← Back
Condo, residential unit in walk-up building
78-03 19 DRIVE
QUEENS · BIN 4444613
💬 Discuss this project
0Year Built
—Stories
R2Building Class
R4Zoning
109,572 sfGross Floor Area
150Units
Rent Stabilized46 Open Violations ▸FDNY Report ↗
Condo, residential unit in walk-up building · 173,906 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction2p · 1 filing · 6 docs
Floor 14p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL CHRISTAKOS ARCHITECTURE207/16/2026
ALBERTO ROMAN110/26/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MAR DESIGN SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAR CODE INCGeneral Contractor303/21/2026
TAP PLUMBING CORPPlumbing107/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR-TECH ENGINEERING, P.C.6659110/26/2020
Building Lifecycle
All (21)Filed (3)Permit Issued (2)Violation (2)Inspection (1)Special Inspection (13)
08/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/21/2026
Permit issued — Plumbing
Q01409555-S1-PL
07/16/2026
Filed — Alteration
INTERIOR ALTERATION TO APARTMENT 2 ON THE 2ND FLOOR. WORK INCLUDES KITCHEN AND BATHROOM REMODEL, NEW LIGHTING, AND NEW HEAT-PUMP MINI-SPLIT SYSTEM. NO CHANGE TO OCCUPANCY, USE, OR EGRESS.
Q01409555-S1
07/10/2026
Filed — Alteration
INTERIOR ALTERATION TO APARTMENT 2 ON THE 2ND FLOOR. WORK INCLUDES KITCHEN AND BATHROOM REMODEL, NEW LIGHTING, AND NEW HEAT-PUMP MINI-SPLIT SYSTEM. NO CHANGE TO OCCUPANCY, USE, OR EGRESS.
Q01409555-I1
06/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/05/2026
Special inspection requirement — Interior lighting power
06/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/05/2026
Special inspection requirement — Maintenance information
05/29/2026
Special inspection requirement — Mechanical Systems
05/29/2026
Special inspection requirement — Final
11/09/2020
Permit issued — Mechanical Systems
Q00416260-I1-MS
10/26/2020
Filed — Alteration
Installation of new ductless air conditioning system as per plans. No change in use, occupancy or egress.
Q00416260-I1
10/20/2020
Special inspection requirement — Final
ALBERTO ROMAN
10/20/2020
Special inspection requirement — Mechanical Systems
ALBERTO ROMAN
10/20/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERTO ROMAN
10/20/2020
Special inspection requirement — Energy Code Compliance Inspections
ALBERTO ROMAN
10/20/2020
Special inspection requirement — HVAC and service water heating equipment
ALBERTO ROMAN
10/20/2020
Special inspection requirement — HVAC and service water heating system controls
ALBERTO ROMAN
01/15/2013
Violation issued (HPD, closed)
B
01/15/2013
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedTAP PLUMBING CORP07/21/2026
DOB NOWMechanical SystemsPermit IssuedMAR CODE INC11/09/2020
1 project · most recent 07/16/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/16/2026——Air Conditioning Systems
Cooling
Gree GREE Comfort, Model No. MUL36HP230V1R32A0 3 tons · Condensing Unit ×1
3 projects · most recent 06/04/2026
General Wiring
FiledStatusContractorScope
06/04/2026Permit IssuedATTRACTIVE LIGHTING ELECLGeneral Wiring
05/18/2026CompleteATTRACTIVE LIGHTING ELEC—
02/04/2021CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
06/05/2026HVAC-R and service water heating equipment—energy_progress
06/05/2026Interior lighting power—energy_progress
06/05/2026HVAC-R and service water heating system controls—energy_progress
06/05/2026HVAC-R and service water piping design and insulation—energy_progress
06/05/2026Maintenance information—energy_progress
05/29/2026Mechanical Systems—special
05/29/2026Final—progress
10/20/2020FinalALBERTO ROMANprogress
10/20/2020Mechanical SystemsALBERTO ROMANspecial
10/20/2020Fire-Resistant Penetrations and JointsALBERTO ROMANspecial
10/20/2020Energy Code Compliance InspectionsALBERTO ROMANprogress
10/20/2020HVAC and service water heating equipment ALBERTO ROMANenergy_progress
10/20/2020HVAC and service water heating system controls ALBERTO ROMANenergy_progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/16/2026Q01409555-S1Request digital key ↗
08/16/2026Q01409555-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/27/2026Q00416260-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026Q00416260-I1Open ↗
09/01/2026Q00416260-I1Open ↗
09/01/2026Q00416260-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026Q00416260-I1Open ↗
08/16/2026Q01409555-I1Open ↗
08/16/2026Q01409555-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q00416260-I1Open ↗
09/01/2026Q00416260-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026Q00416260-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026Q01409555-I1Open ↗
08/16/2026Q01409555-S1Open ↗