ECB11/07/2014MISC.VIO.3314.1 SUPPORTED SCAFFOLD DOES NOT MEET BLDG CODE SPECIFICATIONS,(STOP ALL WORK)NOTED:@ TIME OF INSPEC.SUPPORTED SCAFFOLD WAS INSTALLED ON EXP.#2.SCAFFOLDING WAS SET UP UNDER ELECTRICAL WIRES(MAIN FEEDNothing owed — awaiting certificate of correction
ECB11/07/2014MIS.VIO 3314.5.5 SUPPORTED SCAFFOLD DOES NOT MEET BLDG CODE SPECIFICATIONS, (STOP ALL WORK).NOTED:@TIME OFINSPEC.SUPPORTED SCAFFOLD WAS INSTALLED ON EXP.#2.PLANKING/WORK PLATFORMW ERE NOT TIED DOWN/SECURED TNothing owed — awaiting certificate of correction
ECB11/07/2014MISC.VIO.SUPPORTED SCAFOLD DOES NOT MEET BLDG CODE SPECIFICATIONS,(STOP ALL WORK).NOTED:@ TIME OF INSPEC.SUPPORTED SCAFFOLD WAS INSTALL ON EXP.#2 WITH INADEQUATE GUARDRAIL SYSTEM(WORK IN PROGRESS)THE FOLLOWINothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 2,400 sf lot · 0.65 FAR built · Flood zone X