← Back
Over six families without stores
775 BLAKE AVENUE
BROOKLYN · BIN 3089649
💬 Discuss this project
1930Year Built
4Stories
C1Building Class
R6Zoning
13,600 sfGross Floor Area
12Units
Rent Stabilized23 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: US BROWNSVILLE 11 HOUSING DEVELOPMENT FU ND CORP · 3,800 sf lot · 3.58 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 6 docs
Floor 11p · 1 filing · 5 docs
Cellar1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A TAHER CONTRACTING507/08/2026
ALL EMPIRE BUILDING CONTRACTORS INC1103/22/2026
US BROWNSVILLE 11, HDFC503/22/2026
US BROWNSVILLE 11 HOUSING DEVELOPMENT FU ND CORP203/22/2026
US BROWNSVILLE II HDFC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BANGASH ASSOCIATES INC.107/18/2024
HC ARCHITECT, PC208/12/2023
SYED ENGINEERING, P.C.201/28/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CH CORNERSTONE DESIGN203/21/2026
SHEIKH EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL EMPIRE BUILDING CONGeneral Contractor903/21/2026
A TAHER CONTRACTING CO INGeneral Contractor407/08/2026
JOHNNY'S P&H CONTRAC INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BANGASH ASSOCIATES INC8488107/18/2024
BEYOND ARCH LLC3600208/12/2023
Building Lifecycle
All (82)Filed (5)Permit Issued (7)Signed Off (2)Violation (60)Inspection (3)Special Inspection (5)
11/18/2025
Violation issued (HPD, closed)
I
06/04/2025
Violation issued (HPD, closed)
B
06/04/2025
Violation issued (HPD, closed)
C
09/13/2024
Permit issued — General Construction
B01082674-I1-GC
07/23/2024
Permit issued — General Construction
B01082674-I1-GC
07/18/2024
Filed — Alteration
B01082674-I1
07/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAZAL BANGASH
07/17/2024
Special inspection requirement — Final
FAZAL BANGASH
12/19/2023
Violation issued (HPD, open)
B
12/19/2023
Violation issued (HPD, closed)
A
12/19/2023
Violation issued (HPD, open)
B
12/19/2023
Violation issued (HPD, open)
B
12/19/2023
Violation issued (HPD, open)
B
12/19/2023
Violation issued (HPD, closed)
A
12/19/2023
Violation issued (HPD, open)
B
12/19/2023
Violation issued (HPD, open)
B
12/19/2023
Violation issued (HPD, open)
B
12/19/2023
Violation issued (HPD, open)
B
12/11/2023
Violation issued (HPD, closed)
C
12/11/2023
Violation issued (HPD, closed)
C
12/08/2023
Signed off — Alteration
REPLACEMENT OF HOT WATER HEATER ON CELLAR FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00917267-I1
09/27/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/22/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/22/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/12/2023
Permit issued — Plumbing
B00917267-I1-PL
08/12/2023
Filed — Alteration
REPLACEMENT OF HOT WATER HEATER ON CELLAR FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00917267-I1
06/26/2023
Violation issued (HPD, open)
I
06/22/2023
Violation issued (ECB, closed)
Unknown
06/21/2023
Violation issued (HPD, closed)
C
06/21/2023
Violation issued (HPD, open)
C
06/21/2023
Violation issued (HPD, open)
C
06/21/2023
Violation issued (HPD, open)
C
06/21/2023
Violation issued (HPD, closed)
C
06/21/2023
Violation issued (HPD, closed)
B
06/21/2023
Violation issued (HPD, closed)
C
06/21/2023
Violation issued (HPD, closed)
C
06/21/2023
Violation issued (HPD, closed)
C
06/21/2023
Violation issued (HPD, open)
C
06/21/2023
Violation issued (HPD, closed)
C
01/18/2023
Violation issued (HPD, open)
B
01/09/2023
Violation issued (HPD, open)
C
01/09/2023
Violation issued (HPD, closed)
C
10/27/2022
Violation issued (HPD, closed)
B
10/27/2022
Violation issued (HPD, closed)
A
10/27/2022
Violation issued (HPD, closed)
C
10/27/2022
Violation issued (HPD, closed)
C
10/27/2022
Violation issued (HPD, closed)
C
10/27/2022
Violation issued (HPD, closed)
A
10/27/2022
Violation issued (HPD, closed)
A
10/27/2022
Violation issued (HPD, closed)
A
10/27/2022
Violation issued (HPD, open)
B
10/27/2022
Violation issued (HPD, open)
B
10/21/2022
Violation issued (HPD, closed)
C
10/21/2022
Violation issued (HPD, open)
B
10/21/2022
Violation issued (HPD, closed)
C
10/21/2022
Violation issued (HPD, closed)
B
10/21/2022
Violation issued (HPD, closed)
B
10/21/2022
Violation issued (HPD, closed)
B
02/23/2022
Violation issued (HPD, closed)
A
12/27/2021
Violation issued (HPD, closed)
C
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedA TAHER CONTRACTING CO IN09/13/2024
DOB NOWGeneral ConstructionPermit IssuedA TAHER CONTRACTING CO IN07/23/2024
DOB NOWPlumbingSigned-offJOHNNY NANHU09/12/2023
DOB NOWSidewalk ShedPermit IssuedALL EMPIRE BUILDING CON06/02/2021
DOB NOWGeneral ConstructionSigned-offA TAHER CONTRACTING CO IN02/08/2021
DOB NOWSupported ScaffoldPermit IssuedALL EMPIRE BUILDING CON02/01/2021
DOB NOWSidewalk ShedPermit IssuedALL EMPIRE BUILDING CON01/29/2021
3 projects · most recent 07/27/2023
General Wiring
FiledStatusContractorScope
07/27/2023Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
06/19/2023Permit IssuedALL WAYS ELECTRIC CORP.W—
02/04/2021Permit IssuedRICHARD NEU—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/22/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/17/2024Fire-Resistant Penetrations and JointsFAZAL BANGASHspecial
07/17/2024FinalFAZAL BANGASHprogress
01/08/2021Structural Stability – Alterations of existing buildingsHackjong Choispecial
01/08/2021Energy Code Compliance InspectionsHackjong Choiprogress
01/08/2021Air barrier - visual inspectionHackjong Choienergy_progress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch2
08/27/2026B00917267-I1Request digital key ↗
08/24/2026B01082674-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00450262-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/01/2026B00460242-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/01/2026B00460245-I1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00450262-I1Open ↗
09/01/2026B00460242-I1Open ↗
09/01/2026B00460245-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026B00450262-I1Open ↗
08/26/2026B00450262-I1Open ↗
08/25/2026B01082674-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026B00450262-I1Open ↗
08/25/2026B01082674-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026B01082674-I1Open ↗
08/13/2026B00917267-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00450262-I1Open ↗