← Back
BuildNYC
One family attached or semi-detached
7716 10TH AVENUE
BROOKLYN · Dyker Heights · BIN 3150038
💬 Discuss this project
1925Year Built
2Stories
A5Building Class
R4-1Zoning
1,344 sfGross Floor Area
1Units
One family attached or semi-detached · 1,900 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Cellar, 1st, and 2nd floor renovation10p · 2 filings · 14 docs
Floor 1Cellar, 1st, and 2nd floor renovation11p · 2 filings · 14 docs
CellarCellar, 1st, and 2nd floor renovation15p · 2 filings · 14 docs
Site & exteriorCellar, 1st, and 2nd floor renovation8p · 2 filings · 14 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/26/2025$1.3M—Private party → Private party$967/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Paul Engineering Inspection (Pei) Consultants707/06/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kale ConstructionGeneral Contractor104/09/2026
John Fitzgerald Plumbing & HeatingPlumbing107/08/2026
Building Lifecycle
07/30/2026
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; RESURFACE EXTERIOR BRICK WALL WITH STUCCO. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01348539-I1
07/06/2026
Filed — Alteration
RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; RESURFACE EXTERIOR BRICK WALL WITH STUCCO. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01348539-P3
07/03/2026
Filed — Alteration
RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH PLUMBING WORK:REPLACE KITCHEN AND RELOCATE BATHROOM FIXTURES; NEW 2-PC RESTROOM,WASHER,DRYER, BOILER AND HOT WATER HEATER IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01348540-P2
07/03/2026
Filed — Alteration
RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; RESURFACE EXTERIOR BRICK WALL WITH STUCCO. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01348539-P2
04/21/2026
Filed — Alteration
RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH PLUMBING WORK:REPLACE KITCHEN AND RELOCATE BATHROOM FIXTURES; NEW 2-PC RESTROOM,WASHER,DRYER, BOILER AND HOT WATER HEATER IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01348540-P1
10 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating01/27/2026
DOB NOWGeneral ConstructionSigned-offKale Construction01/22/2026
1 project · most recent 07/03/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/03/2026Signed-offJohn Fitzgerald Plumbing & HeatingGas, Water/Sanitary
1 project · most recent 07/24/2026
General Wiring
FiledStatusContractorScope
07/24/2026CompleteR & T ElectricalGeneral Wiring
Nothing on file for this building.
14 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account