77 ADELPHI STREET
BROOKLYN · BIN 3058096
💬 Discuss this project
1899Year Built
2Stories
A1Building Class
R5BZoning
2,667 sfGross Floor Area
1Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 1,875 sf lot · 1.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof4p · 3 filings · 20 docs
Floor 229p · 4 filings · 20 docs
Floor 137p · 3 filings · 20 docs
Cellar6p · 2 filings · 20 docs
Basement2p · 1 filing · 11 docs
Sub-Basement33p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/04/2021$1.4M—— → —$510/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS803/21/2026
KAMTECH RESTORATION CORP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYKER SOLUTIONS INCGeneral Contractor607/08/2026
KAMTECH RESTORATION CORPGeneral Contractor203/21/2026
BERGER QUALITY ELEC'L CONElectrical103/22/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHRISTIAN L. MARTOS ENGIN5965604/01/2026
CROSSCHECK INSPECTION SER544304/01/2026
THOMAS PETERSEN ARCHITECT7854208/29/2025
ANZ CONSULTING ENGINEERIN3946308/28/2025
Building Lifecycle
All (141)Filed (11)Permit Issued (6)Signed Off (4)Violation (9)Inspection (5)Objection (76)Special Inspection (30)
04/21/2026
Signed off — Alteration
Herewith submitting application for work on PL systems. No change to use egress or occupancy.
B00989120-I1
04/14/2026
Objection raised — Mechanical
04/14/2026
Objection raised — Plumbing
04/14/2026
Objection raised — Mechanical
04/14/2026
Objection raised — Mechanical
04/01/2026
Filed — Alteration
General Construction consisting of interior renovation and a horizontal enlargement to create a double height space on the Basement level. No change to Zoning Floor Area as per plans filed herewith,. No change to use, egress or occupancy.
B00905748-P2
03/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
03/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christian Martos
03/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
EUGENE BIFULCO
03/17/2026
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
03/17/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
03/17/2026
Special inspection requirement — Lighting controls
EUGENE BIFULCO
03/17/2026
Special inspection requirement — Insulation placement and R values
EUGENE BIFULCO
03/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
11/24/2025
Violation issued (HPD, open)
I
11/13/2025
Signed off — Alteration
Structural work for interior renovation of the cellar, basement level, and first floor of a two story existing brick nogging building. Only for structural job/review. No change to use, egress or occupancy.
B00982190-S1
11/07/2025
Signed off — Alteration
Structural work for interior renovation of the cellar, basement level, and first floor of a two story existing brick nogging building. Only for structural job/review. No change to use, egress or occupancy.
B00982190-I1
09/09/2025
Signed off — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01233553-I1
08/29/2025
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01233553-P1
08/29/2025
Special inspection requirement — Final
TOM PETERSEN
08/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
08/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
08/29/2025
Special inspection requirement — Final
TOM PETERSEN
08/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
08/29/2025
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
08/29/2025
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
08/29/2025
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
08/29/2025
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
08/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
08/28/2025
Filed — Alteration
Herewith submitting application for work on PL systems. No change to use egress or occupancy.
B00989120-P1
08/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
ALBERT ZIRINO
08/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
ALBERT ZIRINO
08/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALBERT ZIRINO
08/04/2025
Special inspection requirement — Energy Code Compliance Inspections
ALBERT ZIRINO
08/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERT ZIRINO
07/28/2025
Special inspection requirement — Insulation placement and R values
EUGENE BIFULCO
07/28/2025
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
07/28/2025
Special inspection requirement — Lighting controls
EUGENE BIFULCO
07/28/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
EUGENE BIFULCO
07/28/2025
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
07/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
07/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christian Martos
07/19/2025
Filed — Alteration
General Construction consisting of interior renovation and a horizontal enlargement to create a double height space on the Basement level. No change to Zoning Floor Area as per plans filed herewith,. No change to use, egress or occupancy.
B00905748-P1
06/03/2025
Permit issued — Solar
B01233553-I1-SL
05/29/2025
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01233553-I1
04/22/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/22/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/18/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/03/2024
Violation issued (HPD, open)
I
11/25/2024
Permit issued — Plumbing
B00989120-I1-PL
11/25/2024
Permit issued — Foundation
B00982190-S1-FO-EA
11/12/2024
Filed — Alteration
Structural work for interior renovation of the cellar, basement level, and first floor of a two story existing brick nogging building. Only for structural job/review. No change to use, egress or occupancy.
B00982190-P1
11/12/2024
Permit issued — General Construction
B00905748-I1-GC
11/12/2024
Permit issued — Mechanical Systems
B00989048-I1-MS
11/12/2024
Permit issued — Structural
B00982190-I1-ST
09/30/2024
Objection resolved — Addressed
09/30/2024
Objection resolved — Addressed
09/30/2024
Objection resolved — Addressed
Latest 60 of 141 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offKAMTECH RESTORATION CORP06/03/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC11/25/2024
DOB NOWFoundationSigned-offDYKER SOLUTIONS11/25/2024
DOB NOWGeneral ConstructionPermit IssuedDYKER SOLUTIONS11/12/2024
DOB NOWMechanical SystemsPermit IssuedDYKER SOLUTIONS11/12/2024
DOB NOWStructuralSigned-offDYKER SOLUTIONS11/12/2024
BISPLISSUEDMAINLAND PLG AND HTG INC07/29/1996
1 project · most recent 05/07/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/07/2024Permit IssuedDYKER SOLUTIONS INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAMHZ2-U1 36,000 BTU · Condensing Unit ×1
MXZ-SM48NAMHZ2-U1 48,000 BTU · Condensing Unit ×1
PEFY- P18 NMAU-E4 18,000 BTU · Vrf Indoor ×1
PEFY-P 12NMA U- E4 12,000 BTU · Vrf Indoor ×1
PEFY-P12NMAU- E4 18,000 BTU · Vrf Indoor ×1
PVFY-P48NMAU-E1 48,000 BTU · Vrf Indoor ×1
2 projects · most recent 05/27/2025
General Wiring
FiledStatusContractorScope
05/27/2025CompleteBERGER QUALITY ELEC'L CON—
02/25/2025CompleteUNITED ELEC'L CONT'G CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/22/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/22/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
03/17/2026Energy Code Compliance InspectionsEUGENE BIFULCOprogress
03/17/2026Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
03/17/2026Lighting controlsEUGENE BIFULCOenergy_progress
03/17/2026Insulation placement and R valuesEUGENE BIFULCOenergy_progress
03/17/2026Fenestration and door U-factor and product ratingsEUGENE BIFULCOenergy_progress
03/17/2026Structural Stability – Alterations of existing buildingsChristian Martosspecial
03/17/2026Interior lighting powerEUGENE BIFULCOenergy_progress
03/17/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
08/29/2025FinalTOM PETERSENprogress
08/29/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
08/29/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
08/29/2025FinalTOM PETERSENprogress
08/29/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
08/29/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
08/29/2025Energy Code Compliance InspectionsTOM PETERSENprogress
08/29/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
08/29/2025Energy Code Compliance InspectionsTOM PETERSENprogress
08/29/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
08/04/2025HVAC-R and service water heating equipmentALBERT ZIRINOenergy_progress
08/04/2025Fire-Resistant Penetrations and JointsALBERT ZIRINOspecial
08/04/2025Energy Code Compliance InspectionsALBERT ZIRINOprogress
08/04/2025HVAC-R and service water piping design and insulationALBERT ZIRINOenergy_progress
08/04/2025HVAC-R and service water heating system controlsALBERT ZIRINOenergy_progress
07/28/2025Insulation placement and R valuesEUGENE BIFULCOenergy_progress
07/28/2025Interior lighting powerEUGENE BIFULCOenergy_progress
Latest 25 of 66.
▾Documents — 107 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/25/2026B00989048-I1Request digital key ↗
08/25/2026B00989120-P1Request digital key ↗
08/25/2026B00989120-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION3
01/18/2022300509171Open ↗
10/13/2021300509171Open ↗
08/30/2021300509171Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00905748-I1Open ↗
08/13/2026B00905748-P2Open ↗
08/13/2026B00905748-P1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00905748-I1Open ↗
08/13/2026B00905748-P1Open ↗
08/13/2026B00905748-P2Open ↗
▸Seals & Professional Certifications55
▸DOB NOWProgress Inspector Seal & Signature25
09/01/2026B00982190-I1Open ↗
09/01/2026B00982190-I1Open ↗
08/31/2026B00989120-P1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/01/2026B00982190-I1Open ↗
09/01/2026B00982190-I1Open ↗
08/31/2026B00989120-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/25/2026B00989120-I1Open ↗
08/25/2026B00982190-I1Open ↗
08/25/2026B00982190-P1Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/25/2026B00989120-I1Open ↗
08/25/2026B00982190-S1Open ↗
08/25/2026B00982190-P1Open ↗
Showing 3 of 10 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026B00982190-S1Open ↗
08/13/2026B00982190-P1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B00982190-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00982190-S1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/06/2021300509171Open ↗
11/30/2021300509171Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01233553-I1Open ↗
▸Filing & Intake Forms3
▸DOB NOWAI1 Form (from plan PDF)2
08/16/2026B00905748-P1Open ↗
08/16/2026B00905748-P2Open ↗
▸BISADDITIONAL INFORMATION1
12/07/2021300509171Open ↗
▸Other Documents12
▸DOB NOWPlot Diagram5
08/13/2026B00905748-I1Open ↗
08/13/2026B00905748-P1Open ↗
08/13/2026B00905748-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00905748-I1Open ↗
08/13/2026B00905748-P2Open ↗
08/13/2026B00905748-P1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026B00905748-P2Open ↗
08/13/2026B00905748-I1Open ↗
08/13/2026B00905748-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00982190-S1Open ↗