ECB05/20/2026At the time of my inspection i observed construction site enclosed with construction fence and no job information panel provided as required$6K due
ECB05/20/2026Atoi of active job site upon asking for construction superintended/designated competent person-none available,uppon asking workers for cs log book, site safety plan,preshift/orientation log books-none were read$10K due
ECB05/20/2026At the time of my inspection i observed construction fence at exp#1 not maintained/constructed as per code-big amount of graffiti,viewing panel covered with graffiti,broken plywood at exp#2$5K due
ECB03/13/2026No en drawing and architectural drawing approved from DOB provided on the job site at the time of inspection., maintain/display required documents; please submit permit to energycodeinspections@buildings.NYC.go$1K due
ECB02/09/2026At the time of my inspection of a 4-story building, i observed styrofoam residue throughout the street and adjoining property, creating a hazardous condition to the public and property. Stop all styrofoam and s$5K due
ECB02/09/2026Bc 3301.2 active construction site, observes materials, tools, and bricks were stored at the leading edge. The only means of access was a ladder not extended three feet above the landing and without a guardrail$2K due
ECB01/29/2026At time of inspection observed: supported scaffold in place at exposure# 1 of site loose netting debris and tear apart not maintained contrary to bc 3314.8.2 creating unsafe conditions. Materials, debris, tools$2K due
ECB01/29/2026At time of inspection in a proposed 4 story new building observed: site closed no access, no construction activities. Pedestrian walkway at sidewalk not maintained/inadequate iced at exposure# 1 not in complian$1K due
ECB01/23/2026At time of inspection observed: sidewalk shed installed at expo# 1. No underside lighting inoperable light bulbs, failure to maintain as per code 3307.6.4.8 become an unsafe and hazardous condition for pedestri$2K due
ECB12/31/2025At the time of inspection active site, while responding to a complaint concerning work contrary to stop work orders. I peep through window panel where i visually observed at least 7 workers present inside of th$3K due
ECB10/31/2025At time of inspection observed: missing overhead protection at corner exposure# 2-3 and 3-4 in a proposed 4 story + penthouse new building at roof level; creating an unsafe hazardous condition for adjoining occ$5K due
ECB10/31/2025At time of inspection observed: missing roof protection for adjoining property at exposure# 4 in a proposed 4 story + penthouse new building at roof level; creating an unsafe hazardous condition for adjoining o$2K due
ECB10/28/2025At time of inspection observed ongoing construction operations from workers onsite. Attempts to gain access were made by knocking and signaling workers to open jobsite. The works denied access and walked up the$2K due
ECB10/28/2025At time of inspection, observed public sidewalk in front of job site with defects. Cracks and debris caused by the construction operations noticed on the public walkway create slipping and tripping hazard as re$2K due
ECB06/13/2025Failure to maintain/display onsite documents required by bc chapter 33AS noted at time of inspection at the above site observed that document provided did not have the DOB approval or the engineer of record(eor$1K due