MANHATTAN
77 LENOX AVENUE
MANHATTAN · BIN 1055019
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
103 Open Violations 102 unresolved · 1 paperwork only ▸
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction42p · 6 filings · 20 docs
Bulkhead1p · 1 filing · 6 docs
Floor 5Under Construction38p · 4 filings · 20 docs
Floor 4Under Construction38p · 4 filings · 20 docs
Floor 3Under Construction37p · 3 filings · 20 docs
Floor 2Under Construction38p · 3 filings · 20 docs
Floor 1Under Construction40p · 4 filings · 20 docs
CellarUnder Construction39p · 4 filings · 20 docs
Basement2p · 1 filing · 10 docs
1 job · most recent 04/14/2026
Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/14/2026——Associated Ducts and Piping, Heating Systems, Ventilation Systems
Heating
Slant-Fin TK-90 3,584 BTU · Boiler ×48
Bell & Gossett W-60 15 kW · Pump ×4
Lochinvar FTX500N 500,000 BTU · Condensing Unit ×4
Ventilation
Greenheck C-097-VG Exhaust Fan ×6
CVE-080-VG, CVE-680-VG Kitchen Exhaust ×4
Rupp Air RARTUI-E302-15-7.5T-DOAS 102,000 BTU · Doas ×2
Ducts & Piping
1 job · most recent 08/11/2026
FiledStatusContractorScope
08/11/2026Permit IssuedADVANCED PLUMBING LLC113 heads
3 jobs · most recent 08/11/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/11/2026———
04/14/2026——Gas, Storm, Water/Sanitary
11/03/2023——Gas, Storm, Water/Sanitary
3 jobs · most recent 07/02/2026
General Wiring
FiledStatusContractorScope
07/02/2026Permit IssuedRICHARD NEU—
04/14/2026Permit IssuedLND ELECTRIC LLCGeneral Wiring
09/29/2021Permit IssuedRICHARD NEU—
1 job · most recent 04/20/2026
Concrete Wood
FiledStatusContractorScope
04/20/2026Permit IssuedTOUCHSTONE RENOVATIONS LLConcrete, Wood
2 jobs · most recent 07/02/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
07/02/2026Permit IssuedALPHA GROUP NY1 CORPScaffold
07/02/2026Permit IssuedALPHA GROUP NY1 CORPSidewalk Shed
1 job · most recent 08/03/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/03/2026Permit IssuedM.G.R. RESTORATION INCSuspended Scaffold (SC)
Building Lifecycle
All (139)Filed (17)Permit Issued (8)Signed Off (1)Violation (60)Objection (23)Special Inspection (30)
09/08/2026
Permit issued — Structural
M00517427-I1-ST
08/19/2026
Permit issued — Sprinklers
M01424107-I1-EW-SP
08/13/2026
Permit issued — Suspended Scaffold
M01438550-I1-SC
08/11/2026
Filed — Alteration
THE SCOPE OF WORK SHALL CONSIST OF A NEW AUTOMATIC WET SPRINKLER SYSTEM TO BE INSTALLED THROUGHOUT AN EXISTING5 STORY R-2 BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01424107-I1
08/09/2026
Objection resolved — Addressed
08/07/2026
Objection raised — Other
08/03/2026
Filed — Alteration
Suspended scaffold outrigger installation for facade restoration works
M01438550-I1
07/06/2026
Permit issued — Supported Scaffold
M01421753-I1-SF
07/02/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01421753-I1
07/02/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01414223-I1
07/02/2026
Permit issued — Sidewalk Shed
M01414223-I1-SH
06/29/2026
Special inspection requirement — Post-installed Anchors
Kemba Walcott
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kemba Walcott
06/29/2026
Special inspection requirement — Sprinkler Systems
Kemba Walcott
06/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
Kemba Walcott
06/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Kemba Walcott
06/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Kemba Walcott
06/11/2026
Special inspection requirement — Final
Kemba Walcott
06/11/2026
Special inspection requirement — Heating Systems
Kemba Walcott
06/11/2026
Special inspection requirement — Mechanical Systems
Kemba Walcott
06/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
Kemba Walcott
06/11/2026
Special inspection requirement — Shutoff dampers
Kemba Walcott
06/09/2026
Filed — Alteration
REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, STUCCO REPLACEMENT AND LINTEL REPLACEMENT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01353136-I1
04/29/2026
Violation issued (HPD, open)
A
04/20/2026
Filed — Alteration
HEREWITH FILING STRUCTURAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANC
M00517427-P1
04/14/2026
Filed — Alteration
HEREWITH FILING PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00517401-P1
04/14/2026
Filed — Alteration
HEREWITH FILING MECHANICAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00517395-P1
04/13/2026
Special inspection requirement — Wood – Seismic Resistance
04/08/2026
Special inspection requirement — Structural Wood Frame
Kemba Walcott
04/08/2026
Special inspection requirement — Heating Systems
Kemba Walcott
04/08/2026
Special inspection requirement — Mechanical Systems
Kemba Walcott
04/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Kemba Walcott
04/08/2026
Special inspection requirement — Final
Kemba Walcott
04/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
Kemba Walcott
04/08/2026
Special inspection requirement — Shutoff dampers
Kemba Walcott
04/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Kemba Walcott
04/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Kemba Walcott
04/08/2026
Special inspection requirement — Concrete - Cast-In-Place
Kemba Walcott
04/08/2026
Special inspection requirement — Masonry
Kemba Walcott
04/08/2026
Special inspection requirement — Post-installed Anchors
Kemba Walcott
04/08/2026
Special inspection requirement — Structural Cold-Formed Steel
Kemba Walcott
04/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kemba Walcott
04/08/2026
Special inspection requirement — Structural Steel - Details
Kemba Walcott
04/08/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Kemba Walcott
04/08/2026
Special inspection requirement — Structural Steel - Welding
Kemba Walcott
04/08/2026
Special inspection requirement — Final
Kemba Walcott
03/26/2026
Permit issued — General Construction
M00517383-I1-GC
01/12/2026
Permit issued — General Construction
M00517383-I1-GC
01/12/2026
Objection raised — Fire_Protection
01/12/2026
Objection raised — Fire_Protection
01/12/2026
Objection raised — Fire_Protection
01/12/2026
Objection raised — Scope
01/12/2026
Objection raised — Plumbing
12/29/2025
Filed — Alteration
HEREWITH FILING BOILER WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01043039-I1
12/08/2025
Filed — Alteration
HEREWITH FILING DEMO & CONSTRUCTION WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00517383-P2
07/08/2025
Objection raised — Scope
07/08/2025
Objection resolved — Addressed
07/18/2024
Filed — Alteration
HEREWITH FILING STRUCTURAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANC
M00517427-I1
07/18/2024
Objection raised — Other
07/18/2024
Objection resolved — Addressed
Latest 60 of 139 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALPHA GROUP NY1207/08/2026
NYC HOUSING PRESERVATION AND DEVELOPMENT103/22/2026
HOUSING PRESERVATION & DE303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALPHA GROUP NY1 CORPGeneral Contractor207/08/2026
SUMMIT JV LLCGeneral Contractor204/09/2026
ADVANCED PLUMBING LLCFire Protection108/20/2026
MARK CONTRACTING NY INCGeneral Contractor107/08/2026
TOUCHSTONE RENOVATIONS LLGeneral Contractor109/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KCE CONSULTING ENGINEERIN3712908/11/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedTOUCHSTONE RENOVATIONS LL09/08/2026
DOB NOWSprinklersPermit IssuedADVANCED PLUMBING LLC08/19/2026
DOB NOWSuspended ScaffoldPermit IssuedM.G.R. RESTORATION INC08/13/2026
DOB NOWSupported ScaffoldPermit IssuedALPHA GROUP NY1 CORP07/06/2026
DOB NOWSidewalk ShedPermit IssuedALPHA GROUP NY1 CORP07/02/2026
DOB NOWGeneral ConstructionPermit IssuedSUMMIT JV LLC03/26/2026
DOB NOWGeneral ConstructionPermit IssuedSUMMIT JV LLC01/12/2026
DOB NOWSidewalk ShedSigned-offMARK CONTRACTING NY INC09/29/2021
BISOTISSUEDPUAR GENERAL CONSTRUCTION, ICN.05/02/2001
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
06/29/2026Post-installed AnchorsKemba Walcottspecial
06/29/2026Fire-Resistant Penetrations and JointsKemba Walcottspecial
06/29/2026Sprinkler SystemsKemba Walcottspecial
06/11/2026HVAC-R and service water heating equipmentKemba Walcottenergy_progress
06/11/2026HVAC-R and service water piping design and insulationKemba Walcottenergy_progress
06/11/2026Energy Code Compliance InspectionsKemba Walcottprogress
06/11/2026FinalKemba Walcottprogress
06/11/2026Heating SystemsKemba Walcottspecial
06/11/2026Mechanical SystemsKemba Walcottspecial
06/11/2026HVAC-R and service water heating system controlsKemba Walcottenergy_progress
06/11/2026Shutoff dampersKemba Walcottenergy_progress
04/13/2026Wood – Seismic Resistance—special
04/08/2026Structural Wood FrameKemba Walcottprogress
04/08/2026Heating SystemsKemba Walcottspecial
04/08/2026Mechanical SystemsKemba Walcottspecial
04/08/2026Energy Code Compliance InspectionsKemba Walcottprogress
04/08/2026FinalKemba Walcottprogress
04/08/2026HVAC-R and service water heating equipmentKemba Walcottenergy_progress
04/08/2026Shutoff dampersKemba Walcottenergy_progress
04/08/2026HVAC-R and service water piping design and insulationKemba Walcottenergy_progress
04/08/2026HVAC-R and service water heating system controlsKemba Walcottenergy_progress
04/08/2026Concrete - Cast-In-PlaceKemba Walcottspecial
04/08/2026MasonryKemba Walcottspecial
04/08/2026Post-installed AnchorsKemba Walcottspecial
04/08/2026Structural Cold-Formed SteelKemba Walcottspecial
Latest 25 of 59.
▾Documents — 115 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
09/03/2026M00596159-I1Request digital key ↗
08/28/2026M00928919-I1Request digital key ↗
08/28/2026M00928919-P1Request digital key ↗
Showing 3 of 19 on file for this type
▸Seals & Professional Certifications50
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/28/2026M00928919-P1Open ↗
08/28/2026M00928919-I1Open ↗
08/27/2026M00517383-P3Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/23/2026M00517395-I1Open ↗
09/01/2026M00517383-P2Open ↗
09/01/2026M00517383-P2Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026M00517395-I1Open ↗
09/01/2026M00517383-P2Open ↗
09/01/2026M00517383-P2Open ↗
Showing 3 of 12 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/27/2026M00517383-P3Open ↗
08/17/2026M00517395-I1Open ↗
08/17/2026M00517395-P1Open ↗
Showing 3 of 12 on file for this type
▸Approvals, Objections & Sign-offs28
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
08/28/2026M00928919-P1Open ↗
08/27/2026M00517383-P3Open ↗
08/17/2026M00517395-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)11
08/28/2026M00928919-P1Open ↗
08/27/2026M00517383-P3Open ↗
08/17/2026M00517395-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026M00928919-I1Open ↗
▸Other Documents6
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/27/2026M00517383-P3Open ↗
08/13/2026M00517383-P2Open ↗
08/13/2026M00517383-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWManufacturer's Specifications1
08/15/2026M01438550-I1Open ↗
▸DOB NOWCalculations1
08/15/2026M01438550-I1Open ↗