DOB03/28/2023CYCLE 9C UNSAFE REPORT FILED
DOB12/31/2013FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013
DOB01/14/2009MAINTAIN BUILDING
DOB11/30/2007V-DOB VIOLATION - ACTIVE
DOB08/08/2002V-DOB VIOLATION - ACTIVE
ECB01/16/2024FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 7C, 8C, AND 9C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #909492. REMEDY: FILE ACCEPTABLE RENothing owed — awaiting certificate of correction
ECB03/07/2018FAILURE TO SUBMIT ACCEPTABLE 7TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL# 709492. REM: SUBMIT REQUIRED TECHNICAL REPORT.Nothing owed — awaiting certificate of correction
ECB12/30/2015FAILURE TO FILE AN ACCEPTABLE TECHNICAL REPORT IN COMPLIANCE WITH CODEPROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES ASREQUIRED BY ARTICLE 28.302 AND THE DOB RULES AND REGULATIONS.RMDY:FILENothing owed — awaiting certificate of correction
ECB04/24/2015FAILURE TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY ARTICLE 28-302 & THE DEPT OF BLDGS RULES & REGULATNothing owed — awaiting certificate of correction