← Back
Primarily 2 family with 1 store or office
770 METROPOLITAN AVENUE
BROOKLYN · BIN 3068893
💬 Discuss this project
1901Year Built
2Stories
S2Building Class
R7AZoning
2,288 sfGross Floor Area
3Units
2 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 2,500 sf lot · 0.92 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.109/29/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DOMINICK SIANO G'NL CONTGeneral Contractor203/21/2026
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (4)Special Inspection (2)
12/26/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/29/2021
Signed off — Alteration
INSTALL NEW BOILER ROOM ENCLOSURE FOR REPLACEMENT BOILER INSTALLED UNDER LAA APPLICATION No. B00443812-I1-LA. THESE PLANS AND APPLICATION ARE SUBMITTED IN RESPONSE TO NYC DOB OPEN OBJECTION DATED 7/22/21. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00590110-I1
10/07/2021
Permit issued — General Construction
B00590110-I1-GC
09/29/2021
Filed — Alteration
INSTALL NEW BOILER ROOM ENCLOSURE FOR REPLACEMENT BOILER INSTALLED UNDER LAA APPLICATION No. B00443812-I1-LA. THESE PLANS AND APPLICATION ARE SUBMITTED IN RESPONSE TO NYC DOB OPEN OBJECTION DATED 7/22/21. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00590110-I1
09/08/2021
Special inspection requirement — Fire-Resistance Rated Construction
Joseph Bazini
09/08/2021
Special inspection requirement — Final
Joseph Bazini
07/22/2021
Violation issued (ECB, closed)
Plumbing
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offDOMINICK SIANO G'NL CONT10/07/2021
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
09/08/2021Fire-Resistance Rated ConstructionJoseph Baziniprogress
09/08/2021FinalJoseph Baziniprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
09/01/2026B00590110-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B00590110-I1Open ↗
08/23/2026B00590110-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
09/01/2026B00590110-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWOER: Notice of Satisfaction1
09/01/2026B00590110-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/01/2026B00590110-I1Open ↗
▸DOB NOWOER: Notice to Proceed1
09/01/2026B00590110-I1Open ↗