Elevator apt, fireproof with stores
IMPACCT Myrtle Residences
778 MYRTLE AVENUE · BIN 3427444
💬 Discuss this project
2023Year Built
9Stories
D6Building Class
R7DZoning
46,038 sfGross Floor Area
62Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: 778 MYRTLE HOUSING DEVELOPMENT FUND CORP ORATION · 7,500 sf lot · 6.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Roof8p · 5 filings · 20 docs
Bulkhead2p · 2 filings · 20 docs
Floor 97p · 3 filings · 20 docs
Floor 84p · 1 filing · 20 docs
Floor 74p · 1 filing · 20 docs
Floor 63p · 1 filing · 20 docs
Floor 52p · 1 filing · 20 docs
Floor 42p · 1 filing · 20 docs
Floor 33p · 2 filings · 20 docs
Floor 24p · 2 filings · 20 docs
Floor 17p · 3 filings · 20 docs
Cellar6p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKYLINE SCAFFOLDING GROUP2207/08/2026
VIK XS SERVICES707/08/2026
PRATT AREA COMMUNITY COUNCIL DBA IM703/22/2026
HPD503/22/2026
778 MYRTLE HOUSING DEVELOPMENT FUND CORP ORATION103/22/2026
IMPACCT BROOKLYN103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE1003/21/2026
AO CONSULTING AND DRAFTING403/21/2026
BMB BUILDING CONSULTING2003/21/2026
S R SOLAR DESIGN403/21/2026
MEGA CONTRACTING GROUP403/21/2026
Rigid Structural Design, LLC403/21/2026
PLANNING FOR SAFETY103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MEGA CONTRACTING GP LLCGeneral Contractor2207/08/2026
SKYLINE SCAFFOLDING GROUPGeneral Contractor1707/08/2026
MB MECHANICAL OF NY INCGeneral Contractor603/21/2026
FLUID MECHANICS CORPFire Protection607/08/2026
770 ELECTRIC CORPGeneral Contractor303/21/2026
PHOENIX PLMBG & MECH CORPFire Protection307/08/2026
SUPREME MECH NYC LLCPlumbing207/08/2026
JOHN AHRENSElectrical203/21/2026
BRANCH PLUMBING LLCFire Protection207/08/2026
ADMIRAL AIR CONDITION CORGeneral Contractor203/21/2026
TUXEDO ELECL CONTRG INC 004066General Contractor203/22/2026
VIK XS SERVICES INCGeneral Contractor207/08/2026
COUNTY ELECL CONTRACTOR IElectrical103/22/2026
PLUMBING WORKS CORPFire Protection107/08/2026
GRID CITY ELECTRIC, CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803608/19/2024
NKM ENGINEERING PLLC6244207/01/2024
HANSEN ENGINEERING PC8174201/18/2023
Building Lifecycle
All (143)Filed (27)Permit Issued (40)Signed Off (15)Violation (8)Inspection (13)Objection (10)Special Inspection (30)
06/10/2026
Violation issued (HPD, open)
C
10/02/2025
Violation issued (HPD, closed)
A
10/02/2025
Violation issued (HPD, closed)
C
06/16/2025
Violation issued (HPD, closed)
A
01/16/2025
Signed off — Alteration
B00284205-I1
01/14/2025
Signed off — Alteration
B00284716-I1
11/26/2024
Signed off — Alteration
Propose to install temporary Dry Fire Standpipe system for period of building construction filed in conjunction with NB # 321596402.
B00565463-I1
11/12/2024
Violation issued (FDNY_NOV, closed)
11/12/2024
Violation issued (FDNY_NOV, closed)
10/03/2024
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
09/12/2024
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
09/10/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/10/2024
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
09/06/2024
Permit issued — Sprinklers
B00284716-I1-EW-SD
09/05/2024
Permit issued — Plumbing
B00284716-I1-EW-SP
09/04/2024
Permit issued — Standpipe
B00565463-I1-EW-SD
08/26/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SAMI HAJJAR P.E
08/26/2024
Special inspection requirement — Sprinkler Systems
SAMI HAJJAR P.E
08/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Justin Moses
08/26/2024
Special inspection requirement — HVAC insulation and sealing
Justin Moses
08/26/2024
Special inspection requirement — Standpipe Systems
SAMI HAJJAR P.E
08/19/2024
Filed — Alteration
B00284716-P3
08/14/2024
Special inspection requirement — Energy Code Compliance Inspections
Justin Moses
08/14/2024
Special inspection requirement — Standpipe Systems
SAMI HAJJAR P.E
08/14/2024
Special inspection requirement — Sprinkler Systems
SAMI HAJJAR P.E
08/14/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SAMI HAJJAR P.E
08/14/2024
Special inspection requirement — HVAC insulation and sealing
Justin Moses
08/12/2024
Signed off — Alteration
B00819320-I1
08/06/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/24/2024
Special inspection requirement — Interior lighting power
Justin Moses
07/24/2024
Special inspection requirement — Duct leakage testing, insulation and design
Justin Moses
07/24/2024
Special inspection requirement — Electrical energy consumption
Justin Moses
07/24/2024
Special inspection requirement — Maintenance information
Justin Moses
07/24/2024
Special inspection requirement — Shutoff dampers
Justin Moses
07/24/2024
Special inspection requirement — Lighting controls
Justin Moses
07/24/2024
Special inspection requirement — HVAC and service water heating system controls
Justin Moses
07/24/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
07/24/2024
Special inspection requirement — HVAC and service water heating equipment
Justin Moses
07/24/2024
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
07/24/2024
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
07/24/2024
Special inspection requirement — Energy Code Compliance Inspections
Justin Moses
07/24/2024
Special inspection requirement — Electrical motors and elevators
Justin Moses
07/24/2024
Special inspection requirement — Exterior lighting power
Justin Moses
07/24/2024
Special inspection requirement — Lighting in dwelling units
Justin Moses
07/24/2024
Special inspection requirement — HVAC insulation and sealing
Justin Moses
07/23/2024
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK.
B01041031-I1
07/22/2024
Objection resolved — Addressed
07/05/2024
Objection raised — Structural
07/01/2024
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK.
B01041031-P1
06/28/2024
Filed — Alteration
B00284205-P2
06/28/2024
Filed — Alteration
B00284716-P2
06/14/2024
Special inspection requirement — Standpipe Systems
SAMI HAJJAR P.E
06/14/2024
Special inspection requirement — Shutoff dampers
Justin Moses
06/14/2024
Special inspection requirement — Sprinkler Systems
SAMI HAJJAR P.E
06/14/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SAMI HAJJAR P.E
06/06/2024
Signed off — Alteration
B00285600-I1
05/21/2024
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00904615-S1
05/21/2024
Signed off — Alteration
Suspended Hanging Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy
B00601064-I1
05/21/2024
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR SHED LEGS ON ROADWAY.
B00600999-I1
05/21/2024
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00904615-I1
Latest 60 of 143 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offFLUID MECHANICS CORP09/06/2024
DOB NOWPlumbingSigned-offFLUID MECHANICS CORP09/05/2024
DOB NOWStandpipeSigned-offFLUID MECHANICS CORP09/04/2024
DOB NOWSolarSigned-off770 ELECTRIC CORP05/14/2024
DOB NOWSupported ScaffoldSigned-offSKYLINE SCAFFOLDING GROUP05/10/2024
DOB NOWStructuralSigned-offMEGA CONTRACTING GP LLC05/09/2024
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP05/03/2024
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/02/2024
DOB NOWPlumbingSigned-offTOMMASO SAVELLA04/23/2024
DOB NOWMechanical SystemsSigned-offMB MECHANICAL OF NY INC03/04/2024
DOB NOWMechanical SystemsSigned-offMB MECHANICAL OF NY INC02/01/2024
DOB NOWConstruction FenceSigned-offMEGA CONTRACTING GP LLC01/18/2024
DOB NOWProtection and Mechanical MethodsSigned-offVIK XS SERVICES INC10/17/2023
DOB NOWMechanical SystemsSigned-offADMIRAL AIR CONDITION COR09/26/2023
DOB NOWSupported ScaffoldSigned-offVIK XS SERVICES INC09/07/2023
DOB NOWStandpipeSigned-offFLUID MECHANICS CORP08/28/2023
DOB NOWStandpipeSigned-offFLUID MECHANICS CORP08/28/2023
DOB NOWPlumbingSigned-offFLUID MECHANICS CORP08/28/2023
DOB NOWSupported ScaffoldSigned-offSKYLINE SCAFFOLDING GROUP07/17/2023
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP07/14/2023
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP05/04/2023
DOB NOWStandpipeSigned-offTOMMASO SAVELLA05/04/2023
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/04/2023
DOB NOWStructuralSigned-offMEGA CONTRACTING GP LLC04/14/2023
DOB NOWPlumbingSigned-offGW MECHANICAL CORP04/06/2023
DOB NOWPlumbingSigned-offGW MECHANICAL CORP04/06/2023
DOB NOWEarth WorkSigned-offMEGA CONTRACTING GP LLC03/10/2023
DOB NOWStandpipeSigned-offGW MECHANICAL CORP03/02/2023
DOB NOWSupport of ExcavationSigned-offMEGA CONTRACTING GP LLC02/24/2023
DOB NOWConstruction FenceSigned-offMEGA CONTRACTING GP LLC01/27/2023
DOB NOWConstruction FenceSigned-offMEGA CONTRACTING GP LLC09/02/2022
DOB NOWStandpipeSigned-offBLUEWATER P&H, INC07/11/2022
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/05/2022
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP05/05/2022
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP10/29/2021
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP10/27/2021
DOB NOWStandpipeSigned-offFRANK BRANCIFORTE10/13/2021
DOB NOWConstruction FenceSigned-offMEGA CONTRACTING GP LLC09/29/2021
DOB NOWStandpipeSigned-offFRANK BRANCIFORTE09/09/2021
DOB NOWConstruction FenceSigned-offMEGA CONTRACTING GP LLC08/16/2021
+ 5 more permits on file
7 projects · most recent 11/14/2024
General Wiring
FiledStatusContractorScope
11/14/2024CompleteCOUNTY ELECL CONTRACTOR IGeneral Wiring
04/22/2024CompleteGRID CITY ELECTRIC, CORP90 meters, 1 new_meters
07/28/2023CompleteCOUNTY ELECL CONTRACTOR I—
07/14/2023CompleteTUXEDO ELEC'L CONTR'G INC—
05/05/2023CompleteCOUNTY ELECL CONTRACTOR I—
05/05/2023CompleteCOUNTY ELECL CONTRACTOR I—
09/27/2021CompleteTOP SHELF ELECTRIC CORP—
1 project · most recent 09/21/2023
Sidewalk Shed
FiledStatusContractorScope
09/21/2023Signed-offSKYLINE SCAFFOLDING GROUPSidewalk Shed
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
10/03/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
09/12/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
09/10/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/10/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/06/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/29/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/25/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/25/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/25/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/25/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
05/31/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/31/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/19/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 80
DateRequirementInspectorRole
08/26/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSAMI HAJJAR P.Especial
08/26/2024Sprinkler SystemsSAMI HAJJAR P.Especial
08/26/2024Standpipe SystemsSAMI HAJJAR P.Especial
08/26/2024Energy Code Compliance InspectionsJustin Mosesprogress
08/26/2024HVAC insulation and sealing Justin Mosesenergy_progress
08/14/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSAMI HAJJAR P.Especial
08/14/2024Sprinkler SystemsSAMI HAJJAR P.Especial
08/14/2024Standpipe SystemsSAMI HAJJAR P.Especial
08/14/2024Energy Code Compliance InspectionsJustin Mosesprogress
08/14/2024HVAC insulation and sealing Justin Mosesenergy_progress
07/24/2024Shutoff dampersJustin Mosesenergy_progress
07/24/2024Electrical motors and elevatorsJustin Mosesenergy_progress
07/24/2024HVAC and service water heating equipment Justin Mosesenergy_progress
07/24/2024FinalSAMI HAJJAR P.Eprogress
07/24/2024Energy Code Compliance InspectionsJustin Mosesprogress
07/24/2024Mechanical SystemsSAMI HAJJAR P.Especial
07/24/2024Heating SystemsSAMI HAJJAR P.Especial
07/24/2024Maintenance informationJustin Mosesenergy_progress
07/24/2024Electrical energy consumptionJustin Mosesenergy_progress
07/24/2024Interior lighting powerJustin Mosesenergy_progress
07/24/2024HVAC and service water heating system controls Justin Mosesenergy_progress
07/24/2024Duct leakage testing, insulation and designJustin Mosesenergy_progress
07/24/2024HVAC insulation and sealing Justin Mosesenergy_progress
07/24/2024Lighting in dwelling unitsJustin Mosesenergy_progress
07/24/2024Lighting controlsJustin Mosesenergy_progress
Latest 25 of 80.
▾Documents — 232 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch18
09/01/2026B00565463-I1Request digital key ↗
09/01/2026B00572824-I1Request digital key ↗
08/31/2026B00600999-P1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/02/2026B00284716-I1Request digital key ↗
09/02/2026B00284716-P1Request digital key ↗
09/02/2026B00284716-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Standpipe4
09/02/2026B00284716-I1Request digital key ↗
09/02/2026B00284716-P2Request digital key ↗
09/02/2026B00284716-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/02/2026B00284716-P3Request digital key ↗
09/02/2026B00284716-I1Request digital key ↗
09/02/2026B00284716-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/02/2026B00284205-I1Request digital key ↗
09/02/2026B00284205-P2Request digital key ↗
08/15/2026B00284205-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/27/2026B00285600-I1Request digital key ↗
08/27/2026B00285600-P1Request digital key ↗
▸Applications & Permits25
▸BISPLAN / WORK APPROVAL APPLICATION19
10/31/2024321596402Open ↗
05/15/2024321596402Open ↗
05/09/2024321596402Open ↗
Showing 3 of 19 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
08/20/2020340715426Open ↗
06/11/2020340715426Open ↗
01/31/2020340715426Open ↗
▸BISWORK PERMIT APPLICATION2
01/20/2023321596402Open ↗
01/20/2023321596402Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/14/2024321596402Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
06/11/2020340715426Open ↗
01/21/2020321596402Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/12/2023321596402Open ↗
▸BISVERIFY TAX LOT1
02/12/2024321596402Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
01/21/2020321596402Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/12/2024321596402Open ↗
▸BISZONING DIAGRAM1
05/20/2020321596402Open ↗
▸BISZONING EXHIBIT I:CERTIFICATION1
01/12/2023321596402Open ↗
▸Seals & Professional Certifications53
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/01/2026B00572824-I1Open ↗
08/31/2026B00600999-P2Open ↗
08/31/2026B00600999-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
08/28/2026B00284716-P3Open ↗
08/28/2026B00284716-P3Open ↗
08/28/2026B00284205-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/28/2026B00284716-P3Open ↗
08/28/2026B00284205-I1Open ↗
08/27/2026B00807767-I1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/31/2020340715426Open ↗
▸Trade Schedules & Equipment3
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
05/17/2024321596402Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
03/03/2020321596402Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026B00807767-S1—
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST4
06/11/2020340715426Open ↗
05/04/2020321596402Open ↗
01/31/2020340715426Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE SIGNOFF2
12/16/2024340715426Open ↗
07/29/2024321596402Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
06/11/2020340715426Open ↗
05/20/2020321596402Open ↗
▸BISBPP: STREET TREES SITE PLAN1
06/11/2020340715426Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/17/2022321596402Open ↗
05/20/2020321596402Open ↗
▸BISINTERIOR LIGHTING POWER1
08/19/2024321596402Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/19/2024321596402Open ↗
▸BISFENESTRATION AREAS1
08/19/2024321596402Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
08/19/2024321596402Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
08/19/2024321596402Open ↗
▸BISLIGHTING IN DWELLING UNITS1
08/19/2024321596402Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/19/2024321596402Open ↗
▸BISLIGHTING CONTROLS1
08/19/2024321596402Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/19/2024321596402Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
10/28/2024321596402Open ↗
▸BISEXTERIOR LIGHTING POWER1
08/19/2024321596402Open ↗
▸BISFENESTRATION AIR LEAKAGE1
08/19/2024321596402Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
08/19/2024321596402Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00284205-I1Open ↗
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY11
04/30/2024321596402Open ↗
04/11/2023321596402Open ↗
06/17/2022321596402Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
04/12/2023321596402Open ↗
04/12/2023321596402Open ↗
06/17/2022321596402Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
09/30/2024321596402Open ↗
06/17/2022321596402Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/13/2024321596402Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/13/2024321596402Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
08/13/2024321596402Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
08/13/2024321596402Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
05/01/2024321596402Open ↗
▸BISSOIL REPORT1
01/21/2020321596402Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
01/21/2020321596402Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
05/01/2024321596402Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
08/13/2024321596402Open ↗
▸Approvals, Objections & Sign-offs31
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
09/01/2026B00572824-I1Open ↗
08/24/2026B01041031-I1Open ↗
08/14/2026B01041031-P1Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
04/12/2023321596402Open ↗
03/10/2023340715426Open ↗
01/20/2023321596402Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
10/31/2024321596402Open ↗
05/15/2024321596402Open ↗
05/10/2024321596402Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01041031-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
01/20/2023321596402Open ↗
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION12
05/16/2024321596402Open ↗
02/28/2024321596402Open ↗
04/13/2023321596402Open ↗
Showing 3 of 12 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
01/31/2020340715426Open ↗
▸BISEFILING COVER SHEET1
01/08/2020321596402Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/31/2020340715426Open ↗
▸Other Documents11
▸BISRECORDS MGMT FEE PAYMENT RECEIPT2
01/09/2025340715426Open ↗
08/20/2020340715426Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00807767-S1Open ↗
08/13/2026B00807767-I1Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
05/04/2020321596402Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
08/13/2024321596402Open ↗
▸BISVESTIBULES1
08/19/2024321596402Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
08/19/2024321596402Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
01/31/2020340715426Open ↗
▸BISSITE SURVEY: FINAL1
—321596402Open ↗
▸BISSITE SURVEY: INITIAL1
—321596402Open ↗