← Back
QUEENS
78-48 73 PL
QUEENS · BIN 4090098
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open Violations
Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 22p · 1 filing · 6 docs
Floor 12p · 1 filing · 6 docs
Cellar3p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JFO CONSTRUCTION407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCALHEK112/24/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A&A BUILDING CONSULTANTS INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOP DOG PLBG & HTG CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519112/24/2020
Building Lifecycle
All (14)Filed (1)Permit Issued (2)Violation (4)Inspection (4)Special Inspection (3)
01/02/2024
Permit issued — Plumbing
Q00441978-I1-PL
10/19/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/08/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/14/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/08/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/04/2021
Violation issued (ECB, closed)
Construction
06/04/2021
Violation issued (ECB, closed)
Construction
05/25/2021
Permit issued — Plumbing
Q00441978-I1-PL
01/20/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Younes Abouyaala
01/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
01/14/2021
Special inspection requirement — Energy Code Compliance
Younes Abouyaala
12/24/2020
Filed — Alteration
Propose 3 piece bathroom at cellar, Relocate 3 piece bathroom (toilet, lavatory and bathtub). Propose 3 piece bathroom (shower, toilet and lavatory). 2nd Floor relocate (1.Bathtub, 1.toilet, and 1.lavatory). Propose 1 toilet, 1 lavatory, 1 shower.
Q00441978-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedTOP DOG PLBG & HTG CORP01/02/2024
DOB NOWPlumbingPermit IssuedTOP DOG PLBG & HTG CORP05/25/2021
BIS—ISSUEDCITY BUILDING CONSULTANTS10/21/2021
BIS—ISSUEDCITY BUILDING CONSULTANTS06/08/2021
1 project · most recent 06/24/2021
General Wiring
FiledStatusContractorScope
06/24/2021Permit IssuedJP & SON ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/08/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/14/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
01/20/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesYounes Abouyaalaspecial
01/14/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
01/14/2021Energy Code ComplianceYounes Abouyaalaprogress
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch - Plumbing1
08/27/2026Q00441978-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION2
05/28/2021440657111Open ↗
01/21/2021440657111Open ↗
▸BISWORK PERMIT APPLICATION2
10/22/2021440657111Open ↗
06/08/2021440657111Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
05/21/2021440657111Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
05/21/2021440657111Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISPD1 FORM WITH BP TOPO UNIT VERIFICATION(ZR 12-10 #ZONING LOT#)1
05/21/2021440657111Open ↗
▸BISVERIFY TAX LOT1
10/13/2022440657111Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/13/2022440657111Open ↗
▸BISZONING DIAGRAM1
04/15/2021440657111Open ↗
▸Seals & Professional Certifications5
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q00441978-I1Open ↗
08/28/2026Q00441978-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/24/2020440657111Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q00441978-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026Q00441978-I1Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
03/22/2021440657111Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/16/2021440657111Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00441978-I1Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
06/08/2021440657111Open ↗
05/19/2021440657111Open ↗
04/15/2021440657111Open ↗
▸BISFENESTRATION AIR LEAKAGE1
08/02/2022440657111Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
08/02/2022440657111Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/02/2022440657111Open ↗
▸BISFENESTRATION AREAS1
08/02/2022440657111Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
08/02/2022440657111Open ↗
▸BISLIGHTING IN DWELLING UNITS1
08/02/2022440657111Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/02/2022440657111Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/02/2022440657111Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY4
06/08/2021440657111Open ↗
05/19/2021440657111Open ↗
01/19/2021440657111Open ↗
Showing 3 of 4 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
08/02/2022440657111Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
01/19/2021440657111Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/02/2022440657111Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/02/2022440657111Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
08/02/2022440657111Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
01/19/2021440657111Open ↗
▸BISMECHANICAL SYSTEMS1
08/02/2022440657111Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/19/2021440657111Open ↗
01/19/2021440657111Open ↗
▸Cost, Insurance & Ownership2
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST1
10/22/2021440657111Open ↗
▸BISCOST AFFIDAVIT1
04/15/2021440657111Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
12/24/2020440657111Open ↗
▸BISADDITIONAL INFORMATION1
06/29/2021440657111Open ↗
▸BISBOROUGH INTAKE FORM1
10/22/2021440657111Open ↗
▸Other Documents3
▸BISSUSTAINABLE ROOF ZONE FORM1
12/24/2020440657111Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
08/02/2022440657111Open ↗
▸BISPLOT DIAGRAM1
03/22/2021440657111Open ↗