78 HENDERSON AVENUE
STATEN ISLAND · St. George-New Brighton · BIN 5108584
💬 Discuss this project
1931Year Built
2Stories
C3Building Class
R2Zoning
3,444 sfGross Floor Area
4Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Four families · Owner of record: 78-80 HENDERSON AVE LLC · 4,680 sf lot · 0.74 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Attic8p · 1 filing · 9 docs
Floor 28p · 1 filing · 9 docs
Floor 18p · 1 filing · 9 docs
Cellar9p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
78-80 HENDERSON AVE LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGERS CALVANICO GROUP PLLC204/01/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CLAIRE CONSTRUCTION CORPGeneral Contractor407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738103/28/2025
Building Lifecycle
All (25)Filed (2)Permit Issued (2)Signed Off (2)Inspection (1)Special Inspection (18)
08/18/2025
Signed off — Alteration
ALTERATION FILING FOR THE RESTORATION OF A FIRE DAMAGE AT RIGHT SIDE OF BUILDING. ALL WORK TO BE DONE WITHIN EXISTING FOOTPRINT. NO CHANGE TO USE, OCCUPANCY, HEIGHT, BULK OR EGRESS.
S01201218-S1
08/13/2025
Signed off — Alteration
ALTERATION FILING FOR THE RESTORATION OF A FIRE DAMAGE AT RIGHT SIDE OF BUILDING. ALL WORK TO BE DONE WITHIN EXISTING FOOTPRINT. NO CHANGE TO USE, OCCUPANCY, HEIGHT, BULK OR EGRESS.
S01201218-I1
08/01/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/08/2025
Permit issued — Structural
S01201218-I1-ST
04/08/2025
Permit issued — Structural
S01201218-I1-GC
04/01/2025
Filed — Alteration
ALTERATION FILING FOR THE RESTORATION OF A FIRE DAMAGE AT RIGHT SIDE OF BUILDING. ALL WORK TO BE DONE WITHIN EXISTING FOOTPRINT. NO CHANGE TO USE, OCCUPANCY, HEIGHT, BULK OR EGRESS.
S01201218-S1
03/28/2025
Filed — Alteration
ALTERATION FILING FOR THE RESTORATION OF A FIRE DAMAGE AT RIGHT SIDE OF BUILDING. ALL WORK TO BE DONE WITHIN EXISTING FOOTPRINT. NO CHANGE TO USE, OCCUPANCY, HEIGHT, BULK OR EGRESS.
S01201218-I1
03/28/2025
Special inspection requirement — Maintenance information
anthony santoro
03/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
anthony santoro
03/26/2025
Special inspection requirement — Final
anthony santoro
03/26/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
03/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
03/26/2025
Special inspection requirement — Structural Wood Frame
anthony santoro
03/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
03/26/2025
Special inspection requirement — Fenestration air leakage
anthony santoro
03/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
03/26/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
03/26/2025
Special inspection requirement — Insulation placement and R values
anthony santoro
03/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
03/26/2025
Special inspection requirement — Air barrier - visual inspection
anthony santoro
03/26/2025
Special inspection requirement — Interior lighting power
anthony santoro
03/26/2025
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
03/26/2025
Special inspection requirement — Permanent certificate
anthony santoro
03/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
03/26/2025
Special inspection requirement — Fenestration areas
anthony santoro
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offCLAIRE CONSTRUCTION CORP04/08/2025
DOB NOWStructuralSigned-offCLAIRE CONSTRUCTION CORP04/08/2025
1 project · most recent 03/17/2025
General Wiring
FiledStatusContractorScope
03/17/2025CompleteFICHERA ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/01/2025Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
03/28/2025Maintenance informationanthony santoroenergy_progress
03/26/2025Structural Stability – Alterations of existing buildingsanthony santorospecial
03/26/2025Finalanthony santoroprogress
03/26/2025Energy Code Compliance Inspectionsanthony santoroprogress
03/26/2025Fire-Resistance Rated Constructionanthony santoroprogress
03/26/2025Structural Wood Frameanthony santoroprogress
03/26/2025HVAC-R and service water heating equipmentanthony santoroenergy_progress
03/26/2025Fenestration air leakageanthony santoroenergy_progress
03/26/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
03/26/2025Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
03/26/2025Insulation placement and R valuesanthony santoroenergy_progress
03/26/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
03/26/2025Air barrier - visual inspectionanthony santoroenergy_progress
03/26/2025Interior lighting poweranthony santoroenergy_progress
03/26/2025Duct leakage testing, insulation and designanthony santoroenergy_progress
03/26/2025Permanent certificateanthony santoroenergy_progress
03/26/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
03/26/2025Fenestration areasanthony santoroenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026S01201218-I1Request digital key ↗
08/19/2026S01201218-S1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026S01201218-I1Open ↗
08/19/2026S01201218-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026S01201218-I1Open ↗
08/25/2026S01201218-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026S01201218-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026S01201218-I1Open ↗
08/19/2026S01201218-S1Open ↗