← Back
QUEENS
Forte Preparatory High School
78-02 QUEENS BOULEVARD · Name © OpenStreetMap contributors · BIN 4625057
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Permit Issued — active, not yet Signed-off
Floor 3Under Construction13p · 1 filing · 20 docs
Floor 2Under Construction13p · 1 filing · 20 docs
Floor 1Under Construction13p · 1 filing · 20 docs
CellarUnder Construction13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRIPLE EAST QUEENS TOWER LLC1103/22/2026
CKK CONSULTING403/22/2026
ABSOLUTE CONTRACTING INC103/22/2026
KV APEX 7806 CHARTER403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOUIS STRIAR603/21/2026
JM ZONING, LLC.2303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STREAM PLUMBING INCPlumbing2407/08/2026
CKK CONSULTING LLCGeneral Contractor1707/08/2026
COLGATE ENTERPRISE CORPGeneral Contractor807/08/2026
LIS PIPING SOLUTION INCFire Protection307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JUST CONSULTING ENGINEERI58652105/06/2026
HSU & ASSOCIATES8025212/23/2025
LT INSPECTIONS INC9795103/18/2024
Building Lifecycle
All (171)Filed (36)Permit Issued (25)Signed Off (12)Violation (15)Inspection (15)Objection (38)Special Inspection (30)
07/10/2026
Signed off — New Building
MECHANICAL FILING SUBSEQUENT TO Q01012069-I1. DESIGN INCLUDES THE INSTALLATION OF HEATING AND COOLING SYSTEMS AND BUILDING VENTILATION SYSTEMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
Q01012069-I1
05/12/2026
Special inspection requirement — Air barrier — testing
XIAOJUN WANG
05/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
XIAOJUN WANG
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
05/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
XIAOJUN WANG
05/12/2026
Special inspection requirement — Energy Code Compliance Inspections
XIAOJUN WANG
05/12/2026
Special inspection requirement — Fenestration areas
XIAOJUN WANG
05/12/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
XIAOJUN WANG
05/12/2026
Special inspection requirement — Air barrier - visual inspection
XIAOJUN WANG
05/12/2026
Special inspection requirement — Fenestration air leakage
XIAOJUN WANG
05/12/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
XIAOJUN WANG
05/12/2026
Special inspection requirement — Protection of exposed foundation insulation
XIAOJUN WANG
05/12/2026
Special inspection requirement — Insulation placement and R values
XIAOJUN WANG
05/12/2026
Special inspection requirement — Vestibules
XIAOJUN WANG
05/06/2026
Filed — New Building
MECHANICAL FILING SUBSEQUENT TO Q01012069-I1. DESIGN INCLUDES THE INSTALLATION OF HEATING AND COOLING SYSTEMS AND BUILDING VENTILATION SYSTEMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
Q01012069-A7
05/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
XIAOJUN WANG
05/06/2026
Special inspection requirement — Insulation placement and R values
XIAOJUN WANG
05/06/2026
Special inspection requirement — Vestibules
XIAOJUN WANG
05/06/2026
Special inspection requirement — Fenestration air leakage
XIAOJUN WANG
05/06/2026
Special inspection requirement — Air barrier - visual inspection
XIAOJUN WANG
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
05/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
XIAOJUN WANG
05/06/2026
Special inspection requirement — Air barrier — testing
XIAOJUN WANG
05/06/2026
Special inspection requirement — Fenestration areas
XIAOJUN WANG
05/06/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
XIAOJUN WANG
05/06/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
XIAOJUN WANG
05/06/2026
Special inspection requirement — Energy Code Compliance Inspections
XIAOJUN WANG
05/06/2026
Special inspection requirement — Protection of exposed foundation insulation
XIAOJUN WANG
04/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/06/2026
Filed — New Building
MECHANICAL FILING SUBSEQUENT TO Q01012069-I1. DESIGN INCLUDES THE INSTALLATION OF HEATING AND COOLING SYSTEMS AND BUILDING VENTILATION SYSTEMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
Q01012069-A6
04/06/2026
Special inspection requirement — Vestibules
XIAOJUN WANG
04/06/2026
Special inspection requirement — Protection of exposed foundation insulation
XIAOJUN WANG
04/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
XIAOJUN WANG
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
03/25/2026
Signed off — New Building
MECHANICAL FILING SUBSEQUENT TO Q01012069-I1. DESIGN INCLUDES THE INSTALLATION OF HEATING AND COOLING SYSTEMS AND BUILDING VENTILATION SYSTEMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
Q01012069-S6
03/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/18/2026
Signed off — New Building
MECHANICAL FILING SUBSEQUENT TO Q01012069-I1. DESIGN INCLUDES THE INSTALLATION OF HEATING AND COOLING SYSTEMS AND BUILDING VENTILATION SYSTEMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
Q01012069-S5
03/12/2026
Permit issued — Standpipe
Q01012069-S6-EW-SP
03/11/2026
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY SIGN FOR COMMUNITY USE EDUCATIONAL FACILITY - IN PROPERTY LINES - FORTE PREPARATORY HIGH SCHOOL. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01367528-I1
03/11/2026
Filed — Alteration
NON-ILLUMINATED NON-ADVERTISING ACCESSORY SIGN FOR COMMUNITY USE EDUCATIONAL FACILITY - IN PROPERTY LINES - FORTE PREPARATORY HIGH SCHOOL. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01367530-I1
03/11/2026
Filed — Alteration
NON-ILLUMINATED NON-ADVERTISING ACCESSORY SIGN FOR COMMUNITY USE EDUCATIONAL FACILITY - IN PROPERTY LINES - FORTE PREPARATORY HIGH SCHOOL. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01367531-I1
03/09/2026
Signed off — New Building
MECHANICAL FILING SUBSEQUENT TO Q01012069-I1. DESIGN INCLUDES THE INSTALLATION OF HEATING AND COOLING SYSTEMS AND BUILDING VENTILATION SYSTEMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
Q01012069-S7
03/02/2026
Signed off — New Building
MECHANICAL FILING SUBSEQUENT TO Q01012069-I1. DESIGN INCLUDES THE INSTALLATION OF HEATING AND COOLING SYSTEMS AND BUILDING VENTILATION SYSTEMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
Q01012069-S4
03/02/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/02/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
02/28/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
02/27/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/27/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
02/27/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
02/20/2026
Signed off — Alteration
Q01233258-I1
02/04/2026
Objection resolved — Addressed
02/03/2026
Objection raised — Energy
01/28/2026
Signed off — Alteration
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01086894-I1
01/28/2026
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01080974-I1
01/28/2026
Signed off — Alteration
Q01086357-I1
01/07/2026
Filed — New Building
MECHANICAL FILING SUBSEQUENT TO Q01012069-I1. DESIGN INCLUDES THE INSTALLATION OF HEATING AND COOLING SYSTEMS AND BUILDING VENTILATION SYSTEMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
Q01012069-A5
01/07/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/05/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
Latest 60 of 171 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offLIS PIPING SOLUTION INC03/12/2026
DOB NOWGeneral ConstructionPermit IssuedCKK CONSULTING12/08/2025
DOB NOWPlumbingSigned-offSTREAM PLUMBING INC11/14/2025
DOB NOWSupported ScaffoldSigned-offCOLGATE ENTERPRISE CORP07/10/2025
DOB NOWSidewalk ShedSigned-offCOLGATE ENTERPRISE CORP06/24/2025
DOB NOWProtection and Mechanical MethodsSigned-offCOLGATE ENTERPRISE CORP06/23/2025
DOB NOWConstruction FenceSigned-offCKK CONSULTING06/12/2025
DOB NOWConstruction FenceSigned-offCOLGATE ENTERPRISE CORP05/30/2025
DOB NOWStandpipeSigned-offLIS PIPING SOLUTION INC05/08/2025
DOB NOWGeneral ConstructionPermit IssuedCKK CONSULTING05/07/2025
DOB NOWFoundationSigned-offCKK CONSULTING05/07/2025
DOB NOWStructuralSigned-offCKK CONSULTING05/07/2025
DOB NOWMechanical SystemsSigned-offCKK CONSULTING05/07/2025
DOB NOWConstruction FenceSigned-offCKK CONSULTING05/07/2025
DOB NOWSprinklersSigned-offLIS PIPING SOLUTION INC03/20/2025
DOB NOWPlumbingSigned-offSTREAM PLUMBING INC11/27/2024
DOB NOWProtection and Mechanical MethodsSigned-offCOLGATE ENTERPRISE CORP07/29/2024
DOB NOWSidewalk ShedSigned-offCOLGATE ENTERPRISE CORP07/26/2024
DOB NOWSupported ScaffoldSigned-offCOLGATE ENTERPRISE CORP07/25/2024
DOB NOWFoundationSigned-offCKK CONSULTING06/12/2024
DOB NOWSupport of ExcavationSigned-offCKK CONSULTING06/12/2024
DOB NOWGeneral ConstructionPermit IssuedCKK CONSULTING06/12/2024
DOB NOWMechanical SystemsSigned-offCKK CONSULTING06/06/2024
DOB NOWStructuralSigned-offCKK CONSULTING06/04/2024
DOB NOWConstruction FenceSigned-offCKK CONSULTING05/30/2024
BISOTISSUEDCKK CONSULTING LLC09/04/2025
1 project · most recent 05/06/2026
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/06/2026Permit IssuedCKK CONSULTING LLCHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Daikin ARNU243V1A4 24,200 BTU · Vrf Indoor ×141
ARNU093TRD4 9,600 BTU · Vrf Indoor ×87
ARNU123TRD4 12,300 BTU · Vrf Indoor ×81
ARNU183TQD4 19,100 BTU · Vrf Indoor ×78
ARNU073TRD4 7,500 BTU · Vrf Indoor ×21
REYQ168AATJA 168,000 BTU · Vrf Outdoor ×7
REYQ120AATJA 144,000 BTU · Vrf Outdoor ×4
ARNU363TAA4 36,200 BTU · Vrf Indoor ×9
ARNU363V2A4 36,200 BTU · Vrf Indoor ×9
ARUN024GSS4 24,000 BTU · Vrf Outdoor ×3
REYQ144AATJA 144,000 BTU · Vrf Outdoor ×3
ARNU053TRD4 5,500 BTU · Vrf Indoor ×3
FXHQ24MVJU 24,200 BTU · Vrf Indoor ×47
FXZQ09TBVJU 9,600 BTU · Vrf Indoor ×29
FXZQ12TBVJU 12,300 BTU · Vrf Indoor ×27
FXZQ18TBVJU 19,100 BTU · Vrf Indoor ×26
FXZQ07TBVJU 7,500 BTU · Vrf Indoor ×7
REYQ168AATJB 168,000 BTU · Vrf Outdoor ×21
REYQ144AATJB 144,000 BTU · Vrf Outdoor ×12
FXFQ36AAVJU 36,200 BTU · Vrf Indoor ×3
FXFQ48AAVJU 36,200 BTU · Vrf Indoor ×3
REYQ120AATJB 120,000 BTU · Vrf Outdoor ×9
RXSQ24TBVJUB 24,000 BTU · Condensing Unit ×9
FXDQ18MVJU 19,100 BTU · Vrf Indoor ×1
Aaon RNA-030-C-A-8-GJB0C-A06NF 322,000 BTU · Rooftop Unit ×3
Heating
Qmark CUH945 4 kW · Electric Heater ×68
Indeeco XX 18 kW · Electric Heater ×4
Ventilation
Greenheck AX-72-190-0425-A50 13,000 CFM · Exhaust Fan ×4
BCF-107-7 950 CFM · Exhaust Fan ×4
CUE-090-D 375 CFM · Exhaust Fan ×4
CUE-100HP-VG 600 CFM · Exhaust Fan ×4
QEID-12 1,600 CFM · Kitchen Exhaust ×4
SQ-130HP-VG 1,100 CFM · Exhaust Fan ×4
SQ-9-M1-VG 1,280 CFM · Makeup Air ×4
SQ-97-VG 150 CFM · Exhaust Fan ×4
USF-22 4,000 CFM · Exhaust Fan ×4
Aaon RNA-016-C-A-8-00000-A02N0 4,575 CFM · Erv ×4
RN-008-8-0-0000-13A 2,200 CFM · Erv ×1
Daikin DAHA11AHYE2DC 165,000 BTU · Erv ×6
DAHA09AHYE2DC 157,000 BTU · Erv ×3
DAHA15AHYE2DC 229,000 BTU · Erv ×3
Renewaire HE3XIN 88,000 BTU · Erv ×3
1 project · most recent 05/06/2026
Sprinkler System
FiledStatusContractorScope
05/06/2026Signed-offLIS PIPING SOLUTION INCSprinkler System
1 project · most recent 05/06/2026
Storm Water/Sanitary
FiledStatusContractorScope
05/06/2026Signed-offSTREAM PLUMBING INCStorm, Water/Sanitary
5 projects · most recent 04/10/2026
General Wiring
FiledStatusContractorScope
04/10/2026CompleteRIGHTWAY ELECTRICAL INCGeneral Wiring
03/21/2026CompleteTF ELECTRICAL CORPGeneral Wiring
07/15/2025CompleteRIGHTWAY ELECTRICAL INCGeneral Wiring
07/27/2024CompleteNASH ELECTRIC SERVICES IN—
06/21/2024CompleteRIGHTWAY ELECTRICAL INC1 meters, 1 new_meters
1 project · most recent 05/06/2026
Steel Concrete
FiledStatusContractorScope
05/06/2026Signed-offLIS PIPING SOLUTION INCSteel, Concrete
1 project · most recent 05/06/2026
Fence
FiledStatusContractorScope
05/06/2026Signed-offLIS PIPING SOLUTION INCFence
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
04/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/02/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/02/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/28/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
02/27/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/27/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
02/27/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
01/07/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/07/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/07/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/03/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/14/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/09/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
05/12/2026Exterior Insulation and Finish Systems (EIFS)XIAOJUN WANGspecial
05/12/2026Protection of exposed foundation insulationXIAOJUN WANGenergy_progress
05/12/2026VestibulesXIAOJUN WANGenergy_progress
05/12/2026Fire-Resistance Rated ConstructionXIAOJUN WANGprogress
05/12/2026Air barrier — testing XIAOJUN WANGenergy_progress
05/12/2026Air barrier - visual inspectionXIAOJUN WANGenergy_progress
05/12/2026Fenestration areasXIAOJUN WANGenergy_progress
05/12/2026Fenestration and door U-factor and product ratingsXIAOJUN WANGenergy_progress
05/12/2026Fenestration air leakageXIAOJUN WANGenergy_progress
05/12/2026Insulation placement and R valuesXIAOJUN WANGenergy_progress
05/12/2026Energy Code Compliance InspectionsXIAOJUN WANGprogress
05/12/2026Fire-Resistant Penetrations and JointsXIAOJUN WANGspecial
05/12/2026Wall Panels, Curtain Walls, and VeneersXIAOJUN WANGspecial
05/06/2026Fenestration air leakageXIAOJUN WANGenergy_progress
05/06/2026Fenestration and door U-factor and product ratingsXIAOJUN WANGenergy_progress
05/06/2026VestibulesXIAOJUN WANGenergy_progress
05/06/2026Insulation placement and R valuesXIAOJUN WANGenergy_progress
05/06/2026Protection of exposed foundation insulationXIAOJUN WANGenergy_progress
05/06/2026Air barrier — testing XIAOJUN WANGenergy_progress
05/06/2026Air barrier - visual inspectionXIAOJUN WANGenergy_progress
05/06/2026Fenestration areasXIAOJUN WANGenergy_progress
05/06/2026Fire-Resistance Rated ConstructionXIAOJUN WANGprogress
05/06/2026Energy Code Compliance InspectionsXIAOJUN WANGprogress
05/06/2026Wall Panels, Curtain Walls, and VeneersXIAOJUN WANGspecial
05/06/2026Fire-Resistant Penetrations and JointsXIAOJUN WANGspecial
Latest 25 of 150.
▾Documents — 307 on file (BIS + DOB NOW)
▸Plans & Drawings36
▸DOB NOWPlans/Sketch33
08/21/2026Q01086357-P3Request digital key ↗
08/21/2026Q01086357-I1Request digital key ↗
08/21/2026Q01086357-P1Request digital key ↗
Showing 3 of 33 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
08/21/2026Q01123299-I1Request digital key ↗
08/21/2026Q01123303-I1Request digital key ↗
08/21/2026Q01123288-I1Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION9
07/28/2025440824565Open ↗
09/03/2024421084114Open ↗
05/17/2024440816912Open ↗
Showing 3 of 9 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
10/21/2024440816912Open ↗
▸BISWORK PERMIT APPLICATION1
09/04/2025440824565Open ↗
▸Zoning, Tax Lot & Property Records18
▸DOB NOWZD1: DOB Zoning Diagram5
08/17/2026Q01012069-A7Open ↗
08/17/2026Q01012069-A6Open ↗
08/17/2026Q01012069-P7Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/17/2026Q01012069-A7Open ↗
08/17/2026Q01012069-A6Open ↗
08/17/2026Q01012069-P7Open ↗
Showing 3 of 5 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
12/08/2025421843385Open ↗
03/31/2015421084114Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
12/08/2025421843385Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
03/31/2015421084114Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
12/08/2025421843385Open ↗
▸BISZONING DIAGRAM1
06/13/2015421084114Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
12/08/2025421843385Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications125
▸DOB NOWProgress Inspector Seal & Signature48
09/21/2026Q01012069-S1Open ↗
09/21/2026Q01012069-S1Open ↗
09/01/2026Q01012069-P3Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature36
08/21/2026Q01086357-I1Open ↗
08/21/2026Q01086357-P1Open ↗
08/21/2026Q01086357-P2Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature33
09/23/2026Q01012069-P5Open ↗
09/21/2026Q01012069-S1Open ↗
09/21/2026Q01012069-S1Open ↗
Showing 3 of 33 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
12/22/2015421084114Open ↗
06/11/2015421084114Open ↗
06/11/2015421084114Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
07/28/2025440824565Open ↗
04/23/2024440816912Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/28/2025440824565Open ↗
04/23/2024440816912Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/17/2026Q01012069-P7Open ↗
08/17/2026Q01012069-I1Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/21/2015421084114Open ↗
06/05/2015421084114Open ↗
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist5
08/17/2026Q01012069-A7Open ↗
08/17/2026Q01012069-A6Open ↗
08/17/2026Q01012069-P7Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST2
04/23/2024440816912Open ↗
03/31/2015421084114Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
10/21/2024440816912Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/17/2026Q01012069-I1Open ↗
▸Environmental & Asbestos46
▸DOB NOWOER: Notice to Proceed29
08/17/2026Q01012069-A7Open ↗
08/17/2026Q01012069-P8Open ↗
08/17/2026Q01012069-S1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWOER: Notice of Satisfaction13
08/17/2026Q01012069-I1Open ↗
08/13/2026Q01012069-S2Open ↗
Showing 2 of 13 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
07/28/2025440824565Open ↗
04/23/2024440816912Open ↗
06/01/2015421084114Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
01/28/2026440824565Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/31/2015421084114Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/04/2025440824565Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY4
09/04/2025440824565Open ↗
09/04/2025440824565Open ↗
08/12/2025440824565Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSOIL REPORT2
08/17/2026Q01012069-S2Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
06/11/2015421084114Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026Q01012069-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01012069-S2Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLETTERS - SUPPORTING DOCUMENTATION7
12/08/2025421843385Open ↗
12/08/2025421843385Open ↗
09/03/2024421084114Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
03/31/2015421084114Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION4
08/21/2025440824565Open ↗
10/21/2024440816912Open ↗
05/05/2023421084114Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
12/21/2015421084114Open ↗
06/05/2015421084114Open ↗
03/31/2015421084114Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
07/28/2025440824565Open ↗
04/23/2024440816912Open ↗
▸Other Documents26
▸DOB NOWSite Survey: Initial5
08/17/2026Q01012069-A7Open ↗
08/17/2026Q01012069-A6Open ↗
08/17/2026Q01012069-P7Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/17/2026Q01012069-A6Open ↗
08/17/2026Q01012069-P7Open ↗
08/17/2026Q01012069-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/17/2026Q01012069-A7Open ↗
08/17/2026Q01012069-A6Open ↗
08/17/2026Q01012069-P7Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM4
12/08/2025421843385Open ↗
06/11/2015421084114Open ↗
03/31/2015421084114Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
10/21/2024440816912Open ↗
10/21/2024440816912Open ↗
▸BISSITE CONNECTION:DEP1
09/06/2016421084114Open ↗
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
12/08/2025421843385Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
12/08/2025421843385Open ↗
▸DOB NOWFinal Survey1
08/17/2026Q01012069-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01012069-S2Open ↗