← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Stuypark Apartments
77 NEW YORK AVENUE · BIN 3030090
💬 Discuss this project
1975Year Built
11Stories
D1Building Class
R6Zoning
67,582 sfGross Floor Area
103Units
LL97 CoveredRent Stabilized14 Active Violations 13 unresolved · 1 paperwork only 1 likely answered 1 old, status unconfirmed ▸FISP: UNSAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Stuypark Housing · 24,200 sf lot · 2.79 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofShinda Management CorporationUnder Construction9p · 3 filings · 18 docs
CellarInstall new chimney liner7p · 2 filings · 20 docs
Site & exteriorShinda Management CorporationUnder Construction8p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Stuy Park Housing1403/22/2026
Malcolm X Apartments407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ivan Brice Architecture107/22/2025
Ashraf101/23/2023
New York & Company312/23/2020
New Age111/25/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company603/21/2026
AC Building Consultants203/21/2026
Rennon Construction103/21/2026
PS Engineers203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rennon ConstructionScaffold608/26/2026
Crossfield Plumbing & HeatingPlumbing607/08/2026
BK Construction ServicesScaffold310/06/2026
Guaranteed Home Improvemespecialty_contractor303/21/2026
Rock Group NYGeneral Contractor203/21/2026
RCD RestorationsGeneral Contractor103/21/2026
WKR ConstructionGeneral Contractor104/09/2026
Orion Plumbing & HeatingPlumbing103/21/2026
HI-Tech Heating SpecPlumbing103/21/2026
Bellet ConstructionGeneral Contractor103/21/2026
GKC IndustriesGeneral Contractor103/21/2026
1 R.S.General Contractor105/01/2013
Outdoor InstallationsGeneral Contractor212/11/2006
Rock ScaffoldingGeneral Contractor109/11/2012
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C.M. Testing Laboratory1352107/22/2025
New York Engineering Associates851212/23/2020
New Age Engineering7746111/25/2020
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
11/12/2026
Boiler inspection report filed
Initial · no defects · Accepted
10/05/2026
Permit renewed — Sidewalk Shed
Renewed with changes
B00809436-I1-SH
09/12/2026
Pedestrian protection does not meet code specifications. At the time of inspection observed at exp #2 north elevation defective/bulging and leaning…
ECB violation · open
07/31/2026
Signed off — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
B01266381-I1
192 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedBK Construction Services10/05/2026
DOB NOWSidewalk ShedPermit IssuedRennon Construction07/10/2026
DOB NOWSuspended ScaffoldSigned-offWKR Construction04/21/2026
DOB NOWSidewalk ShedPermit IssuedBK Construction Services04/14/2026
DOB NOWGeneral ConstructionPermit IssuedWKR Construction12/22/2025
DOB NOWSidewalk ShedPermit IssuedBK Construction Services04/21/2025
DOB NOWSidewalk ShedPermit IssuedRennon Construction01/02/2025
DOB NOWSidewalk ShedPermit IssuedRennon Construction01/10/2024
DOB NOWSidewalk ShedPermit IssuedRennon Construction01/24/2023
DOB NOWPlumbingPermit IssuedCrossfield Plumbing & Heating11/18/2021
DOB NOWBoiler EquipmentPermit IssuedCrossfield Plumbing & Heating11/18/2021
DOB NOWBoiler EquipmentPermit IssuedCrossfield Plumbing & Heating11/18/2021
DOB NOWBoiler EquipmentPermit IssuedCrossfield Plumbing & Heating12/23/2020
DOB NOWBoiler EquipmentPermit IssuedCrossfield Plumbing & Heating12/23/2020
DOB NOWPlumbingPermit IssuedCrossfield Plumbing & Heating12/18/2020
DOB NOWMechanical SystemsSigned-offGuaranteed Home Improveme11/26/2020
BISFBISSUEDHI-Tech Heating01/27/2016
BISFBISSUEDHI-Tech Heating11/05/2015
BISOTISSUEDGKC Industries06/17/2015
BISEQISSUEDRock Group NY04/14/2015
BISPLISSUEDOrion Plumbing & Heating03/30/2015
BISOTISSUEDGKC Industries03/27/2015
BISFBISSUEDHI-Tech Heating03/18/2015
BISPLISSUEDCrossfield Plumbing & Heating03/18/2015
BISOTISSUEDRCD Restorations04/04/2014
BISEQISSUEDRock Group NY03/27/2014
BISEQISSUEDRock Group NY05/01/2013
BISEQISSUEDRock Scaffolding09/11/2012
BISOTISSUEDBellet Construction03/07/2007
BISEQISSUEDOutdoor Installations12/11/2006
BISEQISSUEDOutdoor Installations08/17/2005
BISFBISSUEDLarry Berge05/13/2002
BISEQISSUEDSafway Steel Products10/05/1995
BISEQISSUEDSafway Steel Products07/28/1995
1 project · most recent 01/18/2023
FiledStatusContractorScope
01/18/2023Permit IssuedHigh Quality Electric—
1 project · most recent 01/23/2023
Sidewalk Shed
FiledStatusContractorScope
01/23/2023Permit IssuedBK Construction ServicesSidewalk Shed
1 project · most recent 07/22/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
07/22/2025Permit IssuedWKR ConstructionTenant Protection Plan 72 Hour
1 project · most recent 04/16/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/16/2026Signed-offWKR ConstructionSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
04/16/2026Alternative Materials - OTCR Buildings Bulletin NumberFRANCISCO PEREZspecial
07/16/2025Structural Stability – Alterations of existing buildingsJOHN SEMIOLIspecial
04/10/2024Energy Code Compliance InspectionsIvan Briceprogress
04/10/2024Tenant Protection Plan ComplianceJOHN SEMIOLIspecial
04/10/2024FinalIvan Briceprogress
12/21/2020Heating SystemsLOUIS ARENAspecial
12/21/2020HVAC and service water heating system controls LOUIS ARENAenergy_progress
12/21/2020HVAC and service water heating equipment LOUIS ARENAenergy_progress
12/21/2020Maintenance informationLOUIS ARENAenergy_progress
12/03/2020Energy Code Compliance InspectionsLOUIS ARENAprogress
91 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account