← Back
BuildNYC
Two stories - detached, small or mid-size
78-16 269TH STREET
QUEENS · BIN 4177408
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2AZoning
1,998 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofResidential Rooftop Grid-tied Solar PV System3p · 2 filings · 20 docs
PenthouseInterior Renovation of Existing One Family House with Horizo5p · 1 filing · 20 docs
AtticInterior Renovation of Existing One Family House with Horizo5p · 2 filings · 20 docs
Floor 2Interior Renovation of Existing One Family House with Horizo8p · 2 filings · 20 docs
Floor 1Interior Renovation of Existing One Family House with Horizo5p · 2 filings · 20 docs
CellarInterior Renovation of Existing One Family House with Horizo12p · 2 filings · 20 docs
Site & exteriorTemporary construction fence installation4p · 2 filings · 18 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/17/2023$1.3M—Private party → Private party$637/sf building
06/08/2022$715K—Private party → Private party$358/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Square Arch101/30/2025
Nasir J, Khanzada1007/25/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Nasir J. Khanzada2003/21/2026
Amergy Solar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Amergy SolarGeneral Contractor303/21/2026
HNJ ConstructionGeneral Contractor107/08/2026
HNJ ConstructionScaffold107/08/2026
Sai JI PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sq. Arch4802101/30/2025
Nasir J. Khanzada1527707/25/2023
Building Lifecycle
All (63)Filed (11)Permit Issued (4)Signed Off (3)Violation (1)Inspection (6)Objection (8)Special Inspection (30)
04/14/2025
Signed off — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01169125-I1
01/31/2025
Permit issued — Solar
Q01169125-I1-SL
01/30/2025
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01169125-I1
01/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chun Feng
01/20/2025
Special inspection requirement — Final
Chun Feng
01/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
01/20/2025
Special inspection requirement — Air barrier - visual inspection
Chun Feng
01/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
07/25/2023
Filed — Alteration CO
APPLICATION FILED FOR INTERIOR RENOVATION OF EXISTING ONE FAMILY DWELLING WITH NEW REAR EXTENSION AND TO OBTAIN NEW C OF O.
Q08001487-P4
07/24/2023
Special inspection requirement — Structural Steel - Welding
Nasir Khanzada
07/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
07/24/2023
Special inspection requirement — Concrete - Cast-In-Place
Nasir Khanzada
07/24/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Nasir Khanzada
07/24/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nasir Khanzada
07/24/2023
Special inspection requirement — Fenestration air leakage
Nasir Khanzada
07/24/2023
Special inspection requirement — Masonry
Nasir Khanzada
07/24/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Nasir Khanzada
07/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
07/24/2023
Special inspection requirement — Structural Wood Frame
Nasir Khanzada
07/24/2023
Special inspection requirement — Insulation placement and R values
Nasir Khanzada
07/24/2023
Special inspection requirement — Fire-Resistance Rated Construction
Nasir Khanzada
07/24/2023
Special inspection requirement — Air barrier - visual inspection
Nasir Khanzada
07/24/2023
Special inspection requirement — Final
Nasir Khanzada
07/24/2023
Special inspection requirement — Footing and Foundation
Nasir Khanzada
07/24/2023
Special inspection requirement — Fenestration areas
Nasir Khanzada
07/24/2023
Special inspection requirement — Interior lighting power
Nasir Khanzada
07/20/2023
Signed off — Alteration
APPLICATION FILED FOR TEMPORARY CONSTRUCTION FENCE INCONJUCTION WITH DOB NOW APPLICATION#Q08001487-I1
Q08002922-I1
07/17/2023
Signed off — Alteration
APPLICATION FILED TO INSTALLING NEW PLUMBING FIXTURE AND GAS EQUIPMENT IN CONJUNCTION WITH ALT-1 APPLICATION#Q08001487-I1
Q08022107-I1
07/12/2023
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
07/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
06/27/2023
Filed — Alteration
APPLICATION FILED TO INSTALLING NEW PLUMBING FIXTURE AND GAS EQUIPMENT IN CONJUNCTION WITH ALT-1 APPLICATION#Q08001487-I1
Q08022107-P3
06/27/2023
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
06/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
06/26/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/23/2023
Objection resolved — Addressed
05/19/2023
Objection raised — Other
05/16/2023
Filed — Alteration CO
APPLICATION FILED FOR INTERIOR RENOVATION OF EXISTING ONE FAMILY DWELLING WITH NEW REAR EXTENSION AND TO OBTAIN NEW C OF O.
Q08001487-P3
03/15/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/15/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/15/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/10/2023
Permit issued — Plumbing
Q08022107-I1-PL
02/02/2023
Filed — Alteration
APPLICATION FILED TO INSTALLING NEW PLUMBING FIXTURE AND GAS EQUIPMENT IN CONJUNCTION WITH ALT-1 APPLICATION#Q08001487-I1
Q08022107-P2
02/01/2023
Special inspection requirement — Interior lighting power
Nasir Khanzada
02/01/2023
Special inspection requirement — Insulation placement and R values
Nasir Khanzada
02/01/2023
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
02/01/2023
Special inspection requirement — Fenestration air leakage
Nasir Khanzada
01/06/2023
Violation issued (ECB, closed)
Construction
12/15/2022
Filed — Alteration
APPLICATION FILED TO INSTALLING NEW PLUMBING FIXTURE AND GAS EQUIPMENT IN CONJUNCTION WITH ALT-1 APPLICATION#Q08001487-I1
Q08022107-P1
12/15/2022
Objection resolved — Addressed
12/13/2022
Objection raised — Energy
12/06/2022
Filed — Alteration CO
APPLICATION FILED FOR INTERIOR RENOVATION OF EXISTING ONE FAMILY DWELLING WITH NEW REAR EXTENSION AND TO OBTAIN NEW C OF O.
Q08001487-P2
12/05/2022
Permit issued — Foundation
Q08001487-I1-GC-CX
11/25/2022
Filed — Alteration CO
APPLICATION FILED FOR INTERIOR RENOVATION OF EXISTING ONE FAMILY DWELLING WITH NEW REAR EXTENSION AND TO OBTAIN NEW C OF O.
Q08001487-P1
10/31/2022
Objection raised — Other
10/31/2022
Objection resolved — Addressed
10/26/2022
Filed — Alteration
APPLICATION FILED TO INSTALLING NEW PLUMBING FIXTURE AND GAS EQUIPMENT IN CONJUNCTION WITH ALT-1 APPLICATION#Q08001487-I1
Q08022107-I1
10/06/2022
Permit issued — Construction Fence
Q08002922-I1-FN
09/22/2022
Objection raised — Scope
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offAmergy Solar01/31/2025
DOB NOWPlumbingSigned-offSai JI Plumbing02/10/2023
DOB NOWFoundationPermit IssuedHNJ Construction12/05/2022
DOB NOWConstruction FenceSigned-offHNJ Construction10/06/2022
BISOTISSUEDSunrun Installation Service03/17/2017
2 projects · most recent 01/28/2025
General Wiring Lighting
FiledStatusContractorScope
01/28/2025CompleteI.P. Electric—
02/02/2023CompleteBDS ElectricGeneral Wiring, Lighting
1 project · most recent 07/25/2023
Wood
FiledStatusContractorScope
07/25/2023Permit IssuedHNJ ConstructionWood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/26/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/15/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/15/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/27/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
01/20/2025Fire-Resistant Penetrations and JointsChun Fengspecial
01/20/2025Structural Stability – Alterations of existing buildingsChun Fengspecial
01/20/2025Energy Code Compliance InspectionsChun Fengprogress
01/20/2025Air barrier - visual inspectionChun Fengenergy_progress
01/20/2025FinalChun Fengprogress
07/24/2023Fire-Resistance Rated ConstructionNasir Khanzadaprogress
07/24/2023Footing and FoundationNasir Khanzadaprogress
07/24/2023Structural Wood FrameNasir Khanzadaprogress
07/24/2023Air barrier - visual inspectionNasir Khanzadaenergy_progress
07/24/2023Insulation placement and R valuesNasir Khanzadaenergy_progress
07/24/2023Fenestration areasNasir Khanzadaenergy_progress
07/24/2023Fenestration air leakageNasir Khanzadaenergy_progress
07/24/2023Fenestration and door U-factor and product ratingsNasir Khanzadaenergy_progress
07/24/2023Interior lighting powerNasir Khanzadaenergy_progress
07/24/2023MasonryNasir Khanzadaspecial
07/24/2023Structural Steel - High Strength BoltingNasir Khanzadaspecial
07/24/2023Structural Steel - WeldingNasir Khanzadaspecial
07/24/2023Energy Code Compliance InspectionsNasir Khanzadaprogress
07/24/2023FinalNasir Khanzadaprogress
07/24/2023Concrete - Cast-In-PlaceNasir Khanzadaspecial
07/24/2023Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
07/24/2023Structural Stability – Alterations of existing buildingsNasir Khanzadaspecial
07/12/2023Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
07/12/2023Energy Code Compliance InspectionsNasir Khanzadaprogress
06/27/2023Energy Code Compliance InspectionsNasir Khanzadaprogress
Latest 25 of 81.
▾Documents — 104 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/25/2026Q08002922-I1Request digital key ↗
08/25/2026Q08022107-P3Request digital key ↗
08/25/2026Q08022107-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
06/05/2017440390970Open ↗
03/16/2017440390970Open ↗
▸BISWORK PERMIT APPLICATION1
03/16/2017440390970Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026Q08001487-I1Open ↗
08/13/2026Q08001487-P1Open ↗
08/13/2026Q08001487-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08001487-I1Open ↗
▸Seals & Professional Certifications38
▸DOB NOWProgress Inspector Seal & Signature15
09/13/2026Q08022107-P3Open ↗
09/02/2026Q08022107-I1Open ↗
09/01/2026Q08001487-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/25/2026Q08022107-P1Open ↗
08/25/2026Q08022107-I1Open ↗
08/25/2026Q08022107-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/13/2026Q08022107-P3Open ↗
09/02/2026Q08022107-I1Open ↗
09/01/2026Q08001487-P1Open ↗
Showing 3 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/16/2017440390970Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/16/2017440390970Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/16/2017440390970Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist5
08/13/2026Q08001487-P1Open ↗
08/13/2026Q08001487-P2Open ↗
08/13/2026Q08001487-P3Open ↗
Showing 3 of 5 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
03/16/2017440390970Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/25/2026Q08022107-P3Open ↗
08/25/2026Q08022107-P2Open ↗
08/25/2026Q08022107-P1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/16/2017440390970Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/16/2017440390970Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/16/2017440390970Open ↗
▸BISNYCECC ANALYSIS1
03/16/2017440390970Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
03/16/2017440390970Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/16/2017440390970Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01169125-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
03/16/2017440390970Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
03/16/2017440390970Open ↗
▸Other Documents22
▸DOB NOWSite Survey: Initial5
08/13/2026Q08001487-I1Open ↗
08/13/2026Q08001487-P1Open ↗
08/13/2026Q08001487-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026Q08001487-I1Open ↗
08/13/2026Q08001487-P4Open ↗
08/13/2026Q08001487-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlot Diagram5
08/13/2026Q08001487-P2Open ↗
08/13/2026Q08001487-I1Open ↗
08/13/2026Q08001487-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/13/2026Q08001487-I1Open ↗
08/13/2026Q08001487-P1Open ↗
08/13/2026Q08001487-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q08001487-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q08001487-I1Open ↗