10
Ventilation
Goodman ASPT-39C14 4 tons · Ahu ×10
Ducts & Piping
Goodman ASPT-39C14 1,600 CFM · Ahu ×10
2 projects · most recent 12/05/2023
General Wiring
FiledStatusContractorScope
12/05/2023CompleteISLAND ELECTRIC CORP—
08/23/2023CompleteSNB ELECTRICAL CONTNG CORGeneral Wiring
1 project · most recent 12/18/2025
Wood
FiledStatusContractorScope
12/18/2025Permit IssuedSKYLARK CONSTRUCTION CORPWood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/23/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/13/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/04/2023Fail-Final CND-Occupancy InspectionFailView ↗
08/22/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
12/30/2025Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
12/30/2025Subgrade InspectionsMUZAFFAR JAMALspecial
12/30/2025Wood – Metal-Plate-Connected TrussesMUZAFFAR JAMALspecial
12/30/2025MasonryMUZAFFAR JAMALspecial
12/30/2025Mechanical SystemsMUZAFFAR JAMALspecial
12/30/2025Concrete - Cast-In-PlaceMUZAFFAR JAMALspecial
12/30/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
12/30/2025Excavations - Sheeting, Shoring, and BracingMUZAFFAR JAMALspecial
12/30/2025Fire-Resistance Rated ConstructionMUZAFFAR JAMALprogress
12/30/2025FinalTARIQ SIDDIQUIprogress
12/30/2025Footing and FoundationMUZAFFAR JAMALprogress
12/30/2025Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
12/30/2025Ventilation and air distribution systemMUZAFFAR JAMALenergy_progress
12/30/2025Fenestration air leakageMUZAFFAR JAMALenergy_progress
12/30/2025HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
12/30/2025Fenestration and door U-factor and product ratingsMUZAFFAR JAMALenergy_progress
12/30/2025Interior lighting powerMUZAFFAR JAMALenergy_progress
12/30/2025Insulation placement and R valuesMUZAFFAR JAMALenergy_progress
12/30/2025HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
12/30/2025Protection of exposed foundation insulationMUZAFFAR JAMALenergy_progress
12/30/2025Air barrier - visual inspectionMUZAFFAR JAMALenergy_progress
12/30/2025HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
12/30/2025Fenestration areasMUZAFFAR JAMALenergy_progress
07/22/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMUZAFFAR JAMALspecial
07/22/2024HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
Latest 25 of 64.
▾Documents — 114 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/25/2026Q00549622-I1Request digital key ↗
08/23/2026Q00549621-I1Request digital key ↗
08/23/2026Q00549621-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
05/17/2012420540132Open ↗
05/16/2012420540132Open ↗
03/07/2012420540132Open ↗
▸BISWORK PERMIT APPLICATION2
03/27/2012420540132Open ↗
03/17/2012420540132Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00554134-P1Open ↗
08/13/2026Q00554134-P2Open ↗
08/13/2026Q00554134-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00554134-I1Open ↗
▸Seals & Professional Certifications46
▸DOB NOWSpecial Inspector Seal & Signature17
09/02/2026Q00549621-I1Open ↗
08/31/2026Q00554134-P1Open ↗
08/31/2026Q00554134-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026Q00549621-I1Open ↗
09/02/2026Q00549621-I1Open ↗
08/31/2026Q00554134-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/23/2026Q00549621-I1Open ↗
08/23/2026Q00549621-P1Open ↗
08/23/2026Q00549621-P2Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
06/12/2012420540132Open ↗
03/07/2012420540132Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/07/2012420540132Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/07/2012420540132Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE2
04/28/2012420540132Open ↗
04/06/2012420540132Open ↗
▸BISSCHEDULE B - PLUMBING1
03/07/2012420540132Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/18/2026Q00554134-P2Open ↗
08/15/2026Q00554134-P1Open ↗
08/15/2026Q00554134-I1Open ↗
▸BISSTREET TREE CHECKLIST1
03/07/2012420540132Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/23/2026Q00549621-P2Open ↗
08/23/2026Q00549621-I1Open ↗
08/23/2026Q00549621-P1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
03/07/2012420540132Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.2
08/15/2026Q00554134-I1Open ↗
08/13/2026Q00554134-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/07/2012420540132Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/12/2012420540132Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026Q00554134-I1Open ↗
08/13/2026Q00554134-P1Open ↗
08/13/2026Q00554134-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00554134-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/12/2012420540132Open ↗
06/12/2012420540132Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/07/2012420540132Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/12/2012420540132Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q00972123-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT2
06/12/2012420540132Open ↗
03/07/2012420540132Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026Q00554134-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026Q00554134-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
03/07/2012420540132Open ↗
▸Other Documents16
▸DOB NOWSite Survey: Initial3
08/13/2026Q00554134-I1Open ↗
08/13/2026Q00554134-P2Open ↗
08/13/2026Q00554134-P1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q00554134-I1Open ↗
08/13/2026Q00554134-P1Open ↗
08/13/2026Q00554134-P2Open ↗
▸DOB NOWSURVEY: INITIAL3
08/13/2026Q00554134-P1Open ↗
08/13/2026Q00554134-I1Open ↗
08/13/2026Q00554134-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00554134-P2Open ↗
08/13/2026Q00554134-P1Open ↗
08/13/2026Q00554134-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00554134-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00554134-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q00554134-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026Q00554134-I1Open ↗