← Back
BROOKLYN
77 ST MARKS AVENUE
BROOKLYN · BIN 3028097
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
47 Open Violations ▸FDNY Report ↗
Flood zone X
Locations of Work
Structural
Bulkhead1p · 1 filing · 12 docs
Floor 31p · 1 filing · 12 docs
Floor 2
Floor 1
Basement1p · 1 filing · 12 docs
1 job · most recent 06/21/2026
Steel Wood
FiledStatusContractorScope
06/21/2026——Steel, Wood
1 job · most recent 08/28/2026
Fence
FiledStatusContractorScope
08/28/2026——Fence
Building Lifecycle
All (101)Filed (4)Violation (60)Objection (10)Special Inspection (27)
08/28/2026
Filed — Alteration
PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01452354-I1
07/21/2026
Objection resolved — Open
07/21/2026
Objection resolved — Open
07/17/2026
Special inspection requirement — Subgrade Inspections
07/17/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
07/15/2026
Objection raised — Other
07/15/2026
Objection raised — Other
06/21/2026
Filed — Alteration CO
ALT CO APPLICATION FILED FOR INTERIOR RENOVATION OF EXISTING 10-UNIT RESIDENTIAL BUILDING, CONVERT TO A 2-UNIT RESIDENTIAL BUILDING. APPLICATION. RENOVATION INCLUDES DEMOLISHING NON-BEARING INTERIOR WALLS
B01397894-S2
06/19/2026
Filed — Alteration CO
ALT CO APPLICATION FILED FOR INTERIOR RENOVATION OF EXISTING 10-UNIT RESIDENTIAL BUILDING, CONVERT TO A 2-UNIT RESIDENTIAL BUILDING. APPLICATION. RENOVATION INCLUDES DEMOLISHING NON-BEARING INTERIOR WALLS
B01397894-S1
06/19/2026
Objection resolved — Resolved
06/19/2026
Objection resolved — Resolved
06/19/2026
Objection resolved — Resolved
06/18/2026
Objection raised — Other
06/17/2026
Objection raised — Other
06/17/2026
Objection raised — Other
05/25/2026
Filed — Alteration CO
ALT CO APPLICATION FILED FOR INTERIOR RENOVATION OF EXISTING 10-UNIT RESIDENTIAL BUILDING, CONVERT TO A 2-UNIT RESIDENTIAL BUILDING. APPLICATION. RENOVATION INCLUDES DEMOLISHING NON-BEARING INTERIOR WALLS
B01397894-I1
05/25/2026
Special inspection requirement — Structural Steel - Details
05/25/2026
Special inspection requirement — Structural Wood Frame
05/25/2026
Special inspection requirement — Concrete - Cast-In-Place
05/25/2026
Special inspection requirement — Post-installed Anchors
05/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/25/2026
Special inspection requirement — Post-installed Anchors
05/25/2026
Special inspection requirement — Structural Steel - High Strength Bolting
05/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/25/2026
Special inspection requirement — Structural Steel - Welding
05/18/2026
Special inspection requirement — Interior lighting power
05/18/2026
Special inspection requirement — Air barrier - visual inspection
05/18/2026
Special inspection requirement — Final
05/18/2026
Special inspection requirement — Final
05/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/18/2026
Special inspection requirement — Footing and Foundation
05/18/2026
Special inspection requirement — Energy Code Compliance Inspections
05/18/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/18/2026
Special inspection requirement — Lighting controls
05/18/2026
Special inspection requirement — Insulation placement and R values
05/18/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/18/2026
Special inspection requirement — Lighting in dwelling units
05/18/2026
Special inspection requirement — Maintenance information
05/18/2026
Special inspection requirement — Metering
05/18/2026
Special inspection requirement — Fenestration air leakage
05/18/2026
Special inspection requirement — Fenestration areas
05/06/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, closed)
I
06/11/2025
Violation issued (HPD, open)
A
04/11/2024
Violation issued (HPD, open)
A
11/20/2023
Violation issued (HPD, closed)
I
03/27/2023
Violation issued (HPD, open)
A
11/09/2022
Violation issued (HPD, closed)
I
03/20/2022
Violation issued (HPD, open)
C
03/02/2022
Violation issued (HPD, closed)
A
09/08/2021
Violation issued (HPD, closed)
C
09/08/2021
Violation issued (HPD, open)
C
04/13/2021
Violation issued (HPD, closed)
A
07/30/2020
Violation issued (HPD, closed)
C
12/24/2019
Violation issued (HPD, closed)
B
12/24/2019
Violation issued (HPD, closed)
C
12/24/2019
Violation issued (HPD, closed)
C
12/24/2019
Violation issued (HPD, open)
B
12/24/2019
Violation issued (HPD, closed)
C
12/24/2019
Violation issued (HPD, closed)
B
Latest 60 of 101 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CANDOR CAPITAL ONE209/08/2026
DWELL 1 HOLDINGS LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AG ENGINEERING PLLC108/28/2026
ROBERT SIQECA PE206/21/2026
LESTER KATZ, NCARB105/25/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
07/17/2026Subgrade Inspections—special
07/17/2026Subsurface Investigations (Borings/Test Pits)—special
05/25/2026Structural Steel - Details—special
05/25/2026Structural Wood Frame—progress
05/25/2026Concrete - Cast-In-Place—special
05/25/2026Post-installed Anchors—special
05/25/2026Structural Stability – Alterations of existing buildings—special
05/25/2026Post-installed Anchors—special
05/25/2026Structural Steel - High Strength Bolting—special
05/25/2026Structural Stability – Alterations of existing buildings—special
05/25/2026Structural Steel - Welding—special
05/18/2026Interior lighting power—energy_progress
05/18/2026Air barrier - visual inspection—energy_progress
05/18/2026Final—progress
05/18/2026Final—progress
05/18/2026Fire-Resistant Penetrations and Joints—special
05/18/2026Footing and Foundation—progress
05/18/2026Energy Code Compliance Inspections—progress
05/18/2026Fire-Resistance Rated Construction—progress
05/18/2026Lighting controls—energy_progress
05/18/2026Insulation placement and R values—energy_progress
05/18/2026Fenestration and door U-factor and product ratings—energy_progress
05/18/2026Lighting in dwelling units—energy_progress
05/18/2026Maintenance information—energy_progress
05/18/2026Metering—energy_progress
Latest 25 of 27.
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/08/2026B01452354-I1Request digital key ↗
08/16/2026B01397894-S2Request digital key ↗
08/16/2026B01397894-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/08/2026B01452354-I1Open ↗
08/16/2026B01397894-S2Open ↗
08/16/2026B01397894-S1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/15/2026B01397894-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/16/2026B01397894-S1Open ↗
08/16/2026B01397894-S2Open ↗
08/15/2026B01397894-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/16/2026B01397894-S1Open ↗
▸DOB NOWSOIL REPORT1
08/16/2026B01397894-S1Open ↗