Walk-up apt, over six families with stores
168 SOUTH 3 STREET
BROOKLYN · Williamsburg · BIN 3321297
💬 Discuss this project
1910Year Built
4Stories
C7Building Class
R6Zoning
9,130 sfGross Floor Area
8Units
Rent Stabilized8 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 3 COVERT LLC · 3,358 sf lot · 2.72 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 41p · 1 filing · 10 docs
Floor 36p · 2 filings · 20 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EVERGREEN-15807/08/2026
3 COVERT LLC403/22/2026
SOUTH SIDE HOUSING COR103/22/2026
3 CONVERT LLC103/22/2026
SCHIFF 774 DRIGGS CORP103/22/2026
H&B CONSTRUCTION INC.103/21/2026
SOUTHSIDE UNITED HOUSING DFC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HWL ENGINEERING PC111/12/2025
SUSTAINABLE DESIGN ENGINEERING PLLC1004/01/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YOUBER DESIGN2003/21/2026
ZL BUILDING ASSOCIATE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IMPACT BUILDERS CORPGeneral Contractor507/08/2026
IRVING BAPTISTEElectrical103/21/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SUSTAINABLE DESIGN ENGINE1404604/01/2024
Building Lifecycle
All (143)Filed (11)Permit Issued (6)Signed Off (4)Violation (56)Inspection (7)Objection (40)Special Inspection (19)
02/16/2026
Violation issued (HPD, open)
B
02/16/2026
Violation issued (HPD, open)
C
02/16/2026
Violation issued (HPD, open)
B
02/16/2026
Violation issued (HPD, closed)
C
02/16/2026
Violation issued (HPD, closed)
C
02/16/2026
Violation issued (HPD, closed)
C
02/16/2026
Violation issued (HPD, open)
C
12/31/2025
Objection resolved — Resolved
11/18/2025
Objection raised — Other
11/12/2025
Filed — Alteration
B01318250-I1
10/06/2025
Violation issued (ECB, closed)
Construction
10/06/2025
Violation issued (ECB, closed)
Construction
12/04/2024
Signed off — Alteration
REPLACE PLUMBING FIXTURES W/ NEW AT EXISTING ROUGHING (1 WC, 1 SINK), RELOCATE PLUMBING FIXTURES W/ NEW (1 LAV), INSTALL NEW PLUMBING FIXTURES (1 WC, 1 LAV, 1 SHOWER, 1 DW, 1 W/M, 2 F.D), CAP & REMOVE (1 TUB) ON APT 5 ON 3RD FLOOR. NO WORK ON APT #3 ON 2N
B00925935-I1
11/26/2024
Violation issued (HPD, closed)
I
11/20/2024
Signed off — Alteration
REPLACE PLUMBING FIXTURES W/ NEW AT EXISTING ROUGHING (1 WC, 1 SINK), RELOCATE PLUMBING FIXTURES W/ NEW (1 LAV), INSTALL NEW PLUMBING FIXTURES (1 WC, 1 LAV, 1 SHOWER, 1 DW, 1 W/M, 2 F.D), CAP & REMOVE (1 TUB) ON APT 5 ON 3RD FLOOR. NO WORK ON APT #3 ON 2N
B00925935-S1
11/04/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/09/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/28/2024
Permit issued — Plumbing
B00925935-S1-PL
04/16/2024
Violation issued (HPD, closed)
A
04/01/2024
Filed — Alteration
REPLACE PLUMBING FIXTURES W/ NEW AT EXISTING ROUGHING (1 WC, 1 SINK), RELOCATE PLUMBING FIXTURES W/ NEW (1 LAV), INSTALL NEW PLUMBING FIXTURES (1 WC, 1 LAV, 1 SHOWER, 1 DW, 1 W/M, 2 F.D), CAP & REMOVE (1 TUB) ON APT 5 ON 3RD FLOOR. NO WORK ON APT #3 ON 2N
B00925935-P4
04/01/2024
Filed — Alteration
REPLACE PLUMBING FIXTURES W/ NEW AT EXISTING ROUGHING (1 WC, 1 SINK), RELOCATE PLUMBING FIXTURES W/ NEW (1 LAV), INSTALL NEW PLUMBING FIXTURES (1 WC, 1 LAV, 1 SHOWER, 1 DW, 1 W/M, 2 F.D), CAP & REMOVE (1 TUB) ON APT 5 ON 3RD FLOOR. NO WORK ON APT #3 ON 2N
B00925935-P3
03/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kenny Mak
03/29/2024
Special inspection requirement — Lighting in dwelling units
Kenny Mak
03/29/2024
Special inspection requirement — Final
Shamsul Siddique
03/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Kenny Mak
03/22/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
02/29/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/03/2024
Permit issued — Plumbing
B00925935-S1-PL
12/11/2023
Filed — Alteration
REPLACE PLUMBING FIXTURES W/ NEW AT EXISTING ROUGHING (1 WC, 1 SINK), RELOCATE PLUMBING FIXTURES W/ NEW (1 LAV), INSTALL NEW PLUMBING FIXTURES (1 WC, 1 LAV, 1 SHOWER, 1 DW, 1 W/M, 2 F.D), CAP & REMOVE (1 TUB) ON APT 5 ON 3RD FLOOR. NO WORK ON APT #3 ON 2N
B00925935-P1
12/11/2023
Filed — Alteration
REPLACE PLUMBING FIXTURES W/ NEW AT EXISTING ROUGHING (1 WC, 1 SINK), RELOCATE PLUMBING FIXTURES W/ NEW (1 LAV), INSTALL NEW PLUMBING FIXTURES (1 WC, 1 LAV, 1 SHOWER, 1 DW, 1 W/M, 2 F.D), CAP & REMOVE (1 TUB) ON APT 5 ON 3RD FLOOR. NO WORK ON APT #3 ON 2N
B00925935-P2
11/30/2023
Special inspection requirement — Energy Code Compliance Inspections
Kenny Mak
11/30/2023
Special inspection requirement — Lighting in dwelling units
Kenny Mak
11/30/2023
Special inspection requirement — Final
Shamsul Siddique
11/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kenny Mak
10/26/2023
Permit issued — Structural
B00925935-I1-GC-CX
10/10/2023
Objection resolved — Addressed
10/10/2023
Objection resolved — Addressed
10/10/2023
Objection resolved — Addressed
10/10/2023
Objection resolved — Addressed
10/03/2023
Objection resolved — Addressed
09/19/2023
Objection raised — Cost
09/15/2023
Objection resolved — Addressed
09/13/2023
Objection raised — Scope
09/12/2023
Objection raised — Inspections
09/12/2023
Objection raised — Admin
09/12/2023
Objection raised — Scope
09/12/2023
Objection raised — Scope
09/06/2023
Filed — Alteration
REPLACE PLUMBING FIXTURES W/ NEW AT EXISTING ROUGHING (1 WC, 1 SINK), RELOCATE PLUMBING FIXTURES W/ NEW (1 LAV), INSTALL NEW PLUMBING FIXTURES (1 WC, 1 LAV, 1 SHOWER, 1 DW, 1 W/M, 2 F.D), CAP & REMOVE (1 TUB) ON APT 5 ON 3RD FLOOR. NO WORK ON APT #3 ON 2N
B00925935-I1
09/06/2023
Filed — Alteration
REPLACE PLUMBING FIXTURES W/ NEW AT EXISTING ROUGHING (1 WC, 1 SINK), RELOCATE PLUMBING FIXTURES W/ NEW (1 LAV), INSTALL NEW PLUMBING FIXTURES (1 WC, 1 LAV, 1 SHOWER, 1 DW, 1 W/M, 2 F.D), CAP & REMOVE (1 TUB) ON APT 5 ON 3RD FLOOR. NO WORK ON APT #3 ON 2N
B00925935-S1
05/26/2023
Permit issued — General Construction
B00854169-I1-GC
05/10/2023
Objection resolved — Addressed
05/10/2023
Objection resolved — Addressed
05/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kenny Mak
05/10/2023
Special inspection requirement — Energy Code Compliance Inspections
Kenny Mak
05/09/2023
Objection resolved — Addressed
05/08/2023
Objection raised — Inspections
05/08/2023
Objection raised — Inspections
05/08/2023
Objection raised — Energy
05/08/2023
Objection resolved — Addressed
05/08/2023
Objection raised — Structural
Latest 60 of 143 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN05/28/2024
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC01/03/2024
DOB NOWStructuralSigned-offIMPACT BUILDERS CORP10/26/2023
DOB NOWGeneral ConstructionPermit IssuedIMPACT BUILDERS CORP05/26/2023
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT01/09/2023
DOB NOWGeneral ConstructionSigned-offIMPACT BUILDERS CORP12/07/2022
BISFPISSUEDMASTER FIRE SYSTEMS, INC10/04/2011
BISPLISSUEDC.W.C. FIRE SUPPRESSION07/13/2011
BISOTISSUEDCWC PLUMBING & HTG LLC07/13/2011
BISEQISSUEDB H & B CONSTRUCTION INC05/23/2011
BISEQISSUEDH & B CONSTRUCTION NY INC12/23/2010
BISEQISSUEDL & B CONSTRUCTION NY INC06/01/2001
BISFSISSUEDA&C COMBUSTION SERVICES02/22/1996
BISBLISSUEDA&C COMBUSTION SERVICES02/15/1996
1 project · most recent 05/05/2023
Gas Water/Sanitary
FiledStatusContractorScope
05/05/2023——Gas, Water/Sanitary
2 projects · most recent 12/04/2023
General Wiring
FiledStatusContractorScope
12/04/2023CompleteC & A ELECTRICAL CORPGeneral Wiring
12/14/2022CompleteINFINITI ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/22/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
02/29/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/22/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/20/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
03/29/2024Fire-Resistant Penetrations and JointsKenny Makspecial
03/29/2024Lighting in dwelling unitsKenny Makenergy_progress
03/29/2024FinalShamsul Siddiqueprogress
03/29/2024Energy Code Compliance InspectionsKenny Makprogress
11/30/2023Energy Code Compliance InspectionsKenny Makprogress
11/30/2023Lighting in dwelling unitsKenny Makenergy_progress
11/30/2023FinalShamsul Siddiqueprogress
11/30/2023Fire-Resistant Penetrations and JointsKenny Makspecial
05/10/2023Fire-Resistant Penetrations and JointsKenny Makspecial
05/10/2023Energy Code Compliance InspectionsKenny Makprogress
04/28/2023Fire-Resistance Rated ConstructionKenny Makprogress
04/03/2023Lighting in dwelling unitsKenny Makenergy_progress
04/03/2023Fire-Resistant Penetrations and JointsKenny Makspecial
04/03/2023FinalShamsul Siddiqueprogress
04/03/2023Energy Code Compliance InspectionsKenny Makprogress
03/17/2022Energy Code Compliance InspectionsKenny Makprogress
03/17/2022Lighting in dwelling unitsKenny Makenergy_progress
03/17/2022FinalMansoor Khanprogress
03/17/2022Fire-Resistant Penetrations and JointsKenny Makspecial
▾Documents — 84 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/28/2026B00701236-S1Request digital key ↗
08/25/2026B00925935-S1Request digital key ↗
08/25/2026B00925935-P4Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits12
▸BISWORK PERMIT APPLICATION7
10/08/2011320329079Open ↗
07/21/2011320329079Open ↗
07/21/2011320329079Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
06/14/2022320329079Open ↗
06/07/2022320329079Open ↗
04/29/2019320329079Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature13
08/26/2026B00925935-P1Open ↗
08/26/2026B00925935-P1Open ↗
08/26/2026B00925935-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026B00854169-S1Open ↗
08/27/2026B00854169-I1Open ↗
08/25/2026B00925935-P4Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
10/08/2011320329079Open ↗
07/21/2011320329079Open ↗
05/26/2011320310828Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/26/2026B00925935-P1Open ↗
08/25/2026B00925935-P3Open ↗
08/24/2026B00701236-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
05/26/2011320310828Open ↗
09/08/2010320214157Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/26/2011320310828Open ↗
09/08/2010320214157Open ↗
▸Trade Schedules & Equipment5
▸BISSELF-CERT PLUMBING NOTICE5
11/20/2011320329079Open ↗
11/03/2011320329079Open ↗
10/25/2011320329079Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/25/2026B00925935-P4Open ↗
08/25/2026B00925935-P3Open ↗
08/25/2026B00925935-P2Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/26/2011320310828Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/08/2010320214157Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY1
07/21/2011320329079Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
05/26/2011320310828Open ↗
09/08/2010320214157Open ↗
▸BISSHED LETTER1
12/30/2010320214157Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
05/26/2011320310828Open ↗
09/08/2010320214157Open ↗
▸Other Documents1
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
11/03/2011320329079Open ↗