← Back
Two family frame
78 HOLTEN AVENUE
STATEN ISLAND · BIN 5175557
💬 Discuss this project
2021Year Built
2Stories
B2Building Class
R3XZoning
—Gross Floor Area
2Units
Two family frame · Owner of record: AI MIND REALTY LLC · 0.67 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KNOX STREET BUILDERS303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RS ENGINEERING & LAND SURVEYING103/31/2022
WILLIAM MONTAGUE ENGINEER111/15/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MASTER BUILT HOMES INCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA PLANNING & EXPEDITING5677111/15/2021
Building Lifecycle
All (8)Filed (2)Permit Issued (1)Signed Off (2)Inspection (1)Special Inspection (2)
11/01/2022
Signed off — Alteration
PROPOSED 1-1/2" DOMESTIC WITH A SP TAKE OFF SERVICE
S00631386-I1
08/01/2022
Signed off — Alteration
18' shared curb cut. Shared with Block 6677, Lot 34 - 82 Holten Avenue
S00179574-I1
07/18/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/13/2022
Permit issued — Curb Cut
S00179574-I1-CC
03/31/2022
Filed — Alteration
18' shared curb cut. Shared with Block 6677, Lot 34 - 82 Holten Avenue
S00179574-I1
11/15/2021
Filed — Alteration
PROPOSED 1-1/2" DOMESTIC WITH A SP TAKE OFF SERVICE
S00631386-I1
11/15/2021
Special inspection requirement — Sprinkler Systems
WILLIAM MONTAGUE
11/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMASTER BUILT HOMES INC07/13/2022
BIS—ISSUEDMASTER BUILT HOMES INC03/14/2022
BISPLISSUEDJB BUZCO PLUMBING LLC09/29/2021
1 project · most recent 09/19/2022
General Wiring
FiledStatusContractorScope
09/19/2022CompleteB & R ELEC'L CONTR'G, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/18/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
11/15/2021Sprinkler SystemsWILLIAM MONTAGUEspecial
11/15/2021Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
▾Documents — 105 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Curb Cut1
08/24/2026S00179574-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/25/2026S00631386-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION6
09/28/2022520357863Open ↗
09/28/2022520357863Open ↗
04/19/2021520357863Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
04/20/2021520393985Open ↗
04/20/2021520393985Open ↗
▸BISWORK PERMIT APPLICATION2
09/29/2021520357863Open ↗
05/25/2021520357863Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
05/06/2021520357863Open ↗
04/20/2021520393985Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/27/2021520357863Open ↗
▸BISVERIFY TAX LOT1
09/12/2022520357863Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
04/27/2021520357863Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
07/29/2019520357863Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/12/2022520357863Open ↗
▸BISZONING DIAGRAM1
05/06/2021520357863Open ↗
▸Seals & Professional Certifications7
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
06/26/2019520357863Open ↗
06/26/2019520357863Open ↗
06/26/2019520357863Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026S00179574-I1Open ↗
08/13/2026S00631386-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026S00631386-I1Open ↗
09/23/2026S00631386-I1Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING2
09/28/2022520357863Open ↗
09/28/2022520357863Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
10/11/2022520357863Open ↗
10/11/2022520357863Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
10/11/2022520357863Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/26/2019520357863Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
04/27/2021520357863Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
08/17/2022520357863Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
08/17/2022520357863Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/25/2021520357863Open ↗
▸BISSTREET TREE CHECKLIST1
06/26/2019520357863Open ↗
▸BISSTREET TREE SIGNOFF1
10/05/2022520357863Open ↗
▸Energy Compliance12
▸BISAIR SEALING AND INSULATION - VISUAL1
10/11/2022520357863Open ↗
▸BISINTERIOR LIGHTING POWER1
10/11/2022520357863Open ↗
▸BIS* SOLAR READY REQUIREMENTS1
10/11/2022520357863Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
10/11/2022520357863Open ↗
▸BISFENESTRATION AREAS1
10/11/2022520357863Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
10/11/2022520357863Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/27/2021520357863Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
10/11/2022520357863Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/11/2022520357863Open ↗
▸BIS* HVAC INSULATION AND SEALING1
10/11/2022520357863Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/26/2019520357863Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/11/2022520357863Open ↗
▸Inspections & Test Reports12
▸BISBPP-9 - Request for Builders Pavement Field Inspection2
04/20/2021520393985Open ↗
04/20/2021520393985Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
09/12/2022520357863Open ↗
05/25/2021520357863Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
05/06/2021520357863Open ↗
04/27/2021520357863Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/11/2022520357863Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
10/11/2022520357863Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
10/11/2022520357863Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
10/11/2022520357863Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
10/11/2022520357863Open ↗
▸BISSOIL REPORT1
05/06/2021520357863Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSCHEDULE A - OCCUPANCY / USE4
09/28/2022520357863Open ↗
09/28/2022520357863Open ↗
07/29/2019520357863Open ↗
Showing 3 of 4 on file for this type
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL2
04/27/2021520357863Open ↗
04/20/2021520393985Open ↗
▸BISSUBDIVISION SIGNOFF1
04/27/2021520357863Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION4
10/03/2022520357863Open ↗
05/06/2021520357863Open ↗
04/27/2021520357863Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
05/04/2020520393985Open ↗
06/26/2019520357863Open ↗
▸Other Documents14
▸BISNYS DEC FRESHWATER WETLANDS MAP2
04/27/2021520357863Open ↗
04/20/2021520393985Open ↗
▸BISSHUTOFF DAMPERS1
10/11/2022520357863Open ↗
▸BISWAIVER OF CURB ALIGNMENT AND SIDEWALK IN KNOX STREET1
04/20/2021520393985Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
04/20/2021520393985Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
04/20/2021520393985Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
10/11/2022520357863Open ↗
▸BISWAIVER OF CURB ALIGNMENT AND SIDEWALK IN MAC GREGOR STREET1
04/20/2021520393985Open ↗
▸BISWAIVER OF SIDEWALK WIDTH IN ALL STREETS.1
04/20/2021520393985Open ↗
▸BISMAINTENANCE INFORMATION1
10/11/2022520357863Open ↗
▸BISSTREET: NEW STREET NAME APPROVED1
04/27/2021520357863Open ↗
▸BISPERMANENT CERTIFICATE1
10/11/2022520357863Open ↗
▸BISBPP: FILING REQUIRED1
04/27/2021520357863Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
10/11/2022520357863Open ↗