← Back
Two family frame
78-29 84 STREET
QUEENS · Glendale · BIN 4093900
💬 Discuss this project
1925Year Built
2Stories
B2Building Class
R4-1Zoning
2,408 sfGross Floor Area
2Units
Two family frame · 2,667 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 22p · 2 filings · 14 docs
Floor 13p · 2 filings · 14 docs
Cellar6p · 2 filings · 14 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/22/2025$1.2M—TOTH PREMISES TRUST IRREV. INTER VIVOS TRUST → Private party$498/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FARHAD BASSIRI-TEHRANI406/16/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor303/21/2026
KJK ELECTRIC INCElectrical103/22/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394206/16/2025
Building Lifecycle
All (17)Filed (4)Permit Issued (2)Signed Off (2)Inspection (6)Special Inspection (3)
07/11/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW YARD DRAIN AT REAR YARD; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLI
Q01175762-I1
07/09/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01175760-I1
07/08/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/16/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01175760-P1
06/16/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW YARD DRAIN AT REAR YARD; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLI
Q01175762-P1
06/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
06/16/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
06/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
06/12/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/04/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/04/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/12/2025
Permit issued — Plumbing
Q01175762-I1-PL
02/12/2025
Permit issued — General Construction
Q01175760-I1-GC
02/10/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW YARD DRAIN AT REAR YARD; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLI
Q01175762-I1
02/10/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01175760-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC02/12/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC02/12/2025
1 project · most recent 07/09/2025
General Wiring
FiledStatusContractorScope
07/09/2025CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/08/2025Pass-Final General Construction Non-Directive 14PassView ↗
06/12/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/04/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/04/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
06/16/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
06/16/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
06/16/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026Q01175760-I1Request digital key ↗
08/20/2026Q01175760-P1Request digital key ↗
08/20/2026Q01175762-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 14
08/20/2026Q01175762-I1Open ↗
08/13/2026Q01175760-P1Open ↗
08/13/2026Q01175762-P1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/20/2026Q01175762-I1Open ↗
08/13/2026Q01175760-I1Open ↗
08/13/2026Q01175760-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026Q01175760-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q01175760-P1Open ↗