Primarily 2 family with 1 store or office
78 BEAVER STREET
BROOKLYN · BIN 3071800
💬 Discuss this project
1920Year Built
3Stories
S2Building Class
R7-2Zoning
2,508 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: KI TOV ASSOCIATES, LLC · 2,000 sf lot · 1.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeGeneral
Penthouse58p · 1 filing · 20 docs
Floor 450p · 1 filing · 20 docs
Floor 351p · 1 filing · 20 docs
Floor 253p · 1 filing · 20 docs
Floor 151p · 1 filing · 20 docs
Mezzanine65p · 1 filing · 20 docs
Cellar62p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS907/08/2026
KI TOV ASSOCIATES, LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/10/2018$156K—— → —$62/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DMYTRO CHORNOBRYVETS ARCHITECT,PLLC1108/04/2025
ADVANCED ENGINEERING & INSPECT. PLL703/19/2025
R & O ENGINEERING1003/18/2025
ASHRAF CORP310/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC5603/21/2026
KMA DESIGNS LLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLUE ELM INCGeneral Contractor1307/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor207/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56162508/04/2025
Building Lifecycle
All (220)Filed (31)Permit Issued (15)Signed Off (10)Violation (55)Inspection (9)Objection (70)Special Inspection (30)
12/02/2025
Violation issued (ECB, closed)
Construction
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/25/2025
Violation issued (HPD, closed)
B
08/19/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/19/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
08/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
08/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
08/19/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
08/19/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
08/19/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
08/19/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
08/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
08/19/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
08/19/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
08/19/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
08/19/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
08/19/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
08/19/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
08/19/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
08/19/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
08/19/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
08/19/2025
Special inspection requirement — Metering
FAHAD FATEH
08/04/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSING VERTICAL & HORIZONTAL ENLARGMENT TO AN EXISTING 3 STORY RESIDENTIAL BUILDING.
B00895336-B4
07/22/2025
Objection raised — Scope
07/22/2025
Objection resolved — Addressed
07/22/2025
Objection raised — Scope
07/22/2025
Objection resolved — Addressed
07/10/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSING VERTICAL & HORIZONTAL ENLARGMENT TO AN EXISTING 3 STORY RESIDENTIAL BUILDING.
B00895336-B3
07/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
07/09/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
07/09/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
07/09/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
07/09/2025
Special inspection requirement — Metering
FAHAD FATEH
07/09/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
07/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
07/09/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
06/10/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSING VERTICAL & HORIZONTAL ENLARGMENT TO AN EXISTING 3 STORY RESIDENTIAL BUILDING.
B00895336-B2
06/06/2025
Violation issued (HPD, closed)
A
05/08/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSING VERTICAL & HORIZONTAL ENLARGMENT TO AN EXISTING 3 STORY RESIDENTIAL BUILDING.
B00895336-S9
04/23/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSING VERTICAL & HORIZONTAL ENLARGMENT TO AN EXISTING 3 STORY RESIDENTIAL BUILDING.
B00895336-S3
04/23/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSING VERTICAL & HORIZONTAL ENLARGMENT TO AN EXISTING 3 STORY RESIDENTIAL BUILDING.
B00895336-S1
04/22/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSING VERTICAL & HORIZONTAL ENLARGMENT TO AN EXISTING 3 STORY RESIDENTIAL BUILDING.
B00895336-B1
04/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/04/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSING VERTICAL & HORIZONTAL ENLARGMENT TO AN EXISTING 3 STORY RESIDENTIAL BUILDING.
B00895336-Z1
04/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/01/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
03/26/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSING VERTICAL & HORIZONTAL ENLARGMENT TO AN EXISTING 3 STORY RESIDENTIAL BUILDING.
B00895336-S4
03/19/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSING VERTICAL & HORIZONTAL ENLARGMENT TO AN EXISTING 3 STORY RESIDENTIAL BUILDING.
B00895336-A9
03/18/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSING VERTICAL & HORIZONTAL ENLARGMENT TO AN EXISTING 3 STORY RESIDENTIAL BUILDING.
B00895336-A8
03/17/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/13/2025
Violation issued (ECB, closed)
Construction
03/13/2025
Violation issued (ECB, closed)
Unknown
03/13/2025
Violation issued (ECB, closed)
Construction
03/13/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/11/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSING VERTICAL & HORIZONTAL ENLARGMENT TO AN EXISTING 3 STORY RESIDENTIAL BUILDING.
B00895336-S2
03/10/2025
Permit issued — Sprinklers
B00895336-S1-EW-SP
03/07/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01059399-S1
Latest 60 of 220 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offA M B MECHANICAL INC03/10/2025
DOB NOWGeneral ConstructionPermit IssuedBLUE ELM INC02/19/2025
DOB NOWMechanical SystemsSigned-offBLUE ELM INC02/13/2025
DOB NOWStructuralSigned-offBLUE ELM INC11/01/2024
DOB NOWConstruction FenceSigned-offBLUE ELM INC09/20/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN08/27/2024
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS08/07/2024
DOB NOWGeneral ConstructionPermit IssuedBLUE ELM INC07/05/2024
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS05/31/2024
DOB NOWStructuralSigned-offBLUE ELM INC11/03/2023
DOB NOWFoundationSigned-offBLUE ELM INC11/02/2023
DOB NOWFoundationSigned-offBLUE ELM INC11/01/2023
DOB NOWSupport of ExcavationSigned-offBLUE ELM INC10/26/2023
DOB NOWGeneral ConstructionPermit IssuedBLUE ELM INC10/24/2023
DOB NOWConstruction FenceSigned-offBLUE ELM INC09/26/2023
1 project · most recent 08/04/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/04/2025Permit IssuedBLUE ELM INCHeating and Air Conditioning Systems
Heat / Cool
Daikin 5MXS48WMVJU9 18,500 BTU · Condensing Unit ×4
RMXS48LVJU 54,000 BTU · Condensing Unit ×2
RXTQ36TBVJUA 37,000 BTU · Vrf Outdoor ×2
RXF18AXVJU 12,600 BTU · Condensing Unit ×1
RZQ18TBVJUB 20,000 BTU · Vrf Outdoor ×1
1 project · most recent 08/04/2025
Sprinkler System
FiledStatusContractorScope
08/04/2025Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 08/04/2025
Storm Water/Sanitary
FiledStatusContractorScope
08/04/2025Signed-offA M B MECHANICAL INCStorm, Water/Sanitary
2 projects · most recent 05/15/2025
General Wiring
FiledStatusContractorScope
05/15/2025CompleteSAFEWAY CONSTRUCTION, INCGeneral Wiring
05/31/2024CompleteRICHARD NEU—
1 project · most recent 08/04/2025
Steel Concrete
FiledStatusContractorScope
08/04/2025Signed-offA M B MECHANICAL INCSteel, Concrete
1 project · most recent 08/04/2025
Fence
FiledStatusContractorScope
08/04/2025Signed-offA M B MECHANICAL INCFence
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/01/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/17/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/13/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/07/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/31/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/19/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/19/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
08/19/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
08/19/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/19/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
08/19/2025Protection of exposed foundation insulationFAHAD FATEHenergy_progress
08/19/2025Interior lighting powerFAHAD FATEHenergy_progress
08/19/2025Fenestration areasFAHAD FATEHenergy_progress
08/19/2025Lighting controlsFAHAD FATEHenergy_progress
08/19/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
08/19/2025Fenestration air leakageFAHAD FATEHenergy_progress
08/19/2025Exterior lighting powerFAHAD FATEHenergy_progress
08/19/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
08/19/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
08/19/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
08/19/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
08/19/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
08/19/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/19/2025Maintenance informationFAHAD FATEHenergy_progress
08/19/2025MeteringFAHAD FATEHenergy_progress
08/19/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
08/19/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
08/19/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
07/09/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
07/09/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/09/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
Latest 25 of 150.
▾Documents — 228 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch31
08/25/2026B00895336-S9Request digital key ↗
08/25/2026B00895336-I1Request digital key ↗
08/25/2026B00895336-S2Request digital key ↗
Showing 3 of 31 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
08/21/2025340918635Open ↗
06/12/2025340918635Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
06/12/2025340918635Open ↗
▸Zoning, Tax Lot & Property Records15
▸DOB NOWZD1: DOB Zoning Diagram10
08/13/2026B00895336-B1Open ↗
08/13/2026B00895336-P4Open ↗
08/13/2026B00895336-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026B00895336-P6Open ↗
08/13/2026B00895336-B3Open ↗
08/13/2026B00895336-B4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00895336-I1Open ↗
▸Seals & Professional Certifications93
▸DOB NOWSpecial Inspector Seal & Signature33
09/26/2026B00895336-S9Open ↗
09/10/2026B00895336-A3Open ↗
09/10/2026B00895336-A3Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
08/24/2026B01059399-I1Open ↗
08/24/2026B01059399-P1Open ↗
08/24/2026B01059399-S1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature27
09/26/2026B00895336-S9Open ↗
09/26/2026B00895336-S9Open ↗
09/10/2026B00895336-A3Open ↗
Showing 3 of 27 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/12/2025340918635Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/12/2025340918635Open ↗
▸Trade Schedules & Equipment10
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)10
08/13/2026B00895336-P4Open ↗
08/13/2026B00895336-I1Open ↗
08/13/2026B00895336-P6Open ↗
Showing 3 of 10 on file for this type
▸Safety & Tenant Protection5
▸BISBPP: STREET TREES SITE PLAN1
06/12/2025340918635Open ↗
▸BISSTREET TREE CHECKLIST1
06/12/2025340918635Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00895336-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00895336-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00895336-I1Open ↗
▸Environmental & Asbestos27
▸DOB NOWDEP ACP-5: Asbestos Assessment Report27
08/13/2026B00895336-S5Open ↗
08/13/2026B00895336-I1Open ↗
08/13/2026B00895336-B2Open ↗
Showing 3 of 27 on file for this type
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT6
08/13/2026B00895336-P7Open ↗
08/13/2026B00895336-P3Open ↗
08/13/2026B00895336-S4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026B00895336-S4Open ↗
08/13/2026B00895336-S6Open ↗
08/13/2026B00895336-S5Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
06/12/2025340918635Open ↗
▸Other Documents34
▸DOB NOWSite Survey: Initial10
08/13/2026B00895336-B2Open ↗
08/13/2026B00895336-B4Open ↗
08/13/2026B00895336-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone10
08/13/2026B00895336-B4Open ↗
08/13/2026B00895336-P1Open ↗
08/13/2026B00895336-B3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProperty Ownership Certification10
08/13/2026B00895336-B1Open ↗
08/13/2026B00895336-P4Open ↗
08/13/2026B00895336-A3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00895336-S5Open ↗
08/13/2026B00895336-S4Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
06/12/2025340918635Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00895336-I1Open ↗