← Back
Factory, heavy manufacturing, fireproof
770 5 AVENUE
BROOKLYN · BIN 3009768
💬 Discuss this project
1951Year Built
1Stories
F1Building Class
M1-1DZoning
19,370 sfGross Floor Area
1Units
4 Open Violations 3 unresolved · 1 paperwork only ▸
Factory, heavy manufacturing, fireproof · Owner of record: 770 FRAME LLC · 21,540 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 2 filings · 20 docs
Floor 12p · 1 filing · 20 docs
Mezzanine1p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
770 FRAME LLC603/22/2026
LEFFERTS PROPERTY HOLDINGS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
R & O ENGINEERING308/11/2026
BLACK SHEEP ENGINEERING GROUP205/15/2026
SIDERIS KEFALAS ENGINEERS PC204/21/2026
NIKOLAI KATZ ARCHITECT303/25/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CS BRIDGE CORPGeneral Contractor207/08/2026
Building Lifecycle
All (98)Filed (10)Permit Issued (2)Violation (9)Inspection (3)Objection (44)Special Inspection (30)
08/11/2026
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01061231-I1
B01061231-S9
08/11/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/11/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
08/11/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
08/11/2026
Special inspection requirement — Subgrade Inspections
08/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/17/2026
Objection resolved — Resolved
06/18/2026
Objection resolved — Addressed
06/12/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/12/2026
Objection resolved — Addressed
06/12/2026
Objection resolved — Addressed
06/07/2026
Objection resolved — Addressed
05/26/2026
Objection resolved — Addressed
05/26/2026
Objection resolved — Addressed
05/26/2026
Objection resolved — Addressed
05/18/2026
Permit issued — Supported Scaffold
B01393382-I1-SF
05/18/2026
Permit issued — Protection and Mechanical Methods
B01393410-I1-PMM
05/16/2026
Special inspection requirement — Air barrier — testing
05/16/2026
Special inspection requirement — Fenestration air leakage
05/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/16/2026
Special inspection requirement — Lighting in dwelling units
05/16/2026
Special inspection requirement — Fenestration areas
05/16/2026
Special inspection requirement — Lighting controls
05/16/2026
Special inspection requirement — Electrical motors and elevators
05/16/2026
Special inspection requirement — Maintenance information
05/16/2026
Special inspection requirement — Air barrier - visual inspection
05/16/2026
Special inspection requirement — Energy Code Compliance Inspections
05/16/2026
Special inspection requirement — Interior lighting power
05/16/2026
Special inspection requirement — Insulation placement and R values
05/16/2026
Special inspection requirement — Metering
05/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/16/2026
Special inspection requirement — Exterior lighting power
05/15/2026
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01393382-I1
05/15/2026
Filed — Alteration
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01393410-I1
05/09/2026
Objection resolved — Addressed
05/08/2026
Objection resolved — Addressed
05/07/2026
Objection raised — Other
04/28/2026
Objection resolved — Addressed
04/28/2026
Objection resolved — Addressed
04/27/2026
Objection resolved — Addressed
04/24/2026
Objection raised — Other
04/24/2026
Objection raised — Admin
04/24/2026
Objection raised — Structural
04/24/2026
Objection raised — Structural
04/24/2026
Objection raised — Other
04/24/2026
Objection raised — Structural
04/24/2026
Objection raised — Structural
04/23/2026
Objection raised — Admin
04/23/2026
Objection raised — Other
04/23/2026
Objection raised — Cost
04/23/2026
Objection raised — Inspections
04/21/2026
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01061231-I1
B01061231-S4
04/21/2026
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01061231-I1
B01061231-S5
04/21/2026
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01061231-I1
B01061231-S7
04/21/2026
Objection resolved — Addressed
04/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/19/2026
Special inspection requirement — Shutoff dampers
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedCS BRIDGE CORP05/18/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCS BRIDGE CORP05/18/2026
BISMHISSUEDABIED CONSTRUCTION INC06/23/2017
BISPLISSUEDBAY RIDGE P & H INC03/11/1997
BISMHISSUEDGENERAL CRAFT, INC.03/07/1997
1 project · most recent 08/11/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/11/2026——Heating and Air Conditioning Systems
Heat / Cool
Carrier 48GEFT28M6M5-3XNQ0 400,000 BTU · Rooftop Unit ×4
Daikin RXM12WVJU9 14,975 BTU · Condensing Unit ×2
RXF24BVJU9 24,000 BTU · Condensing Unit ×1
1 project · most recent 08/11/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/11/2026——Gas, Storm, Water/Sanitary
1 project · most recent 05/18/2026
FiledStatusContractorScope
05/18/2026Permit IssuedNASH ELECTRIC SERVICES IN—
1 project · most recent 08/11/2026
Steel Concrete
FiledStatusContractorScope
08/11/2026——Steel, Concrete
2 projects · most recent 08/11/2026
Fence Sidewalk Shed Scaffold
FiledStatusContractorScope
08/11/2026——Fence, Sidewalk Shed
05/15/2026Permit IssuedCS BRIDGE CORPScaffold
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/12/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/12/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
08/11/2026Subsurface Conditions – Fill Placement & In-Place Density—special
08/11/2026Subsurface Investigations (Borings/Test Pits)—special
08/11/2026Excavations - Sheeting, Shoring, and Bracing—special
08/11/2026Subgrade Inspections—special
08/04/2026Structural Stability – Alterations of existing buildings—special
05/16/2026Insulation placement and R values—energy_progress
05/16/2026Air barrier - visual inspection—energy_progress
05/16/2026Metering—energy_progress
05/16/2026Interior lighting power—energy_progress
05/16/2026Lighting controls—energy_progress
05/16/2026Fenestration and door U-factor and product ratings—energy_progress
05/16/2026Air barrier — testing —energy_progress
05/16/2026Electrical motors and elevators—energy_progress
05/16/2026Energy Code Compliance Inspections—progress
05/16/2026Fire-Resistance Rated Construction—progress
05/16/2026Fire-Resistant Penetrations and Joints—special
05/16/2026Fenestration air leakage—energy_progress
05/16/2026Maintenance information—energy_progress
05/16/2026Lighting in dwelling units—energy_progress
05/16/2026Exterior lighting power—energy_progress
05/16/2026Fenestration areas—energy_progress
04/19/2026HVAC-R and service water heating system controls—energy_progress
04/19/2026Shutoff dampers—energy_progress
04/19/2026Fire-Resistant Penetrations and Joints—special
04/19/2026Duct leakage testing, insulation and design—energy_progress
Latest 25 of 61.
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/17/2026B01061231-S3Request digital key ↗
08/17/2026B01061231-S8Request digital key ↗
08/17/2026B01061231-S5Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION6
08/16/2018321038202Open ↗
06/28/2018321038202Open ↗
05/29/2018321038202Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION1
06/26/2017321603573Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/17/2026B01061231-S4Open ↗
08/17/2026B01061231-S3Open ↗
08/17/2026B01061231-P1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/26/2017321603573Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/26/2017321603573Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/26/2017321603573Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/16/2014321038202Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/15/2026B01061231-P1Open ↗
08/14/2026B01061231-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/17/2026B01061231-S6Open ↗
08/17/2026B01061231-S9Open ↗
08/17/2026B01061231-S5Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/26/2017321603573Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/26/2017321603573Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/17/2026B01061231-S9Open ↗
08/14/2026B01061231-S4Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/14/2026B01061231-S4Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSCHEDULE A - OCCUPANCY / USE2
08/16/2018321038202Open ↗
12/16/2014321038202Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/16/2014321038202Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/26/2017321603573Open ↗
12/16/2014321038202Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET4
06/28/2018321038202Open ↗
04/30/2018321038202Open ↗
06/23/2017321603573Open ↗
Showing 3 of 4 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/15/2026B01061231-P1Open ↗
08/14/2026B01061231-I1Open ↗
▸BISPLOT DIAGRAM1
12/16/2014321038202Open ↗