← Back
Elevator apt, fireproof with stores
777 6th Avenue Apartments
777 AVENUE OF THE AMER · Midtown South-Flatiron-Union Square · BIN 1015045
💬 Discuss this project
2000Year Built
31Stories
D6Building Class
C6-4XZoning
269,947 sfGross Floor Area
297Units
LL97 CoveredRent Stabilized11 Open Violations 10 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator apt, fireproof with stores · Owner of record: 777 SIXTH AVENUE OWNER LLC · 15,677 sf lot · 17.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneral
Floor 223p · 1 filing · 16 docs
Floor 115p · 1 filing · 20 docs
Site & exterior3p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EQUITY RESIDENTIAL2007/08/2026
PSH REALTY CORP HEW RAD REALTY303/21/2026
PHS - HEW DUB LLC C O MACKLOWE M203/21/2026
PSH REALTY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIRO STUDIO LLC205/09/2025
METHOD ARCHITECTS PLLC412/03/2024
KZ ENGINEERING, P.C105/30/2023
GANNETT FLEMING103/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.1403/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SELECT COMMERCIAL CONSTR*General Contractor1207/08/2026
SPK/LEWIS CONSTRUCTION LLGeneral Contractor307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYNERGY ENGINEERING784805/09/2025
Building Lifecycle
All (95)Filed (8)Permit Issued (9)Signed Off (2)Facade (FISP) (12)Violation (34)Special Inspection (30)
05/21/2026
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING AMENITY SPACE & NEW FURNITURE LAYOUT ON EXISTING TERRACE,LOCATED ON THE 2ND FLOOR. SCOPE LIMITED TO NON-STRUCTURAL PARTITION DEMOLITION, NEW FULL HEIGHTNON-STRUCTURAL PARTITIONS, NEW LAYOUT, LIGHTING & FINISHES. NO CHANGE I
M01066775-I1
05/05/2026
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING AMENITY SPACE & NEW FURNITURE LAYOUT ON EXISTING TERRACE,LOCATED ON THE 2ND FLOOR. SCOPE LIMITED TO NON-STRUCTURAL PARTITION DEMOLITION, NEW FULL HEIGHTNON-STRUCTURAL PARTITIONS, NEW LAYOUT, LIGHTING & FINISHES. NO CHANGE I
M01066775-S1
11/25/2025
Permit issued — General Construction
M01066775-I1-GC
06/06/2025
Violation issued (HPD, open)
A
06/06/2025
Violation issued (HPD, open)
A
06/06/2025
Violation issued (HPD, open)
B
06/06/2025
Violation issued (HPD, closed)
C
06/06/2025
Violation issued (HPD, closed)
C
06/06/2025
Violation issued (HPD, closed)
C
06/06/2025
Violation issued (HPD, closed)
C
06/06/2025
Violation issued (HPD, closed)
C
06/06/2025
Violation issued (HPD, closed)
C
06/06/2025
Violation issued (HPD, closed)
C
06/06/2025
Violation issued (HPD, closed)
C
05/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alec Strongin
05/12/2025
Special inspection requirement — Final
Alec Strongin
05/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
Alec Strongin
05/12/2025
Special inspection requirement — Mechanical Systems
Alec Strongin
05/09/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING AMENITY SPACE & NEW FURNITURE LAYOUT ON EXISTING TERRACE,LOCATED ON THE 2ND FLOOR. SCOPE LIMITED TO NON-STRUCTURAL PARTITION DEMOLITION, NEW FULL HEIGHTNON-STRUCTURAL PARTITIONS, NEW LAYOUT, LIGHTING & FINISHES. NO CHANGE I
M01066775-P2
05/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alec Strongin
05/09/2025
Special inspection requirement — Mechanical Systems
Alec Strongin
05/09/2025
Special inspection requirement — Final
Alec Strongin
02/19/2025
Permit issued — General Construction
M01066775-I1-GC
02/19/2025
Permit issued — Mechanical Systems
M01066775-S1-MS
12/12/2024
Filed — Alteration
INTERIOR RENOVATION OF EXISTING AMENITY SPACE & NEW FURNITURE LAYOUT ON EXISTING TERRACE,LOCATED ON THE 2ND FLOOR. SCOPE LIMITED TO NON-STRUCTURAL PARTITION DEMOLITION, NEW FULL HEIGHTNON-STRUCTURAL PARTITIONS, NEW LAYOUT, LIGHTING & FINISHES. NO CHANGE I
M01066775-S1
12/09/2024
Special inspection requirement — Final
Alec Strongin
12/09/2024
Special inspection requirement — Tenant Protection Plan Compliance
Alec Strongin
12/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alec Strongin
12/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Alec Strongin
12/09/2024
Special inspection requirement — Fire-Resistance Rated Construction
Alec Strongin
12/09/2024
Special inspection requirement — Lighting controls
Alec Strongin
12/09/2024
Special inspection requirement — Exterior lighting power
Alec Strongin
12/09/2024
Special inspection requirement — Interior lighting power
Alec Strongin
12/03/2024
Filed — Alteration
Filing architectural plans for lobby and courtyard renovation.
M00817829-P2
11/26/2024
Special inspection requirement — Lighting controls
Alec Strongin
11/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alec Strongin
11/26/2024
Special inspection requirement — Tenant Protection Plan Compliance
11/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Alec Strongin
11/26/2024
Special inspection requirement — Final
Alec Strongin
11/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
Alec Strongin
11/26/2024
Special inspection requirement — Exterior lighting power
Alec Strongin
11/26/2024
Special inspection requirement — Interior lighting power
Alec Strongin
10/17/2024
Filed — Alteration
INTERIOR RENOVATION OF EXISTING AMENITY SPACE & NEW FURNITURE LAYOUT ON EXISTING TERRACE,LOCATED ON THE 2ND FLOOR. SCOPE LIMITED TO NON-STRUCTURAL PARTITION DEMOLITION, NEW FULL HEIGHTNON-STRUCTURAL PARTITIONS, NEW LAYOUT, LIGHTING & FINISHES. NO CHANGE I
M01066775-I1
01/30/2024
Filed — Alteration
Filing architectural plans for lobby and courtyard renovation.
M00817829-P1
10/27/2023
Cycle 9 facade report signed — SWARMP
10/06/2023
Cycle 9 facade report submitted
09/08/2023
Permit issued — Structural
M00817829-S1-ST
09/08/2023
Permit issued — General Construction
M00817829-I1-GC
09/07/2023
Permit issued — Construction Fence
M00874286-I1-FN
08/10/2023
Cycle 9 facade inspection completed
05/31/2023
Permit issued — Construction Fence
M00874286-I1-FN
05/30/2023
Filed — Alteration
M00874286-I1
05/03/2023
Permit issued — General Construction
M00817829-I1-GC
05/03/2023
Permit issued — Structural
M00817829-S1-ST
03/09/2023
Filed — Alteration
Filing architectural plans for lobby and courtyard renovation.
M00817829-S1
03/07/2023
Special inspection requirement — Post-installed Anchors
Alec Strongin
03/07/2023
Special inspection requirement — Structural Steel - Details
Alec Strongin
03/07/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Alec Strongin
03/07/2023
Special inspection requirement — Structural Steel - Welding
Alec Strongin
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSPK/LEWIS CONSTRUCTION LL11/25/2025
DOB NOWGeneral ConstructionSigned-offSPK/LEWIS CONSTRUCTION LL02/19/2025
DOB NOWMechanical SystemsSigned-offSPK/LEWIS CONSTRUCTION LL02/19/2025
DOB NOWStructuralPermit IssuedSELECT COMMERCIAL CONSTR*09/08/2023
DOB NOWGeneral ConstructionPermit IssuedSELECT COMMERCIAL CONSTR*09/08/2023
DOB NOWConstruction FencePermit IssuedSELECT COMMERCIAL CONSTR*09/07/2023
DOB NOWConstruction FencePermit IssuedSELECT COMMERCIAL CONSTR*05/31/2023
DOB NOWGeneral ConstructionPermit IssuedSELECT COMMERCIAL CONSTR*05/03/2023
DOB NOWStructuralPermit IssuedSELECT COMMERCIAL CONSTR*05/03/2023
BISPLISSUEDG.BASSOLINO PLUMBING LTD02/05/2002
BISPLISSUEDPARAMOUNT PLBG CO.04/18/2001
BISPLISSUEDG.BASSOLINO PLUMBING LTD12/29/2000
BISBLISSUEDC C CONTROLLED COMBUSTION12/29/2000
BISPLISSUEDPARAMOUNT PLUMBING CO NY INC.12/20/2000
BISSPISSUEDA & F FIRE PROTECTION CO12/08/2000
BISOTISSUEDMCGRAW HUDSON CONSTRUCTION06/29/2000
BIS—ISSUEDMCGRAW HUDSON CONSTRUCTION06/28/2000
BISEQISSUEDMCGRAW HUDSON CONSTRUCTION06/28/2000
BISOTISSUEDMCGRAW HUDSON CORP06/22/2000
BIS—ISSUEDMCGRAW HUDSON CONSTRUCTION05/22/2000
BISFSISSUEDCONTROLLED COMB.05/09/2000
BISPLISSUEDPARAMOUNT PLBG CO.03/01/2000
BISEQISSUEDMCGRAW HUDSON CONSTRUCTION01/10/2000
BISOTISSUEDMCGRAW HUDSON CORP12/15/1999
BISEQISSUEDMCGRAW HUDSON CONSTRUCTION12/03/1999
BIS—RE-ISSUEDMCGRAW HUDSON CONSTRUCTION12/03/1999
1 project · most recent 12/03/2024
Steel
FiledStatusContractorScope
12/03/2024Permit IssuedSELECT COMMERCIAL CONSTR*Steel
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
05/12/2025Fire-Resistant Penetrations and JointsAlec Stronginspecial
05/12/2025FinalAlec Stronginprogress
05/12/2025Tenant Protection Plan ComplianceAlec Stronginspecial
05/12/2025Mechanical SystemsAlec Stronginspecial
05/09/2025Tenant Protection Plan Compliance—special
05/09/2025Fire-Resistant Penetrations and JointsAlec Stronginspecial
05/09/2025Mechanical SystemsAlec Stronginspecial
05/09/2025FinalAlec Stronginprogress
12/09/2024FinalAlec Stronginprogress
12/09/2024Tenant Protection Plan ComplianceAlec Stronginspecial
12/09/2024Fire-Resistant Penetrations and JointsAlec Stronginspecial
12/09/2024Energy Code Compliance InspectionsAlec Stronginprogress
12/09/2024Fire-Resistance Rated ConstructionAlec Stronginprogress
12/09/2024Lighting controlsAlec Stronginenergy_progress
12/09/2024Exterior lighting powerAlec Stronginenergy_progress
12/09/2024Interior lighting powerAlec Stronginenergy_progress
11/26/2024Lighting controlsAlec Stronginenergy_progress
11/26/2024Fire-Resistant Penetrations and JointsAlec Stronginspecial
11/26/2024Tenant Protection Plan Compliance—special
11/26/2024Energy Code Compliance InspectionsAlec Stronginprogress
11/26/2024FinalAlec Stronginprogress
11/26/2024Fire-Resistance Rated ConstructionAlec Stronginprogress
11/26/2024Exterior lighting powerAlec Stronginenergy_progress
11/26/2024Interior lighting powerAlec Stronginenergy_progress
03/07/2023Post-installed AnchorsAlec Stronginspecial
Latest 25 of 30.
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/31/2026M00874286-I1Request digital key ↗
08/26/2026M01066775-I1Request digital key ↗
08/26/2026M01066775-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
02/02/2016122634952Open ↗
03/05/2014121915678Open ↗
▸Seals & Professional Certifications35
▸DOB NOWProgress Inspector Seal & Signature15
09/02/2026M00817829-S1Open ↗
08/31/2026M01066775-P2Open ↗
08/29/2026M00817829-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026M00817829-S1Open ↗
09/02/2026M00817829-S1Open ↗
09/02/2026M00817829-S1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/31/2026M00874286-I1Open ↗
08/25/2026M00817829-P1Open ↗
08/25/2026M00817829-S1Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment2
▸BISFA - FDNY APPROVAL : FD-FAA2
05/31/2018122634952Open ↗
05/08/2015121915678Open ↗
▸Environmental & Asbestos10
▸DOB NOWOER: Notice to Proceed7
08/13/2026M01066775-I1Open ↗
08/13/2026M00817829-P2Open ↗
08/13/2026M00817829-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice of Satisfaction3
08/13/2026M01066775-I1Open ↗
08/13/2026M01066775-S1Open ↗
08/13/2026M00817829-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
10/03/2019122634952Open ↗
12/28/2018102211198Open ↗
06/14/2018122634952Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
02/02/2016122634952Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
05/31/2018122634952Open ↗
02/02/2016122634952Open ↗
02/10/2014121915678Open ↗
▸Filing & Intake Forms6
▸BISBOROUGH INTAKE FORM4
10/03/2019122634952Open ↗
10/03/2019122634952Open ↗
12/28/2018102211198Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
02/02/2016122634952Open ↗
02/10/2014121915678Open ↗