← Back
Two stories - detached, small or mid-size
78-09 86 STREET
QUEENS · BIN 4094030
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R4-1Zoning
1,438 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,500 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1p · 1 filing · 10 docs
1 job · most recent 12/12/2022
Gas Water/Sanitary
FiledStatusContractorScope
12/12/2022——Gas, Water/Sanitary
Building Lifecycle
All (10)Filed (2)Objection (4)Special Inspection (4)
12/14/2022
Objection raised — Inspections
12/14/2022
Objection resolved — Addressed
12/14/2022
Objection raised — Scope
12/14/2022
Objection resolved — Addressed
12/12/2022
Filed — Alteration
1. REMOVE AND CAP BATHTUB IN THE BATHROOM AND SINK IN THE KITCHEN.2. INSTALL 2PC POWDER FIXTURS INCLUDING (01) WASH BASIN AND (01) WATER CLOSET.3. INSTALL DRYER AND WASHER IN THE CELLAR.4. REMOVE & CAP EXISTING GAS STOVE.
Q08052873-S1
12/11/2022
Filed — Alteration
1. REMOVE AND CAP BATHTUB IN THE BATHROOM AND SINK IN THE KITCHEN.2. INSTALL 2PC POWDER FIXTURS INCLUDING (01) WASH BASIN AND (01) WATER CLOSET.3. INSTALL DRYER AND WASHER IN THE CELLAR.4. REMOVE & CAP EXISTING GAS STOVE.
Q08052873-I1
12/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMIR ABDALLA
12/11/2022
Special inspection requirement — Final
SAMIR ABDALLA
12/11/2022
Special inspection requirement — Energy Code Compliance Inspections
SAMIR ABDALLA
12/11/2022
Special inspection requirement — Lighting in dwelling units
SAMIR ABDALLA
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DNS FINE BUILDERS403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/13/2020$710K—Private party → Private party$494/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LIGHT HOUSE212/12/2022
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LIGHTHOUSE5538112/11/2022
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
12/11/2022Fire-Resistant Penetrations and JointsSAMIR ABDALLAspecial
12/11/2022FinalSAMIR ABDALLAprogress
12/11/2022Energy Code Compliance InspectionsSAMIR ABDALLAprogress
12/11/2022Lighting in dwelling unitsSAMIR ABDALLAenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026Q08052873-I1Request digital key ↗
08/15/2026Q08052873-S1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026Q08052873-I1Open ↗
08/23/2026Q08052873-I1Open ↗
08/23/2026Q08052873-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026Q08052873-S1Open ↗
08/25/2026Q08052873-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q08052873-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026Q08052873-I1Open ↗
08/15/2026Q08052873-S1Open ↗