← Back
BuildNYC
Elevator cooperative
The Renee
78-40 164TH STREET · Name © OpenStreetMap contributors · BIN 4148338
💬 Discuss this project
1963Year Built
6Stories
D4Building Class
R3-2Zoning
98,516 sfGross Floor Area
119Units
LL97 CoveredRent Stabilized118 Active Violations 116 unresolved · 2 paperwork only 7 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: Renee Owners · 28,350 sf lot · 3.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofGenerator installation on roof platform18p · 8 filings · 20 docs
Floor 6Unit 6U4p · 1 filing · 8 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Decommission of existing telecom site1 filing · 6 docs
CellarInstallation of gas meter and gas piping13p · 2 filings · 20 docs
Site & exteriorInstallation of gas meter and gas piping13p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Safe-Shield Enterprises503/22/2026
Clear Wireless203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tectonic Engineering710/03/2024
A Saxon Design Group109/05/2024
AA Building & Inspection Service202/05/2024
Dario Pasquariello Architect308/03/2023
Ashraf107/08/2022
MDG Design Group307/06/2021
Green Design206/25/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM Services Group703/21/2026
Construction Permit Services503/21/2026
Danico Services203/21/2026
M-Dis Design Group303/21/2026
Dmconsulting6860403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ramapo CommunicationGeneral Contractor1007/08/2026
MNK EnterprisesScaffold807/08/2026
Squan Construction ServicesGeneral Contractor407/08/2026
Associated Electric Cont of NElectrical403/21/2026
Odyssia Global CommercialGeneral Contractor307/08/2026
Safe-Sheild EnterpriseScaffold303/21/2026
IronboGeneral Contractor307/08/2026
Aura PlumbingPlumbing207/08/2026
Aurora P & H ContFire Protection207/08/2026
TristruxGeneral Contractor203/21/2026
Levest Electricspecialty_contractor203/21/2026
Sal Napoli Plumbing & HeatingPlumbing107/08/2026
Lion Heart ElectricElectrical103/21/2026
All Ways Electric Corp.wElectrical103/21/2026
Joseph Weinstein ElectricElectrical103/22/2026
Lit Mode Electrical ContgElectrical103/22/2026
Ronald Testa, JRElectrical103/21/2026
Gim ConstructionGeneral Contractor107/08/2026
Remax ConstructionGeneral Contractor107/08/2026
Crossland Management & EElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106510/03/2024
R Marsac Consulting329109/05/2024
Dario Architecture & Desig6878208/03/2023
Sead Engineering2665207/06/2021
Building Lifecycle
All (209)Filed (19)Permit Issued (25)Signed Off (11)Facade (FISP) (12)Violation (60)Inspection (11)Objection (54)Special Inspection (17)
08/10/2026
Violation issued (HPD, open)
B
08/10/2026
Violation issued (HPD, open)
C
08/10/2026
Violation issued (HPD, open)
C
08/10/2026
Violation issued (HPD, open)
A
08/10/2026
Violation issued (HPD, closed)
C
08/10/2026
Violation issued (HPD, open)
C
08/10/2026
Violation issued (HPD, open)
B
08/10/2026
Violation issued (HPD, open)
C
08/05/2026
Violation issued (HPD, open)
C
08/05/2026
Violation issued (HPD, open)
A
08/05/2026
Violation issued (HPD, open)
C
08/05/2026
Violation issued (HPD, open)
A
07/21/2026
Violation issued (HPD, open)
A
07/21/2026
Violation issued (HPD, open)
A
07/21/2026
Violation issued (HPD, open)
B
07/21/2026
Violation issued (HPD, open)
A
07/21/2026
Violation issued (HPD, open)
A
07/21/2026
Violation issued (HPD, open)
A
07/21/2026
Violation issued (HPD, open)
B
07/21/2026
Violation issued (HPD, open)
A
07/21/2026
Violation issued (HPD, open)
A
07/21/2026
Violation issued (HPD, open)
A
07/18/2026
Violation issued (HPD, open)
B
07/15/2026
Violation issued (HPD, open)
A
05/26/2026
Violation issued (HPD, closed)
C
05/07/2026
Violation issued (HPD, open)
B
05/07/2026
Violation issued (HPD, closed)
C
05/07/2026
Violation issued (HPD, open)
C
05/07/2026
Violation issued (HPD, open)
B
05/07/2026
Violation issued (HPD, open)
C
05/07/2026
Violation issued (HPD, closed)
B
05/07/2026
Violation issued (HPD, closed)
B
05/07/2026
Violation issued (HPD, open)
C
05/07/2026
Violation issued (HPD, closed)
B
05/07/2026
Violation issued (HPD, closed)
B
05/07/2026
Violation issued (HPD, closed)
B
01/30/2026
Violation issued (HPD, closed)
C
01/30/2026
Violation issued (HPD, closed)
B
01/04/2026
Violation issued (HPD, closed)
C
12/29/2025
Violation issued (HPD, closed)
B
12/29/2025
Violation issued (HPD, closed)
C
12/29/2025
Violation issued (HPD, closed)
B
12/29/2025
Violation issued (HPD, closed)
C
12/29/2025
Violation issued (HPD, closed)
B
12/29/2025
Violation issued (HPD, closed)
C
12/29/2025
Violation issued (HPD, closed)
C
12/29/2025
Violation issued (HPD, closed)
C
12/19/2025
Violation issued (HPD, closed)
B
12/19/2025
Violation issued (HPD, closed)
C
12/19/2025
Violation issued (HPD, open)
C
12/06/2025
Violation issued (HPD, open)
C
12/06/2025
Violation issued (HPD, closed)
B
11/19/2025
Violation issued (HPD, closed)
C
11/19/2025
Violation issued (HPD, closed)
C
11/19/2025
Violation issued (HPD, closed)
B
11/19/2025
Violation issued (HPD, closed)
C
11/19/2025
Violation issued (HPD, closed)
B
11/14/2025
Violation issued (HPD, closed)
A
11/14/2025
Violation issued (HPD, closed)
C
11/03/2025
Violation issued (HPD, open)
B
Latest 60 of 209 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTristrux10/04/2024
DOB NOWMechanical SystemsSigned-offOdyssia Global Commercial06/06/2024
DOB NOWAntennaSigned-offOdyssia Global Commercial06/03/2024
DOB NOWPlumbingSigned-offAura Plumbing05/10/2024
DOB NOWGeneral ConstructionSigned-offRemax Construction04/24/2023
DOB NOWAntennaSigned-offSquan Construction Services02/27/2023
DOB NOWSidewalk ShedSigned-offMNK Enterprises02/22/2023
DOB NOWMechanical SystemsSigned-offRamapo Communication02/06/2023
DOB NOWAntennaSigned-offRamapo Communication02/06/2023
DOB NOWGeneral ConstructionSigned-offRichter + Ratner Builders10/28/2022
DOB NOWMechanical SystemsSigned-offRamapo Communication09/01/2022
DOB NOWAntennaSigned-offRamapo Communication09/01/2022
DOB NOWPlumbingSigned-offAura Plumbing09/01/2022
DOB NOWSupported ScaffoldSigned-offSafe-Sheild Enterprise07/09/2022
DOB NOWSprinklersPermit IssuedAurora P & H Cont01/21/2022
DOB NOWSidewalk ShedSigned-offMNK Enterprises01/19/2022
DOB NOWGeneral ConstructionSigned-offSquan Construction Services01/17/2022
DOB NOWAntennaSigned-offIronbo07/09/2021
DOB NOWAntennaSigned-offLevest Electric05/20/2021
DOB NOWSprinklersPermit IssuedAurora P & H Cont05/18/2021
DOB NOWPlumbingSigned-offSal Napoli Plumbing & Heating05/13/2021
DOB NOWGeneral ConstructionSigned-offSquan Construction Services03/31/2021
DOB NOWSidewalk ShedSigned-offMNK Enterprises01/19/2021
DOB NOWAntennaSigned-offIronbo12/23/2020
DOB NOWSidewalk ShedSigned-offMNK Enterprises02/20/2020
BISOTISSUEDCarrick Contracting03/31/2022
BISOTISSUEDCarrick Contracting04/21/2021
BISOTISSUEDElite Quality Construction10/08/2020
BISOTISSUEDOverland Contracting01/17/2019
BIS—ISSUEDCarrick Contracting10/30/2018
BISOTISSUEDFast Track Electric09/22/2017
BISOTISSUEDLevest Electric06/06/2016
BISOTISSUEDCharles M Dwyer10/15/2015
BISOTISSUEDBechtel Infrastructure An04/27/2015
BISBLISSUEDSal Napoli Plumbing & Heating08/07/2014
BISPLISSUEDSal Napoli Plumbing & Heating08/07/2014
BISOTISSUEDBechtel Infrastructure An08/06/2014
BISOTISSUEDBechtel Infrastructure An03/20/2014
BISOTISSUEDPinnacle Restoration01/24/2014
BISOTISSUEDPinnacle Restoration01/10/2014
+ 30 more permits on file
1 project · most recent 07/06/2021
FiledStatusContractorScope
07/06/2021Permit IssuedAurora P & H Cont3 heads
1 project · most recent 07/06/2021
Gas Water/Sanitary
FiledStatusContractorScope
07/06/2021Signed-offSal Napoli Plumbing & HeatingGas, Water/Sanitary
6 projects · most recent 09/09/2022
General Wiring
FiledStatusContractorScope
09/09/2022CompleteJoseph Weinstein ElectricGeneral Wiring
07/26/2021Permit IssuedKGB Electrical ContractingGeneral Wiring
03/04/2020CompleteLit Mode Electrical Contg—
02/17/2020Permit IssuedRichard Neu—
11/14/2019CompleteCharter ElectricGeneral Wiring
06/06/2019CompleteCrossland Management & EGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
11/13/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/01/2024Fail-Final General Construction Non-Directive 14FailView ↗
02/27/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/26/2022Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/29/2021Fail-Final SP - Up to 3 Requested FloorsFailView ↗
09/16/2021Fail-Final SP - Up to 3 Requested FloorsFailView ↗
09/13/2021Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/07/2021Fail-Final SP - Up to 3 Requested FloorsFailView ↗
08/11/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/11/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
10/17/2024Fire-Resistant Penetrations and JointsANTONIO GUALTIERIspecial
08/27/2024Fire-Resistant Penetrations and JointsANTONIO GUALTIERIspecial
07/17/2024MasonryRobert Marsacspecial
07/17/2024FinalRobert Marsacprogress
07/17/2024Tenant Protection Plan ComplianceRobert Marsacspecial
02/08/2024FinalNAVEEN KUMARprogress
02/05/2024FinalNAVEEN KUMARprogress
06/23/2023FinalANTONIO GUALTIERIprogress
06/23/2023Mechanical SystemsANTONIO GUALTIERIspecial
05/03/2023FinalANTONIO GUALTIERIprogress
05/03/2023Mechanical SystemsANTONIO GUALTIERIspecial
07/20/2021Sprinkler SystemsINHWAN CHANGspecial
07/20/2021Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
06/30/2021Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
06/30/2021Sprinkler SystemsINHWAN CHANGspecial
04/29/2021Fire-Resistant Penetrations and Joints—special
04/29/2021Sprinkler Systems—special
▾Documents — 422 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch11
08/27/2026Q00488575-P1Request digital key ↗
08/27/2026Q00488615-P1Request digital key ↗
08/26/2026Q00722752-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
08/27/2026Q00451718-P5Request digital key ↗
08/27/2026Q00451718-P1Request digital key ↗
08/15/2026Q00451718-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
08/27/2026Q00451718-P5Request digital key ↗
08/15/2026Q00451718-P1Request digital key ↗
08/15/2026Q00451718-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna2
08/15/2026Q00350494-I1Request digital key ↗
08/15/2026Q00124664-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/27/2026Q00316612-I1Request digital key ↗
08/15/2026Q00316612-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/27/2026Q00464152-I1Request digital key ↗
▸Applications & Permits82
▸BISPLAN / WORK APPROVAL APPLICATION47
05/23/2025421787187Open ↗
03/31/2022421787187Open ↗
03/22/2022421787187Open ↗
Showing 3 of 47 on file for this type
▸BISWORK PERMIT APPLICATION34
07/06/2021440622569Open ↗
10/08/2020440622569Open ↗
01/22/2019421530739Open ↗
Showing 3 of 34 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
10/09/2014440091776Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISPD1 FORM WITH BP TOPO UNIT VERIFICATION(ZR 12-10 #ZONING LOT#)1
03/30/2022421787187Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/21/2022421787187Open ↗
▸Seals & Professional Certifications84
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION34
01/22/2019421530739Open ↗
05/11/2018421331749Open ↗
10/03/2017421331749Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/28/2026Q00350494-I1Open ↗
08/27/2026Q00464152-I1Open ↗
08/27/2026Q00316612-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026Q00488575-P1Open ↗
08/31/2026Q00488615-P1Open ↗
08/31/2026Q00488615-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026Q00771946-I1Open ↗
09/01/2026Q00488575-P1Open ↗
08/28/2026Q00488575-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
09/30/2020440622569Open ↗
01/10/2014420936438Open ↗
Showing 2 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
09/30/2020440622569Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
01/10/2014420936438Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
09/30/2020440622569Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/05/2015440255705Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING4
10/09/2014420330626Open ↗
Showing 1 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
12/04/2014420330626Open ↗
10/02/2014420330626Open ↗
Showing 2 of 4 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL3
04/03/2019440255705Open ↗
01/05/2015420967859Open ↗
05/28/2014420967859Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
10/02/2014420330626Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
06/05/2019440255705Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection13
▸BISTenant Protection Plan and Notes5
06/05/2019440255705Open ↗
07/24/2017421530739Open ↗
04/08/2016421309541Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST3
03/21/2022421787187Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWTenant Protection Plan3
08/13/2026Q00350494-I1Open ↗
08/13/2026Q00316612-P1Open ↗
08/13/2026Q00316612-I1Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
12/27/2023421787187Open ↗
▸BISTENANT PROTECTION PLAN 2008 CODE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos35
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/27/2026Q00464152-I1Open ↗
08/27/2026Q00451718-P5Open ↗
08/27/2026Q00451718-P1Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
09/30/2020440622569Open ↗
07/24/2017421530739Open ↗
05/31/2016421331749Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance40
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
01/22/2019421530739Open ↗
05/11/2018421331749Open ↗
10/03/2017421331749Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
05/11/2021420967859Open ↗
04/02/2021421530739Open ↗
05/11/2018421331749Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
09/28/2022440622569Open ↗
01/17/2022421309541Open ↗
05/11/2021420967859Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
09/28/2022440622569Open ↗
01/17/2022421309541Open ↗
01/17/2022421309541Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/30/2020440622569Open ↗
Showing 1 of 2 on file for this type
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/28/2022440622569Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR8: Energy Code Progress Inspections1
03/05/2014420936438Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY8
01/17/2022421309541Open ↗
05/11/2021420967859Open ↗
04/02/2021421530739Open ↗
Showing 3 of 8 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
09/28/2022440622569Open ↗
▸BISMASONRY1
09/28/2022440622569Open ↗
▸Approvals, Objections & Sign-offs54
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
09/29/2022440622569Open ↗
01/18/2022421309541Open ↗
05/11/2021420967859Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS15
04/08/2016421309541Open ↗
08/04/2015421194371Open ↗
04/15/2014420967859Open ↗
Showing 3 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
06/01/2016421309541Open ↗
10/09/2014440091776Open ↗
09/12/2014440058143Open ↗
Showing 3 of 14 on file for this type
▸BISSUPERSEDING LETTER3
07/06/2021440622569Open ↗
11/23/2018400925415Open ↗
05/06/2015420967859Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
03/22/2022421787187Open ↗
03/11/2022421787187Open ↗
▸BISFINAL1
09/28/2022440622569Open ↗
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT31
05/11/2021420967859Open ↗
09/30/2020440622569Open ↗
09/01/2020421530739Open ↗
Showing 3 of 31 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
03/21/2022421787187Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/28/2022440622569Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms27
▸BISADDITIONAL INFORMATION11
09/01/2020421530739Open ↗
04/03/2019440255705Open ↗
09/29/2017421331749Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET11
02/09/2021421787187Open ↗
07/24/2017421530739Open ↗
05/31/2016421331749Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
09/30/2020440622569Open ↗
10/05/2015440255705Open ↗
Showing 2 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
07/06/2021440622569Open ↗
▸Other Documents5
▸DOB NOWDHCR Document4
08/13/2026Q00488575-I1Open ↗
08/13/2026Q00488615-P1Open ↗
08/13/2026Q00488615-I1Open ↗
Showing 3 of 4 on file for this type
▸BISDHCR DOCUMENT1
01/11/2021400925415Open ↗