BuildNYC
Walk-up apt, over six families with stores
77 EAST 3RD STREET
MANHATTAN · East Village · BIN 1006189
💬 Discuss this project
1900Year Built
6Stories
C7Building Class
R8BZoning
11,025 sfGross Floor Area
14Units
Rent Stabilized3 Active Violations ▸
Walk-up apt, over six families with stores · Owner of record: 77 East 3rd Realty · 2,404 sf lot · 4.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBrighton Terrace LLC.1 filing · 6 docs
Floor 6Brighton Terrace LLC.Under Construction5p · 2 filings · 18 docs
Floor 5Brighton Terrace LLC.3p · 2 filings · 16 docs
Floor 4Brighton Terrace LLC.2p · 2 filings · 11 docs
Floor 3Brighton Terrace LLC.4p · 2 filings · 14 docs
Floor 2Brighton Terrace LLC.2p · 2 filings · 9 docs
Floor 1Brighton Terrace LLC.17p · 5 filings · 20 docs
CellarBrighton Terrace LLC.16p · 2 filings · 20 docs
Site & exteriorBrighton Terrace LLC.3p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Brighton Terrace6307/08/2026
77 E 3rd St Realty1703/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/17/2019$7.8M—Church of the Angels → 77 EAST 3RD REALTY LLC$703/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Levin Engineering305/28/2026
Grasso-Menziuso Architects1601/22/2026
PC Group204/04/2022
Green Design106/30/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Grasso-Menziuso Architects203/21/2026
Levin Engineering403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BT's Plumbing and HeatingPlumbing1207/08/2026
Alvarado Home ConstructionGeneral Contractor303/21/2026
American Builders & ContractingGeneral Contractor303/21/2026
Billy EnterprisesScaffold303/21/2026
American Builders & ContractingScaffold107/08/2026
Kishan PlumbingPlumbing106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Grasso-Menziuso Architect12791201/22/2026
Sia Inspections7306304/04/2022
Building Lifecycle
All (167)Filed (22)Permit Issued (17)Signed Off (6)Violation (60)Inspection (8)Objection (28)Special Inspection (26)
06/29/2026
Signed off — Alteration
Minor partition work with general carpentry in apartments 1, 2 and the 2 commercial spaces. No change to use or bulk
M00549482-I1
06/24/2026
Permit issued — Plumbing
M00267409-I1-PL
05/28/2026
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00381077-P1
05/27/2026
Special inspection requirement — Mechanical Systems
05/27/2026
Special inspection requirement — Final
02/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Menziuso
02/08/2026
Special inspection requirement — Lighting in dwelling units
Christopher Menziuso
02/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Menziuso
01/22/2026
Filed — Alteration
Minor partition work with general carpentry in apartments 1, 2 and the 2 commercial spaces. No change to use or bulk
M00549482-P4
01/21/2026
Filed — Alteration
Rep & relocate 4 lavs, 4 Wc's, 4 sinks, cap and remove 2 tubs, 4 new showers
M00267409-P3
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Menziuso
01/20/2026
Special inspection requirement — Lighting in dwelling units
Christopher Menziuso
01/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Menziuso
09/07/2025
Violation issued (HPD, closed)
A
08/18/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/23/2025
Filed — Alteration
Minor partition work with general carpentry in apartments 1, 2 and the 2 commercial spaces. No change to use or bulk
M00549482-P3
06/30/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/15/2025
Violation issued (HPD, open)
C
04/15/2025
Violation issued (HPD, open)
C
04/15/2025
Violation issued (HPD, open)
B
03/20/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/13/2025
Filed — Alteration
Minor partition work with general carpentry in apartments 1, 2 and the 2 commercial spaces. No change to use or bulk
M00549482-P2
11/22/2024
Violation issued (HPD, closed)
I
10/28/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/15/2024
Signed off — Alteration
M00554626-I1
04/10/2024
Signed off — Alteration
Cap & remove 2 tubs, Relocate 4 sinks , 3 water closets, 2 lavs, 4 new showers, 4 new dishwashers,, 2 new lavs, 1 new water closet
M00320831-I1
04/01/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/27/2024
Filed — Alteration
Rep & relocate 4 lavs, 4 Wc's, 4 sinks, cap and remove 2 tubs, 4 new showers
M00267409-P2
03/27/2024
Filed — Alteration
Cap & remove 2 tubs, Relocate 4 sinks , 3 water closets, 2 lavs, 4 new showers, 4 new dishwashers,, 2 new lavs, 1 new water closet
M00320831-P2
03/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Menziuso
03/27/2024
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Menziuso
12/13/2023
Signed off — Alteration
Cap & remove 2 tubs, Relocate 3 water closets, 2 lavs, 4 sinks, 4 new showers, 2 new lavs, 4 new dishwashers
M00314857-I1
12/13/2023
Signed off — Alteration
M00407219-I1
06/01/2023
Signed off — Alteration
Cap and remove 2 tubs, Rep & relocate 1 shower, 3 lavs, 3 sinks. 3 wc, 3 new showers, 1 new lav, 1 new wc, 4 new dw
M00268818-I1
05/22/2023
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Menziuso
05/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Menziuso
05/19/2023
Filed — Alteration
Cap and remove 2 tubs, Rep & relocate 1 shower, 3 lavs, 3 sinks. 3 wc, 3 new showers, 1 new lav, 1 new wc, 4 new dw
M00268818-P1
05/11/2023
Permit issued — General Construction
M00549482-I1-GC
03/01/2023
Filed — Alteration
Minor partition work with general carpentry in apartments 1, 2 and the 2 commercial spaces. No change to use or bulk
M00549482-P1
02/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Menziuso
02/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Menziuso
02/07/2023
Special inspection requirement — Lighting in dwelling units
Christopher Menziuso
09/06/2022
Violation issued (ECB, closed)
Construction
09/06/2022
Violation issued (ECB, closed)
Construction
09/02/2022
Violation issued (ECB, closed)
Construction
04/08/2022
Permit issued — Structural
M00502128-I1-ST
04/05/2022
Permit issued — Construction Fence
M00554626-I1-FN
04/04/2022
Filed — Alteration
Remove existing brick arches between existing steel beams on 1st flr place new concrete slab on metal deck on 1st floor. No change to use or egress.
M00502128-P1
03/30/2022
Violation issued (ECB, closed)
Construction
02/15/2022
Violation issued (HPD, closed)
A
10/04/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/28/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/22/2021
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Menziuso
09/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Menziuso
09/14/2021
Permit issued — Plumbing
M00582270-I1-PL
09/01/2021
Objection raised — Inspections
09/01/2021
Objection resolved — Addressed
09/01/2021
Objection raised — Mechanical
09/01/2021
Objection resolved — Addressed
09/01/2021
Objection raised — Other
Latest 60 of 167 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedKishan Plumbing06/24/2026
DOB NOWGeneral ConstructionSigned-offAlvarado Home Construction05/11/2023
DOB NOWStructuralPermit IssuedAmerican Builders & Contracting04/08/2022
DOB NOWConstruction FenceSigned-offAmerican Builders & Contracting04/05/2022
DOB NOWPlumbingSigned-offBT's Plumbing and Heating09/14/2021
DOB NOWPlumbingPermit IssuedBT's Plumbing and Heating08/11/2021
DOB NOWPlumbingSigned-offBT's Plumbing and Heating03/17/2021
DOB NOWPlumbingSigned-offBT's Plumbing and Heating03/16/2021
DOB NOWPlumbingSigned-offBT's Plumbing and Heating03/16/2021
DOB NOWPlumbingSigned-offBT's Plumbing and Heating03/16/2021
DOB NOWPlumbingPermit IssuedBT's Plumbing and Heating03/15/2021
DOB NOWPlumbingSigned-offBT's Plumbing and Heating12/08/2020
DOB NOWSidewalk ShedPermit IssuedBilly Enterprises07/01/2020
DOB NOWPlumbingSigned-offBT's Plumbing and Heating03/11/2020
DOB NOWPlumbingSigned-offBT's Plumbing and Heating03/06/2020
DOB NOWPlumbingSigned-offBT's Plumbing and Heating01/10/2020
DOB NOWPlumbingPermit IssuedBT's Plumbing and Heating01/09/2020
BISOTISSUEDAmerican Builders & Contracting12/07/2021
BISOTISSUEDAmerican Builders & Contracting12/06/2021
BISOTISSUEDAmerican Builders & Contracting03/18/2020
BISOTISSUEDAmerican Builders & Contracting03/18/2020
BISOTISSUEDAmerican Builders & Contracting03/18/2020
BISOTISSUEDAmerican Builders & Contracting02/11/2020
BISOTISSUEDAmerican Builders & Contracting11/13/2019
BISOTISSUEDAmerican Builders & Contracting10/15/2019
1 project · most recent 05/28/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/28/2026——Air Conditioning Systems
Cooling
Daikin RX24RMVJU 2 tons · Heat Pump Outdoor ×84
RZQ36TAVJU 3 tons · Vrf Outdoor ×8
RXSQ24TAVJU 2 tons · Vrf Outdoor ×4
3 projects · most recent 01/21/2026
Water/Sanitary Gas
FiledStatusContractorScope
01/21/2026Permit IssuedKishan PlumbingWater/Sanitary
08/25/2021Signed-offKishan Plumbing & HeatingGas, Water/Sanitary
07/13/2021Permit IssuedKishan Plumbing & HeatingGas, Water/Sanitary
6 projects · most recent 08/16/2022
General Wiring
FiledStatusContractorScope
08/16/2022CompleteMarks Electric25 meters, 25 new_meters
10/24/2021CompleteMarks ElectricGeneral Wiring
10/24/2021CompleteMarks ElectricGeneral Wiring
02/12/2020CompleteMarks ElectricGeneral Wiring
01/24/2020CompleteMarks ElectricGeneral Wiring
01/24/2020CompleteMarks ElectricGeneral Wiring
1 project · most recent 04/04/2022
Steel Concrete Masonry
FiledStatusContractorScope
04/04/2022Permit IssuedAmerican Builders & ContractingSteel, Concrete, Masonry
1 project · most recent 06/30/2020
Sidewalk Shed
FiledStatusContractorScope
06/30/2020Permit IssuedBilly EnterprisesSidewalk Shed
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/18/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/30/2025Fail-Final General Construction Non-Directive 14FailView ↗
03/20/2025Fail-Final General Construction Non-Directive 14FailView ↗
10/28/2024Fail-Final General Construction Non-Directive 14FailView ↗
04/01/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/04/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/28/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/25/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
05/27/2026Mechanical Systems—special
05/27/2026Final—progress
02/08/2026Fire-Resistant Penetrations and JointsChristopher Menziusospecial
02/08/2026Lighting in dwelling unitsChristopher Menziusoenergy_progress
02/08/2026Fire-Resistance Rated ConstructionChristopher Menziusoprogress
01/20/2026Fire-Resistant Penetrations and JointsChristopher Menziusospecial
01/20/2026Lighting in dwelling unitsChristopher Menziusoenergy_progress
01/20/2026Fire-Resistance Rated ConstructionChristopher Menziusoprogress
03/27/2024Fire-Resistant Penetrations and JointsChristopher Menziusospecial
03/27/2024Fire-Resistance Rated ConstructionChristopher Menziusoprogress
05/22/2023Fire-Resistance Rated ConstructionChristopher Menziusoprogress
05/22/2023Fire-Resistant Penetrations and JointsChristopher Menziusospecial
02/07/2023Fire-Resistance Rated ConstructionChristopher Menziusoprogress
02/07/2023Fire-Resistant Penetrations and JointsChristopher Menziusospecial
02/07/2023Lighting in dwelling unitsChristopher Menziusoenergy_progress
09/22/2021Fire-Resistance Rated ConstructionChristopher Menziusoprogress
09/22/2021Fire-Resistant Penetrations and JointsChristopher Menziusospecial
08/24/2021HVAC-R and service water heating equipmentJEFF AKERMANenergy_progress
08/24/2021HVAC-R and service water piping design and insulationJEFF AKERMANenergy_progress
08/24/2021Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
08/24/2021HVAC-R and service water heating system controlsJEFF AKERMANenergy_progress
08/24/2021Maintenance informationJEFF AKERMANenergy_progress
08/05/2020Final—progress
08/05/2020Mechanical Systems—special
02/21/2020Fire-Resistance Rated ConstructionChristopher Menziusoprogress
Latest 25 of 26.
▾Documents — 206 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch10
09/03/2026M00554626-I1Request digital key ↗
09/02/2026M00502128-I1Request digital key ↗
09/02/2026M00502128-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Plumbing10
09/05/2026M00268818-I1Request digital key ↗
09/05/2026M00320831-I1Request digital key ↗
09/05/2026M00320831-P2Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/17/2026M00381077-P1Request digital key ↗
08/17/2026M00381077-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00365036-I1Request digital key ↗
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION14
06/07/2022140953369Open ↗
06/07/2022123844224Open ↗
06/01/2022140953369Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION8
12/07/2021140953369Open ↗
12/06/2021123844224Open ↗
03/18/2020123898586Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/07/2022123898586Open ↗
▸Seals & Professional Certifications51
▸DOB NOWDPL-1: Design Professional Seal & Signature23
09/05/2026M00268818-I1Open ↗
09/05/2026M00320831-I1Open ↗
09/05/2026M00320831-P2Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026M00314857-I1Open ↗
09/02/2026M00320831-I1Open ↗
08/29/2026M00268818-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026M00314857-I1Open ↗
09/02/2026M00320831-I1Open ↗
08/29/2026M00268818-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
01/31/2020123847917Open ↗
12/16/2019123844224Open ↗
11/08/2019123784048Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
03/27/2020140892728Open ↗
—140953369Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes6
03/27/2020140892728Open ↗
01/31/2020123847917Open ↗
12/16/2019123844224Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00365036-I1Open ↗
▸Environmental & Asbestos27
▸DOB NOWDEP ACP-5: Asbestos Assessment Report21
09/05/2026M00268818-I1Open ↗
09/05/2026M00320831-P2Open ↗
09/05/2026M00320831-I1Open ↗
Showing 3 of 21 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
03/27/2020140892728Open ↗
01/31/2020123847917Open ↗
12/16/2019123844224Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY12
06/28/2022123847917Open ↗
06/28/2022123844224Open ↗
06/28/2022123784048Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
06/28/2022123847917Open ↗
06/28/2022123844224Open ↗
06/28/2022123784048Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
01/31/2020123847917Open ↗
12/16/2019123844224Open ↗
11/08/2019123784048Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00549482-I1Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY12
06/28/2022123847917Open ↗
06/28/2022123844224Open ↗
06/28/2022123784048Open ↗
Showing 3 of 12 on file for this type
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
06/28/2022123844224Open ↗
06/28/2022123784048Open ↗
06/28/2022123847917Open ↗
Showing 3 of 5 on file for this type
▸BISFINAL2
12/07/2021140953369Open ↗
12/06/2021123844224Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT13
06/28/2022123847917Open ↗
06/28/2022123844224Open ↗
06/28/2022123784048Open ↗
Showing 3 of 13 on file for this type
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION12
06/13/2022140953369Open ↗
06/13/2022123844224Open ↗
06/09/2022123844224Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET4
01/31/2020123847917Open ↗
12/16/2019123844224Open ↗
11/08/2019123784048Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
03/27/2020140892728Open ↗
—140953369Open ↗