← Back
Two stories - detached, small or mid-size
77 ALBERTA AVENUE
STATEN ISLAND · BIN 5176786
💬 Discuss this project
2025Year Built
2Stories
A1Building Class
R3AZoning
1,700 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: WELLBROOK DEVELOPMENT LLC · 2,500 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
Architecture
Floor 27p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar6p · 1 filing · 20 docs
Basement6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LATERRA DEVELOPERS3307/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LATERRA DEVELOPERS LLCGeneral Contractor1407/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272110/09/2025
C&P DESIGN CONSULTANT8472504/02/2025
SRA PLANNING & EXPEDITING5677103/15/2025
Building Lifecycle
All (42)Filed (8)Permit Issued (12)Signed Off (6)Inspection (16)
12/16/2025
Signed off — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM IN CONJUNCTION WITH NB APPLICATION
S01091006-S6
12/15/2025
Signed off — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM IN CONJUNCTION WITH NB APPLICATION
S01091006-S7
12/15/2025
Signed off — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM IN CONJUNCTION WITH NB APPLICATION
S01091006-S5
12/12/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/03/2025
Signed off — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM IN CONJUNCTION WITH NB APPLICATION
S01091006-S4
12/03/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01299902-I1
12/03/2025
Permit issued — Curb Cut
S01091006-S7-CC
11/10/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/04/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
11/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/27/2025
Filed — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM IN CONJUNCTION WITH NB APPLICATION
S01091006-S7
10/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/23/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/10/2025
Permit issued — Solar
S01299902-I1-SL
10/09/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01299902-I1
10/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/02/2025
Signed off — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM IN CONJUNCTION WITH NB APPLICATION
S01091006-S1
08/29/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/18/2025
Permit issued — Curb Cut
S01091006-S1-CC
08/18/2025
Permit issued — Mechanical Systems
S01091006-S5-MS
07/23/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/23/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/18/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/16/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/10/2025
Permit issued — Plumbing
S58153105-S6-PL
06/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/16/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/08/2025
Permit issued — Foundation
S01091006-I1-ST
04/08/2025
Permit issued — General Construction
S01091006-I1-GC
04/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/03/2025
Permit issued — Plumbing
S01091006-S4-PL
04/02/2025
Filed — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM IN CONJUNCTION WITH NB APPLICATION
S01091006-S5
04/02/2025
Permit issued — Plumbing
S01091006-S6-PL
03/15/2025
Filed — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM IN CONJUNCTION WITH NB APPLICATION
S01091006-S6
03/15/2025
Filed — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM IN CONJUNCTION WITH NB APPLICATION
S01091006-S4
03/01/2025
Permit issued — Foundation
S01091006-I1-FO
03/01/2025
Permit issued — General Construction
S01091006-I1-ST
02/28/2025
Permit issued — General Construction
S01091006-I1-GC
01/29/2025
Filed — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM IN CONJUNCTION WITH NB APPLICATION
S01091006-P1
08/20/2024
Filed — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM IN CONJUNCTION WITH NB APPLICATION
S01091006-S1
08/14/2024
Filed — New Building
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM IN CONJUNCTION WITH NB APPLICATION
S01091006-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offLATERRA DEVELOPERS LLC12/03/2025
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC10/10/2025
DOB NOWCurb CutSigned-offLATERRA DEVELOPERS LLC08/18/2025
DOB NOWMechanical SystemsSigned-offLATERRA DEVELOPERS LLC08/18/2025
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC07/10/2025
DOB NOWFoundationSigned-offLATERRA DEVELOPERS LLC04/08/2025
DOB NOWGeneral ConstructionPermit IssuedLATERRA DEVELOPERS LLC04/08/2025
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR04/03/2025
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR04/02/2025
DOB NOWFoundationSigned-offLATERRA DEVELOPERS LLC03/01/2025
DOB NOWGeneral ConstructionSigned-offLATERRA DEVELOPERS LLC03/01/2025
DOB NOWGeneral ConstructionPermit IssuedLATERRA DEVELOPERS LLC02/28/2025
1 project · most recent 10/27/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/27/2025Signed-offLATERRA DEVELOPERS LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Comfort Aire A-VCD30SA-1 & A-VCD36SA-1 55,000 BTU · Heat Pump Outdoor ×2
A-VMH09SV-1 16,000 BTU · Heat Pump Outdoor ×2
Ventilation
Fantech FIT80E 100 CFM · Erv ×1
N/A NA 30 CFM · Erv ×1
1 project · most recent 10/27/2025
Sprinkler System
FiledStatusContractorScope
10/27/2025——Sprinkler System
1 project · most recent 10/27/2025
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
10/27/2025Signed-offFLOW-RIGHT PLBG & HTG CORPlumbing-Sprinkler, Storm, Water/Sanitary
2 projects · most recent 10/24/2025
General Wiring
FiledStatusContractorScope
10/24/2025CompleteD AND H ELECTRICAL CONSTGeneral Wiring
10/09/2025CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 10/27/2025
Wood
FiledStatusContractorScope
10/27/2025Signed-offLATERRA DEVELOPERS LLCWood
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
12/12/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
11/10/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/04/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
11/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/29/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
07/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/18/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/16/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/16/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/07/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
04/02/2025Permanent certificateStanislav Pilipenkoenergy_progress
04/02/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
04/02/2025Maintenance informationStanislav Pilipenkoenergy_progress
04/02/2025Ventilation and air distribution systemStanislav Pilipenkoenergy_progress
04/02/2025Duct leakage testing, insulation and designStanislav Pilipenkoenergy_progress
04/02/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
04/02/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
04/02/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
04/02/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
03/15/2025Permanent certificateStanislav Pilipenkoenergy_progress
03/15/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
03/15/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
03/15/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
03/15/2025Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
03/15/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesWILLIAM MONTAGUEspecial
03/15/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
03/15/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
03/15/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
03/15/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
03/15/2025Maintenance informationStanislav Pilipenkoenergy_progress
03/13/2025Mechanical SystemsStanislav Pilipenkospecial
03/13/2025FinalStanislav Pilipenkoprogress
02/25/2025Insulation placement and R valuesStanislav Pilipenkoenergy_progress
02/25/2025Subgrade InspectionsStanislav Pilipenkospecial
02/25/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
Latest 25 of 62.
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/20/2026S01091006-I1Request digital key ↗
08/20/2026S01091006-S6Request digital key ↗
08/20/2026S01091006-S5Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
10/28/2025540264462Open ↗
01/31/2025540264462Open ↗
07/29/2024540264462Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/15/2024540264462Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026S01091006-P1Open ↗
08/13/2026S01091006-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S01091006-P1Open ↗
08/13/2026S01091006-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S01091006-I1Open ↗
08/13/2026S01091006-P1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026S01091006-S6Open ↗
09/02/2026S01091006-S6Open ↗
09/02/2026S01091006-S6Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/20/2026S01091006-I1Open ↗
08/20/2026S01091006-S5Open ↗
08/20/2026S01091006-S4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026S01091006-S6Open ↗
09/02/2026S01091006-S6Open ↗
08/26/2026S01091006-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/29/2024540264462Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/29/2024540264462Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S01091006-P1Open ↗
08/13/2026S01091006-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026S01091006-P1Open ↗
08/13/2026S01091006-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01091006-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S01091006-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S01091006-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT3
08/13/2026S01091006-I1Open ↗
08/13/2026S01091006-S6Open ↗
08/13/2026S01091006-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S01091006-S6Open ↗
08/13/2026S01091006-I1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
08/15/2024540264462Open ↗
▸Approvals, Objections & Sign-offs3
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
08/15/2024540264462Open ↗
08/15/2024540264462Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01299902-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/29/2024540264462Open ↗
▸Other Documents10
▸BISBPP - SUPPORTING DOCUMENTATION3
08/15/2024540264462Open ↗
08/15/2024540264462Open ↗
08/15/2024540264462Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S01091006-I1Open ↗
08/13/2026S01091006-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S01091006-I1Open ↗
08/13/2026S01091006-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026S01091006-I1Open ↗
08/14/2026S01091006-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S01091006-I1Open ↗