← Back
Special condominium billing lot
78 1ST PLACE
💬 Discuss this project
2024Year Built
6.5Stories
R0Building Class
R6AZoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Special condominium billing lot · Owner of record: 78 1ST PL LLC · 2,767 sf lot · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof57p · 1 filing · 20 docs
Penthouse61p · 1 filing · 20 docs
Floor 660p · 1 filing · 20 docs
Floor 557p · 1 filing · 20 docs
Floor 458p · 1 filing · 20 docs
Floor 356p · 1 filing · 20 docs
Floor 258p · 1 filing · 20 docs
Floor 156p · 1 filing · 20 docs
Cellar62p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
76 1ST PL4307/08/2026
78 1ST PL LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FABIAN CRUZ PE PLLC504/16/2026
PAUL CHRISTAKOS ARCHITECTURE706/24/2025
JIAN ENGINEERING PLLC405/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ACCRETE CONSTRUCTION1603/21/2026
H Z BUILDING NY603/21/2026
SD DESIGN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACER CONSTRUCTION INCGeneral Contractor1007/08/2026
PRECISION SPKLR SVCS LLCFire Protection107/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC73971304/16/2026
IP CONCRETE TESTING AND I6252206/13/2024
PAUL CHRISTAKOS ARCHITECT5894206/13/2024
Building Lifecycle
All (131)Filed (16)Permit Issued (10)Signed Off (7)Violation (5)Inspection (8)Objection (55)Special Inspection (30)
05/23/2026
Signed off — New Building
NEW 6-STORY + PENTHOUSE, 6-FAMILY BUILDING
B00885893-S6
05/11/2026
Violation issued (HPD, closed)
A
05/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
JIAN DENG
05/05/2026
Special inspection requirement — Final
JIAN DENG
05/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
05/05/2026
Special inspection requirement — Shutoff dampers
JIAN DENG
05/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
05/05/2026
Special inspection requirement — Mechanical Systems
JIAN DENG
05/05/2026
Special inspection requirement — Duct leakage testing, insulation and design
JIAN DENG
05/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
JIAN DENG
05/05/2026
Special inspection requirement — Heating Systems
JIAN DENG
05/05/2026
Special inspection requirement — Maintenance information
JIAN DENG
04/30/2026
Objection resolved — Addressed
04/24/2026
Objection raised — Scope
04/23/2026
Objection raised — Scope
04/23/2026
Objection resolved — Addressed
04/16/2026
Filed — New Building
NEW 6-STORY + PENTHOUSE, 6-FAMILY BUILDING
B00885893-P8
03/11/2026
Signed off — New Building
NEW 6-STORY + PENTHOUSE, 6-FAMILY BUILDING
B00885893-S9
03/09/2026
Violation issued (ECB, closed)
Elevators
02/05/2026
Violation issued (FDNY_NOV, closed)
09/23/2025
Violation issued (FDNY_NOV, closed)
07/31/2025
Signed off — New Building
NEW 6-STORY + PENTHOUSE, 6-FAMILY BUILDING
B00885893-S5
07/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/20/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/17/2025
Special inspection requirement — Interior lighting power
JIAN DENG
07/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
07/17/2025
Special inspection requirement — Fenestration air leakage
JIAN DENG
07/17/2025
Special inspection requirement — Metering
JIAN DENG
07/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JIAN DENG
07/17/2025
Special inspection requirement — Lighting controls
JIAN DENG
07/17/2025
Special inspection requirement — Exterior lighting power
JIAN DENG
07/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
JIAN DENG
07/17/2025
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
07/17/2025
Special inspection requirement — Air barrier - visual inspection
JIAN DENG
07/17/2025
Special inspection requirement — Fenestration areas
JIAN DENG
07/17/2025
Special inspection requirement — Lighting in dwelling units
JIAN DENG
07/17/2025
Special inspection requirement — Insulation placement and R values
JIAN DENG
07/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/10/2025
Special inspection requirement — Sprinkler Systems
JIAN DENG
07/09/2025
Filed — New Building
NEW 6-STORY + PENTHOUSE, 6-FAMILY BUILDING
B00885893-P7
07/08/2025
Special inspection requirement — Shutoff dampers
JIAN DENG
07/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
JIAN DENG
07/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
07/08/2025
Special inspection requirement — Duct leakage testing, insulation and design
JIAN DENG
07/08/2025
Special inspection requirement — Maintenance information
JIAN DENG
07/08/2025
Special inspection requirement — Final
JIAN DENG
06/24/2025
Filed — New Building
NEW 6-STORY + PENTHOUSE, 6-FAMILY BUILDING
B00885893-P6
06/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/10/2025
Violation issued (FDNY_ORDER, closed)
06/02/2025
Filed — New Building
NEW 6-STORY + PENTHOUSE, 6-FAMILY BUILDING
B00885893-P5
05/18/2025
Objection resolved — Addressed
05/18/2025
Objection resolved — Addressed
05/18/2025
Objection resolved — Addressed
05/18/2025
Objection resolved — Addressed
05/14/2025
Objection raised — Zoning
05/07/2025
Objection resolved — Addressed
04/23/2025
Objection raised — Other
04/23/2025
Objection raised — Other
04/23/2025
Objection raised — Scope
04/23/2025
Objection raised — Fire_Protection
Latest 60 of 131 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedACER CONSTRUCTION INC02/28/2025
DOB NOWMechanical SystemsSigned-offACER CONSTRUCTION INC10/21/2024
DOB NOWSprinklersSigned-offPRECISION SPKLR SVCS LLC08/20/2024
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR06/20/2024
DOB NOWStructuralSigned-offACER CONSTRUCTION INC05/23/2024
DOB NOWStructuralSigned-offACER CONSTRUCTION INC05/21/2024
DOB NOWConstruction FenceSigned-offACER CONSTRUCTION INC05/10/2024
DOB NOWSupport of ExcavationSigned-offACER CONSTRUCTION INC02/22/2024
DOB NOWGeneral ConstructionPermit IssuedACER CONSTRUCTION INC02/21/2024
DOB NOWFoundationSigned-offACER CONSTRUCTION INC02/21/2024
1 project · most recent 04/16/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/16/2026Permit IssuedACER CONSTRUCTION INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Cooper & Hunter CH-HPR48M-230VO 50,000 BTU · Heat Pump Outdoor ×10
CH-HPR18-230VO 19,000 BTU · Heat Pump Outdoor ×2
CH-HPR55M-230VO 55,000 BTU · Heat Pump Outdoor ×2
Ventilation
Broan 696 50 CFM · Exhaust Fan ×2
Gb Series GB SERIES 400 CFM · Kitchen Exhaust ×2
1 project · most recent 04/16/2026
Sprinkler System
FiledStatusContractorScope
04/16/2026Signed-offPRECISION SPKLR SVCS LLCSprinkler System
1 project · most recent 04/16/2026
Storm Water/Sanitary
FiledStatusContractorScope
04/16/2026Signed-offINFINITI ESC PLUMBING CORStorm, Water/Sanitary
2 projects · most recent 10/22/2025
General Wiring
FiledStatusContractorScope
10/22/2025CompleteK.A.B. ELECTRIC CORPGeneral Wiring
09/26/2025CompleteK.A.B. ELECTRIC CORPGeneral Wiring
1 project · most recent 04/16/2026
Concrete Masonry
FiledStatusContractorScope
04/16/2026Permit IssuedACER CONSTRUCTION INCConcrete, Masonry
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/20/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/18/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/11/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/11/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 100
DateRequirementInspectorRole
05/05/2026Fire-Resistant Penetrations and JointsJIAN DENGspecial
05/05/2026Duct leakage testing, insulation and designJIAN DENGenergy_progress
05/05/2026Maintenance informationJIAN DENGenergy_progress
05/05/2026HVAC-R and service water heating system controlsJIAN DENGenergy_progress
05/05/2026Shutoff dampersJIAN DENGenergy_progress
05/05/2026HVAC-R and service water heating equipmentJIAN DENGenergy_progress
05/05/2026FinalJIAN DENGprogress
05/05/2026Heating SystemsJIAN DENGspecial
05/05/2026Mechanical SystemsJIAN DENGspecial
05/05/2026HVAC-R and service water piping design and insulationJIAN DENGenergy_progress
07/17/2025Interior lighting powerJIAN DENGenergy_progress
07/17/2025Fenestration air leakageJIAN DENGenergy_progress
07/17/2025Exterior lighting powerJIAN DENGenergy_progress
07/17/2025Fenestration and door U-factor and product ratingsJIAN DENGenergy_progress
07/17/2025Lighting in dwelling unitsJIAN DENGenergy_progress
07/17/2025Fenestration areasJIAN DENGenergy_progress
07/17/2025Lighting controlsJIAN DENGenergy_progress
07/17/2025Air barrier - visual inspectionJIAN DENGenergy_progress
07/17/2025Insulation placement and R valuesJIAN DENGenergy_progress
07/17/2025MeteringJIAN DENGenergy_progress
07/17/2025Energy Code Compliance InspectionsJIAN DENGprogress
07/17/2025Fire-Resistance Rated ConstructionJIAN DENGprogress
07/17/2025Fire-Resistant Penetrations and JointsJIAN DENGspecial
07/10/2025Sprinkler SystemsJIAN DENGspecial
07/08/2025FinalJIAN DENGprogress
Latest 25 of 100.
▾Documents — 174 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/25/2026B01048264-I1Request digital key ↗
08/17/2026B00885893-S7Request digital key ↗
08/17/2026B00885893-S5Request digital key ↗
Showing 3 of 16 on file for this type
▸Zoning, Tax Lot & Property Records14
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B00885893-I1Open ↗
08/13/2026B00885893-P6Open ↗
08/13/2026B00885893-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026B00885893-P6Open ↗
08/13/2026B00885893-I1Open ↗
08/13/2026B00885893-P4Open ↗
Showing 3 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
06/26/2024322114644Open ↗
▸BISZONING EXHIBIT II: CERTIFICATION1
06/26/2024322114644Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
06/26/2024322114644Open ↗
▸BISZONING EXHIBIT IV: CERTIFICATION1
06/26/2024322114644Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/26/2024322114644Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00885893-I1Open ↗
▸Seals & Professional Certifications110
▸DOB NOWProgress Inspector Seal & Signature68
09/23/2026B00885893-P6Open ↗
09/23/2026B00885893-P6Open ↗
09/01/2026B00885893-Z1Open ↗
Showing 3 of 68 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature26
09/24/2026B00885893-S8Open ↗
09/24/2026B00885893-S8Open ↗
09/24/2026B00885893-S8Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/25/2026B01048264-I1Open ↗
08/17/2026B00885893-S5Open ↗
08/17/2026B00885893-S6Open ↗
Showing 3 of 16 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026B00885893-P6Open ↗
08/13/2026B00885893-P4Open ↗
08/13/2026B00885893-P2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/17/2026B00885893-I1Open ↗
08/17/2026B00885893-P6Open ↗
08/15/2026B00885893-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00885893-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00885893-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00885893-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00885893-S8Open ↗
08/13/2026B00885893-S7Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026B00885893-S8Open ↗
08/13/2026B00885893-S7Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION3
06/26/2024322114644Open ↗
06/25/2024322114644Open ↗
06/25/2024322114644Open ↗
▸Other Documents16
▸DOB NOWSite Survey: Initial4
08/13/2026B00885893-P2Open ↗
08/13/2026B00885893-P4Open ↗
08/13/2026B00885893-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B00885893-P4Open ↗
08/13/2026B00885893-P2Open ↗
08/13/2026B00885893-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/17/2026B00885893-I1Open ↗
08/17/2026B00885893-P6Open ↗
08/15/2026B00885893-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey2
08/17/2026B00885893-I1Open ↗
08/13/2026B00885893-I1Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
06/26/2024322114644Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00885893-S8Open ↗