← Back
Two stories - detached, small or mid-size
78-13 88 AVENUE
QUEENS · BIN 4183345
💬 Discuss this project
1910Year Built
2.5Stories
A1Building Class
R3-1Zoning
1,520 sfGross Floor Area
1Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,000 sf lot · 0.76 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC110/04/2024
ROJAS ENGINEERING, PLLC103/31/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&E SMOOTH TRANSFORMATIONGeneral Contractor107/08/2026
NYS ESSENTIAL POWER INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854110/04/2024
ROJAS ENGINEERING PLLC6232103/31/2021
Building Lifecycle
All (11)Filed (2)Permit Issued (2)Signed Off (1)Violation (4)Special Inspection (2)
12/06/2024
Signed off — Alteration
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
Q01122428-I1
10/10/2024
Permit issued — Solar
Q01122428-I1-SL
10/04/2024
Filed — Alteration
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
Q01122428-I1
04/28/2021
Permit issued — General Construction
Q00490374-I1-GC
03/31/2021
Filed — Alteration
Resolve ECB violations #35371525N & 37017327N; Removal of existing one-story structure and canopy at rear yard, and installation of a rear deck. No change in use, egress or occupancy under this application.
Q00490374-I1
03/22/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Darlyn Alvarez
03/22/2021
Special inspection requirement — Final
Darlyn Alvarez
02/13/2020
Violation issued (ECB, closed)
Construction
03/22/2019
Violation issued (ECB, closed)
Construction
12/29/2006
Violation issued (ECB, open)
Quality of Life
11/15/2006
Violation issued (ECB, open)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYS ESSENTIAL POWER INC10/10/2024
DOB NOWGeneral ConstructionPermit IssuedJ&E SMOOTH TRANSFORMATION04/28/2021
1 job · most recent 11/22/2024
FiledStatusContractorScope
11/22/2024CompleteAMBER ELECTL CONTNG INC—
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
03/22/2021Structural Stability – Alterations of existing buildingsDarlyn Alvarezspecial
03/22/2021FinalDarlyn Alvarezprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026Q00490374-I1Request digital key ↗
08/21/2026Q01122428-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q00490374-I1Open ↗
08/13/2026Q01122428-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026Q00490374-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026Q00490374-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00490374-I1Open ↗
08/13/2026Q01122428-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01122428-I1Open ↗