RoofUnder Construction7p · 4 filings · 20 docs
ArchitectureDMElectricalGeneralMechanicalPlumbingStructural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF 300 PSF SIDEWALK SHED, PIPE SCAFFOLD, PYLWOOD FENCE, NEEDLE BEAM, ROOF PROTECTION AND YODOSKS AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
22 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
2 documents · 3 drawing sheets
INTERIOR DEMOLITION IN PREPARATION OF FULL DEMOLITION OF BUILDING, FILED UNDER APPLICATION#M01180489-I1
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 22Under Construction2p · 1 filing · 20 docs
DM
Issued Permit Scope
Protection and Mechanical Methods
mechanical equipment to assist with demolition, and chute to be built on floors to lower debris
On file for this project
40 documents · 2 drawing sheets
Floor 21Under Construction1 filing · 20 docs
Issued Permit Scope
Protection and Mechanical Methods
mechanical equipment to assist with demolition, and chute to be built on floors to lower debris
On file for this project
40 documents
Floor 20Under Construction1 filing · 20 docs
Issued Permit Scope
Protection and Mechanical Methods
mechanical equipment to assist with demolition, and chute to be built on floors to lower debris
On file for this project
40 documents
Floor 19Under Construction1 filing · 20 docs
Issued Permit Scope
Protection and Mechanical Methods
mechanical equipment to assist with demolition, and chute to be built on floors to lower debris
On file for this project
40 documents
Floor 18Under Construction2 filings · 20 docs
Issued Permit Scope
Protection and Mechanical Methods
mechanical equipment to assist with demolition, and chute to be built on floors to lower debris
On file for this project
40 documents
Installation of Temporary Single Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents
Floor 17Under Construction2 filings · 20 docs
Issued Permit Scope
Protection and Mechanical Methods
mechanical equipment to assist with demolition, and chute to be built on floors to lower debris
On file for this project
40 documents
Installation of Temporary Single Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents
Floor 16Under Construction3p · 2 filings · 20 docs
ArchitectureGeneral
Issued Permit Scope
Protection and Mechanical Methods
mechanical equipment to assist with demolition, and chute to be built on floors to lower debris
On file for this project
40 documents · 3 drawing sheets
Installation of Temporary Single Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents
Floor 15Under Construction2 filings · 20 docs
Issued Permit Scope
Protection and Mechanical Methods
mechanical equipment to assist with demolition, and chute to be built on floors to lower debris
On file for this project
40 documents
Installation of Temporary Single Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents
Floor 14Under Construction2 filings · 20 docs
Issued Permit Scope
Protection and Mechanical Methods
mechanical equipment to assist with demolition, and chute to be built on floors to lower debris
On file for this project
40 documents
Installation of Temporary Single Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents
Floor 13Under Construction2 filings · 20 docs
Issued Permit Scope
Protection and Mechanical Methods
mechanical equipment to assist with demolition, and chute to be built on floors to lower debris
On file for this project
40 documents
Installation of Temporary Single Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents
Floor 12Under Construction2 filings · 20 docs
Issued Permit Scope
Protection and Mechanical Methods
mechanical equipment to assist with demolition, and chute to be built on floors to lower debris
On file for this project
40 documents
Installation of Temporary Single Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents
Floor 11Under Construction1p · 3 filings · 20 docs
DM
Issued Permit Scope
Protection and Mechanical Methods
mechanical equipment to assist with demolition, and chute to be built on floors to lower debris
On file for this project
40 documents
Installation of Temporary Single Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents
INTERIOR DEMOLITION IN PREPARATION OF FULL DEMOLITION OF BUILDING, FILED UNDER APPLICATION#M01180489-I1
On file for this project
6 documents · 1 drawing sheet
Floor 10Under Construction2 filings · 20 docs
Issued Permit Scope
Protection and Mechanical Methods
mechanical equipment to assist with demolition, and chute to be built on floors to lower debris
On file for this project
40 documents
Installation of Temporary Single Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents
Floor 9Under Construction2p · 3 filings · 20 docs
DM
Issued Permit Scope
Protection and Mechanical Methods
mechanical equipment to assist with demolition, and chute to be built on floors to lower debris
On file for this project
40 documents · 1 drawing sheet
Installation of Temporary Single Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents
INTERIOR DEMOLITION IN PREPARATION OF FULL DEMOLITION OF BUILDING, FILED UNDER APPLICATION#M01180489-I1
On file for this project
6 documents · 1 drawing sheet
Floor 8Under Construction5p · 3 filings · 20 docs
DMMechanical
Issued Permit Scope
Protection and Mechanical Methods
mechanical equipment to assist with demolition, and chute to be built on floors to lower debris
On file for this project
40 documents · 4 drawing sheets
Installation of Temporary Single Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents
INTERIOR DEMOLITION IN PREPARATION OF FULL DEMOLITION OF BUILDING, FILED UNDER APPLICATION#M01180489-I1
On file for this project
6 documents · 1 drawing sheet
Floor 7Under Construction5p · 3 filings · 20 docs
DMMechanical
Issued Permit Scope
Protection and Mechanical Methods
mechanical equipment to assist with demolition, and chute to be built on floors to lower debris
On file for this project
40 documents · 4 drawing sheets
Installation of Temporary Single Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents
INTERIOR DEMOLITION IN PREPARATION OF FULL DEMOLITION OF BUILDING, FILED UNDER APPLICATION#M01180489-I1
On file for this project
6 documents · 1 drawing sheet
Floor 6Under Construction1p · 3 filings · 20 docs
DM
Issued Permit Scope
Protection and Mechanical Methods
mechanical equipment to assist with demolition, and chute to be built on floors to lower debris
On file for this project
40 documents
Installation of Temporary Single Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents
INTERIOR DEMOLITION IN PREPARATION OF FULL DEMOLITION OF BUILDING, FILED UNDER APPLICATION#M01180489-I1
On file for this project
6 documents · 1 drawing sheet
Floor 5Under Construction1p · 3 filings · 20 docs
DM
Issued Permit Scope
Protection and Mechanical Methods
mechanical equipment to assist with demolition, and chute to be built on floors to lower debris
On file for this project
40 documents
Installation of Temporary Single Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents
INTERIOR DEMOLITION IN PREPARATION OF FULL DEMOLITION OF BUILDING, FILED UNDER APPLICATION#M01180489-I1
On file for this project
6 documents · 1 drawing sheet
Floor 4Under Construction1p · 3 filings · 20 docs
DM
Issued Permit Scope
Protection and Mechanical Methods
mechanical equipment to assist with demolition, and chute to be built on floors to lower debris
On file for this project
40 documents
Installation of Temporary Single Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents
INTERIOR DEMOLITION IN PREPARATION OF FULL DEMOLITION OF BUILDING, FILED UNDER APPLICATION#M01180489-I1
On file for this project
6 documents · 1 drawing sheet
Floor 3Under Construction8p · 5 filings · 20 docs
CivilDMFire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
mechanical equipment to assist with demolition, and chute to be built on floors to lower debris
On file for this project
40 documents · 3 drawing sheets
Installation of Temporary Single Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents
INTERIOR DEMOLITION IN PREPARATION OF FULL DEMOLITION OF BUILDING, FILED UNDER APPLICATION#M01180489-I1
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 2Under Construction5p · 3 filings · 20 docs
DMMechanical
Issued Permit Scope
Protection and Mechanical Methods
mechanical equipment to assist with demolition, and chute to be built on floors to lower debris
On file for this project
40 documents · 4 drawing sheets
Installation of Temporary Single Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents
INTERIOR DEMOLITION IN PREPARATION OF FULL DEMOLITION OF BUILDING, FILED UNDER APPLICATION#M01180489-I1
On file for this project
6 documents · 1 drawing sheet
Floor 1Under Construction5p · 5 filings · 20 docs
DMFire ProtectionPlumbing
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition, and chute to be built on floors to lower debris
On file for this project
40 documents
Installation of Temporary Single Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents
Filing for Temporary Standpipe conversion, Cut and Cap.
On file for this project
6 documents
Latest 3 of 5 filings on this floor.
Cellar9p · 3 filings · 20 docs
DMMechanical
INTERIOR DEMOLITION IN PREPARATION OF FULL DEMOLITION OF BUILDING, FILED UNDER APPLICATION#M01180489-I1
On file for this project
6 documents · 1 drawing sheet
REPLACEMENT OF TWO (2) CHILLED WATER COMPUTER ROOM AIR CONDITIONING (CRAC) UNITS WITH NEW, INCLUDING NEW PIPING TRIM. NO CHANGE IN THE BUILDING'S EGRESS, USE OR OCCUPANCY.
On file for this project
14 documents · 6 drawing sheets
REPLACEMENT OF TWO (2) CHILLED WATER COMPUTER ROOM AIR CONDITIONING (CRAC) UNITS WITH NEW, INCLUDING NEW PIPING TRIM. NO CHANGE IN THE BUILDING'S EGRESS, USE OR OCCUPANCY.
On file for this project
21 documents · 2 drawing sheets